Chapter B, Problem 23P
Summary Introduction
To determine: The mix of class of containers will maximize the weekly profit.
Introduction:
Linear programming:
It is a linear optimization technique followed to develop the best outcome for the linear programming problem. The outcome might be to maximize profit, minimize cost, or to determine the optimal product mix. The outcome will take the constraints present in achieving the solution into consideration.
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
Sitka Industries uses a cost system that carries direct materials inventory at a standard cost. The controller has established these standards for one ladder (unit):
StandardQuantity
x
StandardPrice
=
StandardCost
Direct materials
3 pounds
$4.50 per pound
$13.50
Direct labor
2.00 hours
12.00 per hour
24.00
Total cost
$37.50
Sitka Industries made 2,900 ladders in July and used 8,500 pounds of material to make these units. Sitka Industries bought 15,400 pounds of material in the current period. There was a $300 unfavorable direct materials price variance.
Enter all amounts as positive numbers.
A. How much in total did Sitka pay for the 15,400 pounds?
B. What is the direct materials quantity variance?
C. What is the total direct materials cost variance?
D. What if 9,200 pounds were used to make these ladders, what would be the direct materials quantity variance?
E. If there was a $340 favorable direct materials price variance, how much did Sitka pay…
In a large microelectronics plant, the assembly cell for circuitboards has a demand for 200 units an hour. Two feeder cellssupply parts A and B to the assembly cell (one A and one Bfor each board). Standard containers that look like dividedtrays are used. A container will hold 20 As or 10 Bs. It takes10 minutes to fill up a container with As and 20 minutes tofill up a container with Bs. Transit time to the assembly cell is5 minutes for both A and B. No safety factor is used. Set up akanban control system for the assembly process.
A company produces and sells
electronic components that are
purchased by computer
manufacturers. The company just
received an order for 3000 circuit
boards that must be delivered to the
customer in 28 days. Shipping takes 4
days and every production run for this
component takes 3 days for any
quantity of circuit boards between
1800 and 4200.
The Bill of Materials (listing the
materials and quantities required to
produce a single circuit board ordered)
is in the table below:
Quantity
Component Required
Input
Bare printed
1
board
Сарacitor
8
Op amp
Resistor
4
Transistor
3.
Chapter B Solutions
Operations Management
Ch. B - Prob. 1DQCh. B - Prob. 2DQCh. B - Prob. 3DQCh. B - Prob. 4DQCh. B - Prob. 5DQCh. B - Prob. 6DQCh. B - Prob. 7DQCh. B - Prob. 8DQCh. B - Prob. 9DQCh. B - Prob. 10DQ
Ch. B - Prob. 11DQCh. B - Where a constraint crosses the vertical or...Ch. B - Prob. 13DQCh. B - Prob. 1PCh. B - Prob. 2PCh. B - Prob. 3PCh. B - B.4. Consider the following linear programming...Ch. B - Prob. 5PCh. B - Prob. 6PCh. B - Prob. 7PCh. B - Prob. 8PCh. B - Green Vehicle Inc. manufactures electric cars and...Ch. B - Prob. 10PCh. B - Prob. 11PCh. B - Prob. 12PCh. B - The LP relationships that follow were formulated...Ch. B - Prob. 14PCh. B - Prob. 15PCh. B - Prob. 16PCh. B - Prob. 17PCh. B - Prob. 18PCh. B - Prob. 19PCh. B - Prob. 20PCh. B - Prob. 21PCh. B - Prob. 22PCh. B - Prob. 23PCh. B - How many corner points are there in the feasible...Ch. B - Prob. 25PCh. B - Prob. 26PCh. B - A fertilizer manufacturer has to fulfill supply...Ch. B - Prob. 28PCh. B - Bowman Builders manufactures steel storage sheds...Ch. B - Prob. 30PCh. B - Quain Lawn and Garden, Inc Bill and Jeanne Quain...Ch. B - Quain Lawn and Garden, Inc Bill and Jeanne Quain...
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, operations-management and related others by exploring similar questions and additional content below.Similar questions
- A tricycle factory uses 3 tires , 1 frame, and 2 pedals . If the factory. has available 270 tires, 90 frames, and 170 pedals , which item would limit the number of complete tricycles that can be assembled ? Explain your choice. A)tires. B) frames C) pedals D) both tires and framesarrow_forwardA warehouse, just outside of Montreal, gets a daily shipment of a USB connector product. The daily demand of this product is 1850. The products are first placed in storage (waiting stage) at the entrance of the warehouse where on average there are 320 products. A Receiving clerk picks the products from storage and verifies them (assure quality stage). It takes the clerk 0.01 days to verify each product. Then the products are sorted and packaged (sorting stage) into three streams: Ottawa (20% of products), Laval (30% of products), and Montreal (50% of products). On average, there are 380 products being sorted. After, three shipping stations load the products into trucks heading to each location respectively (Montreal, Laval, and Ottawa). The loading stage takes 0.004, 0.01 days, and 0.08 days for the destination of Montreal, Laval, and Ottawa respectively for each product (last stage of process). On Average, how many hours does a product spend in the warehouse (assuming 8 hours in a…arrow_forwardA company processes feathers and ships them loose in a covered truck. The linehaul cost for an average shipment is $600, and the truck carries 2000 pounds offeathers. A bright new graduate has just been hired and has suggested that theyshould bale the feathers into 500-pound bales. This would make them easier tohandle and also allow them to be compressed into about one-tenth of the space theynow occupy. How many pounds of feathers can the truck now carry? What is thepresent line haul cost per pound? What will it be if the proposal is adopted?arrow_forward
- Bhatti Company produces plastic photo frames. Two departments, molding and finishing, are involved in the manufacturing. The molding department fills the molds with hot liquid plastic that is left to cool and then opens them. The finishing department removes the plastic frame from the mold and strips the edges of the frames of extra plastic. The following information is available for the month of January: January 1 Quantity (pounds) January 31 Quantity (pounds) Work-in-Process Inventory Cost Cost Molding department Finishing department None None 5,000 $ 15,000 2,000 The WIP Inventory in the finishing department is estimated to be 40% complete for conversion both at the beginning and end of January. Costs of production for January follow: Direct Costs of Production Materials Conversion Molding department Finishing department $ 450,000 $ 90,000 80,290 The molding department started 50,000 pounds of product in January. The firm uses the FIFO method of process costing. Required: 1. Prepare…arrow_forwardmanagment information systemarrow_forwardA Company produces a component for use in the aerospace industry. The component consists of three parts (A, B and C), which are purchased externally and cost 50c, 60c and 70c per piece respectively. Parts A and B are assembled first on assembly line 1, which produces 150 components per hour. Part C undergoes a drilling operation before being finally assembled with the output from assembly line 1. There are six drilling machines in total, but only three are currently operational. Each drilling machine drills part C at a rate of 30 parts per hour. The final assembly line has a production capacity of 100 components per hour. At present, components are produced eight hours a day, five days a week. If the need arises, management can add a second shift of eight hours for the assembly lines only. The cost of assembly labour is 40c per assembly operation for each assembly line; the cost of drilling labour is 20c per part. For drilling, the cost of electricity is 10c per part. The overhead cost…arrow_forward
- 13.20. Southwood Furniture Company is a U.S.-based furniture manufacturer that offshored all of its actual manufacturing opera- tions to China about a decade ago. It set up a distribution center in Hong Kong from which the company ships its items to the United States on container ships. The company learned early on that it could not rely on local Chinese freight forwarders to arrange for sufficient containers for the company's shipments, so it contracted to purchase containers from a Taiwanese manufacturer and then sell them to shipping companies at the U.S. ports the containers are shipped to. Southwood needs 715 containers each year. It costs $1200 to hold a container at its distribution center, and it costs $6000 to receive an order for the containers. Determine the optimal order size, min- imum total annual inventory cost, number of annual orders, and time between orders.arrow_forward1. Explain *four* the "reduction of inventory" when the company reduces the number of warehouses. 2. Explain the impact on customer service level when only *four* warehouses are now serving the entire ASEAN region? 3. Explain where the *four* distribution centre should be located and why.arrow_forwardThe Goodparts Company produces a component that is subsequently used in the aerospace industry. The component consists of three parts (A, B, and C) that are purchased from outside and cost 35, 30, and 10 cents per piece, respectively. Parts A and B are assembled first on assembly line 1, which produces 185 components per hour. Part C undergoes a drilling operation before being finally assembled with the output from assembly line 1. There are, in total, six drilling machines, but at present only three of them are operational. Each drilling machine drills part C at a rate of 80 parts per hour. In the final assembly, the output from assembly line 1 is assembled with the drilled part C. The final assembly line produces at a rate of 205 components per hour. At present, components are produced eight hours a day and five days a week. Management believes that if the need arises, it can add a second shift of eight hours for the assembly lines. The cost of assembly labor is 30 cents per part for…arrow_forward
- Mpho is an avid seamstress and want to sew and sell high quality, reusable, designer face masks during the current Covid-19 pandemic. She will design and sew the masks herself and use her automatic embroidery machine to put her logo on each mask sold. With the help of her son, deliveries will be made all over Gauteng within 3 days of placing the order. Every mask will have a unique threelayer design with adjustable straps to ensure comfort and fit. Mpho’s only expense is the material needed to sew the masks and delivery costs. At this stage, Mpho’s target market is limited to Gauteng. Draw a diagram to illustrate the transformation process of Mpho’s new business. Be sure to include all relevant elements, headings and arrows to indicate the flow of products/ servicesarrow_forwardPranuec Company mai Tactures, assembles, and rebunds material handing equipment used Tn war ses and uistr iters. One product, called a Liftmaster, is assembled from four components: a frame, a motor, two supports, and a metal strap. Frandec's production schedule calls for 6000 Liftmasters to be made next month. Frandec purchases the motors from an outside supplier, but the frames, supports, and straps may be either manufactured by the company or purchased from an outside supplier. Manufacturing and purchase costs per unit are shown. Component Manufacturing Cost Purchase Cost Frame $39.00 $52.00 Support $12.50 $16.00 Strap $7.50 $8.50 Three departments are involved in the production of these components. The time (in minutes per unit) required to process each component in each department and the available capacity (in hours) for the three departments are as follows: Department Component Cutting Milling Shaping Frame 3.6 2.3 3.2 Support 1.4 1.8 2.7 Strap 0.9 1.8 Capacity (hours) 370 430…arrow_forwardJosie’s Sports Accessories has 12 operators who work 9 hours a day (no breaks), 7 days a week. They manufacture headbands with a standard minute value of 1.35 minutes. The workers produce 4,450 headband a day. How long will it take them to complete an order for 5,000 headbands?arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Practical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,
Practical Management Science
Operations Management
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:Cengage,