Question
Chapter 9, Problem 9.4P
To determine
The factors that would lead to the disqualification from bidding.
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
QUESTION 1
Once the contractor has received the notice to proceed, he mustdo the following:
OA Move the equipment
OB. Move the showers
OC. No answers are validi
OD Move materials and people
OE Move the equipment, materials, and people
QUESTION 2
During construction, one way to identify how long each acitvity will take is
OA After award, but before owner signs the Agreement
OB Interview other contractors who have done similar work
OC Create a schedule
OD. No answers are valid
OE In the pre-construction phase
OF Ask the owner how long they want the activity to last
QUESTION 3
One way a project schedule is used is to evaluate impact of changes in the work.
O True
False
QUESTION 4
A list of proposed subcontractor activities should be prepared during the following:
0 A. Budget preparation
OB Pre-construction phase
OC. Negotiation of contract
OD. Bid of the project
OE. No answers are validi
What are the inspections carried out on the tirfor machine?
I need a quick solution within 15 minutes With my best wishesTon
Chapter 9 Solutions
Solid Waste Engineering: A Global Perspective, Si Edition
Knowledge Booster
Similar questions
- Are boat push nets allowed to operate in municipal waters? Discuss. Note: no plagiarism pleasearrow_forwardWhat information is not included in the front end specifications. Defective Work Contract Time Limits The ASTM Standard for the Modulus of Elasticity for the specified water main pipe Non of the above O Liquidated Damages Identify the term when a Contractor is penalized a specified monetary amount for everyday, that the Contract time period has been exceeded. Claim Liquidated Damages OBid Document O Unsafe Condition Summonsarrow_forwardTry to give geniuene answer please 779. How do combined operations influence the planning of site remediation and environmental cleanup activities?arrow_forward
- [5 points] The typical size of a fire station is 12,400 SF, with the construction cost at $350 per SF. If you are constructing a large fire station with a size of 49,600 SF in Evergreen, Alabama, what will be the total cost? Cost Multiplier .50 .60 .70 80 Size Factor .90 1.0 20 3.0 3- 1.2 1.15 1.1 1.05- 1.0 Cost Modifier Curve .95 Area Conversion Scale .90 .85 80 .50 .60 .70 80 90 1.0 2.0 3.0 - 12 1.15 1.1 - 1.05 1.0 2828 .85 .80 95 90 ent. Do Not Sha Location Factors - Commercial Costs shown in RSMeans cost data publications are based on national averages for materials and installation. To adjust these costs to a specific location, simply multiply the base cost by the factor and divide CITY MAT. INST. TOTAL STATE/ZIP ALABAMA 350-352 Birmingham 100.6 354 Tuscaloosa 99.3 355 Jasper 100.6 356 Decatur 99.3 357-358 Huntsville 99.3 359 Gadsden 100.2 360-361 Montgomery 99.8 362 Anniston 99.2 363 Dothan 97.8 364 Evergreen 97.3 365-366 Mobile 99.4 367 Selma 97.5 368 Phenix City 98.0 369 Butler…arrow_forwardPlease provide clean and correct solution for upvotearrow_forwardTwo one-man barber shops sit side by side in DunkirkSquare. Each can hold a maximum of 4 people, and anypotential customer who finds a shop full will not wait for ahaircut. Barber 1 charges $11 per haircut and takes anaverage of 12 minutes to complete a haircut. Barber 2charges $5 per haircut and takes an average of 6 minutes tocomplete a haircut. An average of 10 potential customersper hour arrive at each barber shop. Of course, a potentialcustomer becomes an actual customer only if he finds thatthe shop is not full. Assuming that interarrival times andhaircut times are exponential, which barber will earn moremoney?arrow_forward
- This is all the information that I have to answer this question The task involves building a 16 – foot diameter sewer at a bottom depth of 50 feet in loose sand with a water table at a depth of 8 feet. The Sewer is 12 miles in length The alignment is along city streets. The project needs to be completed in 800 days. Determine the amount and types of equipment you feel should be used on this project and an approximate budget at general cost.arrow_forwardAn air-conditioning contractor is installing a heat pump system in a privatehome. He has agreed to do the job for the cost of parts and labor plus acontractor’s fee of 9% of the total. The heat pump costs $1,495, the electricalsupplies $53, the ducting $81, and the other supplies $39. Three men work16 hours each to install the system. They are paid $14 per hour. Sales tax is6% of the subtotal of the cost for parts, labor, and contractor’s fee. c. How much is the sales tax?arrow_forwardAn air-conditioning contractor is installing a heat pump system in a privatehome. He has agreed to do the job for the cost of parts and labor plus acontractor’s fee of 9% of the total. The heat pump costs $1,495, the electricalsupplies $53, the ducting $81, and the other supplies $39. Three men work16 hours each to install the system. They are paid $14 per hour. Sales tax is6% of the subtotal of the cost for parts, labor, and contractor’s fee. b. What is the contractor’s fee?arrow_forward
- QUESTION 25 If, late in the project an Owner asks for a change to add 20 lights to a project. What will be the dollar value of the change order the contractor should submit based on the following information? i. Installed cost of each light fixture - $ 400 ii. Time to install each light fixture - 0.8 hr iii. Established project indirect costs - $1000 per day iv. A working day is 8 hrs O a.5 8,000 Ob.5 1,400 Oc59.000 O d.5 10.000arrow_forward1arrow_forwardAs a consulting engineer you were asked to monitor a water supply project financed by an NGO and handled by local water users committee at Natore district. The project must be completed by the end of December 2020; otherwise the donor would stop the payment. When you visited the site at the middle of May 2020, you found that the project was not completed. The users committee requested to submit the completion report so that they could finish the work after some time and will be beneficial to 100 household of the project. Answer the following questions. Water is basic need for the people. As an engineer, what is your role to continue the project and to finish it in time?arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Solid Waste EngineeringCivil EngineeringISBN:9781305635203Author:Worrell, William A.Publisher:Cengage Learning,Fundamentals Of Construction EstimatingCivil EngineeringISBN:9781337399395Author:Pratt, David J.Publisher:Cengage,Construction Materials, Methods and Techniques (M...Civil EngineeringISBN:9781305086272Author:William P. Spence, Eva KultermannPublisher:Cengage Learning
Solid Waste Engineering
Civil Engineering
ISBN:9781305635203
Author:Worrell, William A.
Publisher:Cengage Learning,
Fundamentals Of Construction Estimating
Civil Engineering
ISBN:9781337399395
Author:Pratt, David J.
Publisher:Cengage,
Construction Materials, Methods and Techniques (M...
Civil Engineering
ISBN:9781305086272
Author:William P. Spence, Eva Kultermann
Publisher:Cengage Learning