A
Summary Introduction
Interpretation: A recommended plan to the management is to be proposed and supported.
Concept Introduction: The Company has in its consideration two work-force plans for the coming year.
B
Summary Introduction
Interpretation: Workforce plan that can be recommended considering the proposed changes is to be determined.
Concept Introduction: The Company has in its consideration two work-force plans for the coming year.
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
Jefferson Company’s demand for its only product exceeds its manufacturing capacity. The company provided the following information for the machine whose limited capacity is prohibiting the company from producing and selling additional units.
Actual run time this week
6,106
minutes
Machine time available per week
8,600
minutes
Actual run rate this week
4.32
units per minute
Ideal run rate
6.00
units per minute
Defect-free output this week
11,315
units
Total output this week (including defects)
15,500
units
1. Compute the utilization rate.2. Compute the efficiency rate. 3. Compute the quality rate. 4. Compute the overall equipment effectiveness (OEE).
The school cafeteria can make pizza for approximately $0.30 per slice. The cost of the kitchen use and cafeteria staff runs about $200 per day. The Pizza Den nearby will deliver whole pizzas for $9.00 each. The cafeteria staff cuts the pizza into eight (8) pieces and serves them in the usual cafeteria line. With no cooking duties, the staff can be reduced by half, for a fixed cost of $75 per day. Should the school cafeteria make or buy its pizzas? Calculations are needed to justify the answer.
The school cafeteria can make pizza for approximately $0.30 per slice. The cost of the kitchen use and cafeteria staff runs about $200 per day. The Pizza Den nearby will deliver whole pizzas for $9.00 each. The cafeteria staff cuts the pizza into eight (8) pieces and serves them in the usual cafeteria line. With no cooking duties, the staff can be reduced by half, for a fixed cost of $75 per day.
Should the school cafeteria make or buy pizza?
Calculations are needed to justify the answer.
Excel spreadsheet is optional.
Chapter D Solutions
Operations Management: Processes And Supply Chains (12th Global Edition) - Does Not Include Mylab Operations Management
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, operations-management and related others by exploring similar questions and additional content below.Similar questions
- The university has an ongoing community project in which it uses a machine in its mechanical engineering lab to provide an investment income for the university. The machine can produce 100 widgets per hour. The lab operates 12 hours per day, five days per week. Due to regularly scheduled preventive maintenance, the lab expects the machine to be running during approximately 95% of the available time. Based on experience with other products, the lab expects to achieve an efficiency level for the widgets of 85%. What is the expected weekly output of widgets for this labarrow_forwardGalaxy Candy Company manufactures two popular candy bars, the Eclipse bar and the Nova bar. Both candy bars go through a mixing operation where the various ingredients are combined, and the Coating Department where the bars from the Mixing Department are coated with chocolate. The Eclipse bar is coated with both white and dark chocolate to produce a swirled effect. A material shortage of an ingredient in the Nova bar limitsproduction to 300 batches per hour. Production and sales data are presented in the following table. Mixing CoatingAvailable capacity in hours 525 500Use of capacity in hours per batch of product: Eclipse 1.5 2.0 Nova…arrow_forwardCharles Lackey operates a bakery in Idaho Falls, Idaho. Because of its excellent product and excellent location, demand has increased by 25% in the last year. On far too many occasions, customers have not been able to purchase the bread of their choice. Because of this size of the store, no new ovens can be added. At a staff meeting, one employee suggested ways to load the ovens differently so that more loaves of bread can be baked at one time. This new process will requrie that the ovens be, loaded by hand, requiring additional manpower. This is the only production change that will be made in order to meet the increased demand. The bakery currently makes 1,600 loaves per month. Employees are paid $8 per hour. In addition to the labor cost, Charles also has a constant utility cost per month of $700 and a per loaf ingredient cost of $0.50. Current multifactor productivity for 640 work hours per month= .242 loaves/dollar (round your response to three decimal places). After increasing…arrow_forward
- Knott's Berry Farm is contemplating buying a new van for its operations. The farm's engineering staff has researched the market and found 2 units that appear to meet their requirements. Truck # 1 has a cost of $37,000 and requires an annual maintenance cost of $2,700. At the end of its useful life (3 years), it is projected to have a salvage value of $5,000. On the other hand, Truck #2 has an initial cost of $40,000 and requires only $2,000 in annual operating costs because the manufacturer is claiming that some routine maintenance is covered in the price of the truck. Truck # 2 has an estimated salvage value of $8,000 at the end of its 4 year service life. The CEO has determined that the farm's MARR is 12%. The trucks are needed for 12 years according to the 2024 Strategic Plan. The Engineering Department has determined that no significant changes are needed in the future that would change prices and functional characteristics of each truck. As a member of the Engineering Department,…arrow_forwardA restaurant has a capacity of serve 150 customers during the dinner time from 5 to 9 pm. In a typical evening, the restaurant serves an average of 120 customers. What is the restaurant's capacity cushion? a. 20% b. 67% c. 25% d. 50%arrow_forwardThe school cafeteria can make pizza for approximately $0.30 a slice. The cost of kitchen use and cafeteria staff runs about $185 per day. The Pizza Den nearby will deliver whole pizzas for $9.25 each. The cafeteria staff cuts the pizza into 8 slices and serves them in the usual cafeteria line. With no cooking duties, the staff can be reduced by half, for a fixed cost of $90 per day. Should the school cafeteria make or buy its pizzas? (Round answers to 2 decimal places, e.g. 52.75.) 2.40 13.87 make : buy If more than students want pizza for lunch, the cafeteria should its own. Otherwise, they should from Pizza Den.arrow_forward
- The manager of a car wash must decide whether to have one or two wash lines. One line will mean a fixed cost of RM6000 a month, and two lines will mean a fixed cost of RM10500 a month. Each line would be able to process 15 cars an hour. Variable costs will be RM3 per car, and revenue will be RM5.95 per car. The manager projects an average demand of between 14 and 18 cars an hour. Would you recommend one or two lines? The car wash is open 300 hours a month.arrow_forwardAn airline company must plan its fleet capacity and its long-term schedule of aircraft usage. For one flight segment, the average number of customers per day is 70, which represents a 65 percent utilization rate of the equipment assigned to the flight segment. If demand is expected to increase to 92 customers for this flight segment in three years, what capacity requirement should be planned? Assume that management deems that a capacity cushion of 15 percent is appropriate. The needed capacity requirement is_____________customers per day. (Enter your response rounded up to the next whole number.)arrow_forwardKnott’s Industries manufactures standard and super premium backyard swing sets. Currently it has four identical swing-set-making machines, which are operated 250 days per year and 8 hours each day. A capacity cushion of 20 percent is desired. The following information is also known: Standard Model Super PremiumModel Annual Demand Standard Processing Time Average Lot Size Standard Setup Time per Lot 20,000 7 min 50 30 min 10,000 20 min 30 45 min a. Does Knott’s have sufficient capacity to meet annual demand?b. If Knott’s was able to reduce the setup time for the Super Premium Model from 45 minutes to 30 minutes, would there be enough current capacity to produce 20,000 units of each type of swing set?arrow_forward
- Taco House Taco House has a special on Wednesday nights from 5:00-10:00 PM: $5 for a Mega Taco. There are two cooks on duty during this time. They have an 80% utilization and a 90% efficiency. If it requires 4 minutes to prepare a Mega Taco, approximately how many Mega Tacos is Taco House able to produce during the Wednesday night special? Group of answer choices 108 162 216 153 182 144arrow_forwardA company offers ID theft protection using leads obtained from client banks. Three employeeswork 40 hours a week on the leads, at a pay rate of $25 per hour per employee. Each employeeidentifies an average of 3,000 potential leads a week from a list of 5,000. An average of 4 percentactually sign up for the service, paying a one-time fee of $70. Material costs are $1,000 per week,and overhead costs are $9,000 per week. Calculate the multifactor productivity for this operation infees generated per dollar of input.arrow_forwardAn airline company must plan its fleet capacity and its long-term schedule of aircraft usage. For one flight segment, the average number of customers per day is 70, which represents a 65 percent utilization rate of the equipment assigned to the flight segment. If demand is expected to increase to 80 customers for this flight segment in three years, what capacity requirement should be planned? Assume that management deems that a capacity cushion of 20 percent is appropriate. what the needed capacity requirement is ----------- customers per day. (Enter your response rounded up to the next whole number.)arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Practical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,
Practical Management Science
Operations Management
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:Cengage,
Single Exponential Smoothing & Weighted Moving Average Time Series Forecasting; Author: Matt Macarty;https://www.youtube.com/watch?v=IjETktmL4Kg;License: Standard YouTube License, CC-BY
Introduction to Forecasting - with Examples; Author: Dr. Bharatendra Rai;https://www.youtube.com/watch?v=98K7AG32qv8;License: Standard Youtube License