Concept explainers
New England Foundry
For more than 75 years, New England Foundry, Inc., (NEFI), has manufactured wood stoves for home use. In recent years, with increasing energy prices, President George Mathison has seen sales triple. This dramatic increase has made it difficult for George to maintain quality in all his wood stoves and related products.
Unlike other companies manufacturing wood stoves, NEFI is in the business of making only stoves and stove-related products. Its major products are the Warmglo I, the Warmglo II, the Warmglo III, and the Warmglo IV. The Warmglo I is the smallest wood stove, with a heat output of 30,000 BTUs, and the Warmglo IV is the largest, with a heat output of 60,000 BTUs.
The Warmglo III outsold all other models by a wide margin. Its heat output and available accessories were ideal for the typical home. The Warmglo III also had a number of other outstanding features that made it one of the most attractive and heat-efficient stoves on the market. These features, along with the accessories, resulted in expanding sales and prompted George to build a new factory to manufacture the Warmglo III model. An overview diagram of the factory is shown in Figure D.6.
Figure D.6 Overview of Factory
The new foundry used the latest equipment, including a new Disamatic that helped in manufacturing stove parts. Regardless of new equipment or procedures, casting operations have remained basically unchanged for hundreds of years. To begin with, a wooden pattern is made for every cast-iron piece in the stove. The wooden pattern is an exact duplicate of the cast-iron piece that is to be manufactured. All NEFI patterns are made by Precision Patterns, Inc. and are stored in the pattern shop and maintenance room. Next, a specially formulated sand is molded around the wooden pattern. There can be two or more sand molds for each pattern. The sand is mixed and the molds are made in the molding room. When the wooden pattern is removed, the resulting sand molds form a negative image of the desired casting.
Next, molds are transported to the casting room, where molten iron is poured into them and allowed to cool. When the iron has solidified, molds are moved into the cleaning, grinding, and preparation room, where they are dumped into large vibrators that shake most of the sand from the casting. The rough castings are then subjected to both sandblasting to remove the rest of the sand and grinding to finish some of their surfaces. Castings are then painted with a special heat-resistant paint, assembled into workable stoves, and inspected for manufacturing defects that may have gone undetected. Finally, finished stoves are moved to storage and shipping, where they are packaged and transported to the appropriate locations.
At present, the pattern shop and the maintenance department are located in the same room. One large counter is used by both maintenance personnel, who store tools and parts (which are mainly used by the casting department), and sand molders, who need various patterns for the molding operation. Pete Nawler and Bob Dillman, who work behind the counter, can service a total of 10 people per hour (about 5 per hour each). On average, 4 people from casting and 3 from molding arrive at the counter each hour. People from molding and casting departments arrive randomly, and to be served, 1hey form a single line.
Pete and Bob have always had a policy of first come, first served. Because of the location of the pattern shop and maintenance department, it takes an average of 3 minutes for an individual from the casting department to walk to the pattern and maintenance room, and it takes about 1 minute for an individual to walk from the molding department to the pattern and maintenance room.
After observing the operation of the pattern shop and maintenance room for several weeks, George decided to make some changes to the factory layout. An overview of these changes appears in Figure D.7.
Figure D.7 Overview of Factory after Changes
Separating the maintenance shop from the pattern shop would have a number of advantages. It would take people from the casting department only 1 minute instead of 3 to get to the new maintenance room. The time from molding to the pattern shop would be unchanged. Using motion and time studies, George was also able to determine that improving the layout of the maintenance room would allow Bob to serve 6 people from the casting department per hour; improving the layout of the pattern department would allow Pete to serve 7 people from the molding shop per hour.
3. Should George have made the change in layout?
Want to see the full answer?
Check out a sample textbook solutionChapter D Solutions
Operations Management
- Determine how TCAS have played a role in a flight safety without any support from air traffic controllers in the ground stations by analyzing the function of its componentsarrow_forwardIn a car manufacturing company, an automated painting process has been introduced, and the quality assurance team suspects there might be issues that require investigation. The team decides to conduct a root cause analysis to identify potential problems. Through the root cause analysis and further investigation, it appears that the drying time of the paint in minutes is affecting the overall quality of the finish. The aspect they need to examine is the variation in drying time across different colours of paint. Considering the ongoing concerns in the painting process, the team chooses to collect a sample of six drying time measurements every 20 minutes from various colours of paint. The recorded drying time values for a day's production are presented in Table 1. A total of 10 sets of measurements, each consisting of six drying time values in minutes, have been collected. Each time a set of measurements is taken, the individual drying time values are recorded. Table 1: Drying Time…arrow_forwardQuality management is the process of ensuring that products or services meet or exceed customer expectations. It involves identifying quality standards, establishing processes to meet those standards, and continuously monitoring and improving performance. Quality management encompasses various methodologies and tools, such as Total Quality Management (TQM), Six Sigma, and Lean Management, to enhance efficiency and effectiveness while minimizing defects and errors. Key components of quality management include quality planning, quality control, quality assurance, and continuous improvement. By prioritizing quality throughout all stages of production or service delivery, organizations can enhance customer satisfaction, build brand reputation, and achieve sustainable success in the marketplace. Question: How does implementing quality management principles contribute to reducing costs and improving profitability for organizations?arrow_forward
- Bashaer is a millionaire but always buy a TOYOTA ACCORD even though he can afford Mercedes Benz sports car. Nayef on the other hand cannot afford to buy BMW, but he made a bank loan to purchase the BMW Coupé for half a million dollars. Explain why they choose those cars by describing through the Customer’s Lifetime Value (CLV) Assessments. Explain the importance of the Customer Profile Components of Nayef and Bashaer.arrow_forwardTotal Quality Management (TQM) is defined as a customer-oriented process and aims for continuous improvement of business operations. It ensures that all allied works (particularly work of employees) are toward the common goals of improving product quality or service quality, as well as enhancing the production process or process of rendering of services. Suggest the key principles and the essential requirements for a successful implementation of TQMarrow_forwardI need help with part c of the question.arrow_forward
- IV. The following data represent the number of dishes that are broken at a restaurant while loading and unloading the dishwasher. The total number of dishes washed varies daily. Construct a p chart for these data. What can you conclude about the situation? Do you have any recommendations? Total Number of dishes washed 465 425 500 Day Number of broken Day Total Number of dishes Number of broken dishes 51 42 washed 465 dishes 39 1 13 14 425 500 500 41 15 16 55 51 4 500 53 47 425 425 425 44 17 18 19 425 425 425 38 44 41 39 41 465 47 20 465 48 500 500 425 465 56 43 46 21 465 500 500 42 10 22 23 47 51 11 12 49 24 465 36arrow_forwardThe purpose of a Business Impact Analysis (BIA) is to determine: Choose the correct answer? The cost to repair a failed system The extent of a disaster's damage Critical business processes that must be maintained How often an incident will occurarrow_forwardwrite Each variable in the table below has a corresponding indicator (measurement) from the literature? Nb: independent variable:awareness,convenience and benifit, transection mode of online,preventive management dependent variable: cybercrime, development of ecommercearrow_forward
- Improved quality of products and services Enhanced customer preference. Explain with examplesarrow_forwardWhat factors have contributed to the increased awareness of quality in modem business?arrow_forwardWhich of the following is/are included in “safety needs”, according to Abraham Maslow? a. Protection from economic and physical environment b. Protection from only economic environment c. None of the given options d. Protection from only physical environmentarrow_forward