Chapter 9, Problem 9.9P
To determine
Find the maximum permissible depth (H) of the cut before the occurrence of heaving.
Expert Solution & Answer
Trending nowThis is a popular solution!
Students have asked these similar questions
Q14. A contractor is excavating the below trench. The contractor is supposed to dig the
trench 5ft deep and 3ft wide. The soil was tested to have an approximately swell factor of
112% and a shrinkage factor of 14%. The contractor is placing a 10" water pipe in the trench
and then backfilling with the soil that was removed. The dimensions are on center line.
Does the contractor have enough soil to backfill the trench, or will he /she have to need
more? If more soil are needed, how much does the contractor need to bring in. Answer in
LCY.
40ft
3ft
16ft
40ft
20ft
24ft
60ft
Please explain the answer.
A circular duct measures 51⁄2 inches in radius and is 30 inches long. It has a5⁄8-inch lap seam and a 7⁄8-inch overlap.
Chapter 9 Solutions
Principles of Geotechnical Engineering (MindTap Course List)
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.Similar questions
- 10marrow_forwardAnswer the number shown below for the least horizontal deformation and settlement and for the most settlement. The braced excavation type of (3) below is chosen for the construction of subway station and ground settlement is expected to be more than allowable due to the drawdown of ground water. What do you think you should consider to reduce the settlement? 1) Slurry wall 2) CIP continuous wall 3) Soldier pile and woodlagging wall 4) Soldier pile and concrete wallarrow_forwardA stone A is thrown vertically upward at 10 m/sec. Another stone B is thrown vertically upward at 12 m/sec. after 1 second at an initial point of B is 2 m. higher the initial point of A. At what height that two stones have the same elevation?arrow_forward
- What are Mode of deflection and lateral pressure distribution for sheeting supporting a vertical cut?arrow_forwardO DrahmedsoilMechanicsnoteschapter5.pdf s/DrahmedsoilMechanicsnoteschapter5.pdf A V - 14 A 10-m-thick layer of stiff saturated clay is underlain by a layer of sand. The sand is under artesian pressure. A 5.75-m-deep cut is made in the clay. What would be the maximum permissible depth of cut before heaving would occur. Determine the factor of safety against heaving at point A. Ans.: H =6.88m, FOS = 1.36 P = 1925 kg/m 5.75 m 10 m Saturated clay 6 m Sand Par - 1840 kg/m 2.5 m Soil Mechanics Assistant Prof. Dr. Ahmed Al-Obaidi Civil Eng Dept - College of Eng. (173) 5.15 Refer to Problem 5.14. Water may be introduced into the cut to improvearrow_forwardDefine Terzaghi-Peck Charts for Backfill Pressures.arrow_forward
- A 20-ft-deep cut for a basement excavation is specified to be sloped at 1:2 (one horizontal to two vertical). The upper 40 ft of soil at the site consists of a homogeneous clay with a density of 90 pcf and an unconfined compressive strength averaging 2400 psf. The water table is at great depth. Can the cut be made? If so, what is the factor of safety for the slope? Is the slope safe enough for normal work to progress in the excavation without danger?arrow_forwardDescribe the load deformation response of deepfoundations ?arrow_forwardb2: Prepare measurement sheet for the following items of works using drawing of boundary wall given in Figure 1 and Cross section in Figure 2. Use Individual wall method for calculation of quantities. i. Earthwork in excavation РСС (1:4:8) Brick Work in foundation ii. iii. iv. Damp Proof Course (DPC 1:2:4) DPC (1:2:4) 142" 1-14 2-6" Figure 1 Figure 2 30arrow_forward
- Determine the backfill volume if the backfill is post-compacted from excavated soil.arrow_forwardA septic tank is to be constructed to serve for a family of 8 persons. The size of a septic tankis 2300 mm x 1500 mm x 1500mm. Determine the following;a. volume excavated. b. for concreting, compute the cement, sand and gravel (using class A)i. top and bottom slab,ii. footing 6pcs- 0.60mx0.60m x 20cm andiii. column 6pcs- 20cmx20cmarrow_forwardDesign a 275 ft long x 4.0 ft wide x 9.0 ft deep utility trench as a sloped excavation with no bracing following OSHA guidelines. The unconfined compressive strength of the soil is 3.2 ksf. There is not going to be vibrating equipment in the vicinity of the excavation. What OSHA soil type is this. Justify your answer. Is benching allowed for this soil type? Explain.arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Principles of Geotechnical Engineering (MindTap C...Civil EngineeringISBN:9781305970939Author:Braja M. Das, Khaled SobhanPublisher:Cengage Learning
Principles of Geotechnical Engineering (MindTap C...
Civil Engineering
ISBN:9781305970939
Author:Braja M. Das, Khaled Sobhan
Publisher:Cengage Learning