Materials for Civil and Construction Engineers (4th Edition)
4th Edition
ISBN: 9780134320533
Author: Michael S. Mamlouk, John P. Zaniewski
Publisher: PEARSON
expand_more
expand_more
format_list_bulleted
Concept explainers
Question
Chapter 9, Problem 9.13QP
To determine
The proper PG grade for both 50% and 98% reliabilities.
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
Show all steps in detail
What standard PG asphalt binder grade should be selected under the following conditions:a. The seven-day maximum pavement temperature has a mean of 62°C and a minimum pavement temperature of -15°C. (table9.2)
b. According to part a, what is your recommendation for 20 million ESALs and 50 km/h speed? (table ESALs)
c. For 50 million ESALs and 80 km/h speed. (table ESALs)
please answer asap. thank you so much..
Chapter 9 Solutions
Materials for Civil and Construction Engineers (4th Edition)
Ch. 9 - Prob. 9.1QPCh. 9 - Prob. 9.2QPCh. 9 - Prob. 9.3QPCh. 9 - Prob. 9.4QPCh. 9 - Prob. 9.5QPCh. 9 - Prob. 9.6QPCh. 9 - Prob. 9.7QPCh. 9 - What are the engineering applications of each of...Ch. 9 - Prob. 9.9QPCh. 9 - Prob. 9.10QP
Ch. 9 - Prob. 9.11QPCh. 9 - Prob. 9.12QPCh. 9 - Prob. 9.13QPCh. 9 - Prob. 9.14QPCh. 9 - Prob. 9.15QPCh. 9 - Prob. 9.16QPCh. 9 - Prob. 9.17QPCh. 9 - Prob. 9.18QPCh. 9 - What are the objectives of the asphalt concrete...Ch. 9 - Prob. 9.20QPCh. 9 - Prob. 9.21QPCh. 9 - Prob. 9.22QPCh. 9 - Prob. 9.23QPCh. 9 - Prob. 9.24QPCh. 9 - Prob. 9.25QPCh. 9 - An asphalt concrete mixture includes 94% aggregate...Ch. 9 - Prob. 9.27QPCh. 9 - Prob. 9.28QPCh. 9 - Prob. 9.29QPCh. 9 - Prob. 9.30QPCh. 9 - Based on the data shown in Table P9.31, select the...Ch. 9 - Based on the data in Table P9.32, determine the...Ch. 9 - Given the data in Table P9.33, select the blend...Ch. 9 - The Marshall method of mix design has been widely...Ch. 9 - Prob. 9.35QPCh. 9 - Prob. 9.36QPCh. 9 - Prob. 9.37QPCh. 9 - Prob. 9.38QPCh. 9 - Prob. 9.39QPCh. 9 - Prob. 9.40QPCh. 9 - Prob. 9.41QPCh. 9 - Prob. 9.42QPCh. 9 - Prob. 9.43QPCh. 9 - What is the purpose of adding fly ash to asphalt...Ch. 9 - Prob. 9.45QPCh. 9 - Prob. 9.47QPCh. 9 - Prob. 9.48QP
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.Similar questions
- Comparing Rigid and Flexible Airport Pavement .arrow_forwardAs a materials engineer working for a highway department, what standard PGasphalt binder grade would you specify for each of the conditions shown inTable P9.14 (show all calculations and fill in the table)?arrow_forwardA 7-day average high temperature of the pavement at a ¾” depth is expected to be 138 degrees F (std. dev. 3.5 deg. F), and the average low temperature in the pavement is expected to reach 10 degrees F (std. dev. 2.5 deg. F). The pavement will be used to repave the intersection of a busy local road. Address the following: a) Determine the performance grade of the asphalt that should be used for this pavement with 98% reliability. b) Discuss the general considerations for ductility of the binder for the conditions stated. c) If a penetration test yields a penetration of 8.5 mm into the asphalt, list its penetration grade, viscosity grade, and expected flashpoint. d) Discuss the suitability of the addition of lime to the pavement mix.arrow_forward
- As a materials engineer working for a highway department, what standard PG asphalt binder grade would you specify for each of the conditions show in the table. Seven-Day Мaximum Minimum Pavement Recommended PG Grade Pavement Temperature, °C Temperature, "C Case 50% 98% Mean, °C Std. Dev., "C Mean, "C Std. Dev., °C Reliability Reliability 39 1 -32 3.5 54 1.5 -17 2 69 2.5 1.arrow_forwardan interstate highway pavement composed of a hma surface course, a cement treated base course, and a sand–gravel subbase is to be designed for an esal of 1.2*10^6.the quality of drainage is considered fair because water can be removed from the subbase within a week. however, there is a large amount of precipitation, so more than 25% of the time the pavement will be exposed to moisture levels approaching saturation. the material properties are as follows: effective roadbed soil resilient modulus = 5,500 psi, resilient modulus of subbase = 15,000 psi, unconfined compressive strength of cement-treated base at 7 days = 500 psi, and resilient modulus of hma = 4.3*10^5 psi. assuming a minimum thickness for hma, determine the thicknesses of the surface, base,and subbase courses required. Assuming a minimum thickness for HMA, determine the thicknesses of the surface, base,and subbase courses required.arrow_forwardAn agency uses the following formula to determine pavement condition rating, PCR = 99.3 − 5.51 (5.0-ROUGH) − 1.59 LNALL − 0.221 AVGOUT − 0.0306 LONG − 0.531 TRAN, where we have the following. ROUGH = roughness measured by present serviceability rating (PSR), scale of 0 to 5 LNALL = natural logarithm of alligator cracking, ft per mile AVGOUT = outer wheel path rutting (all locations averaged), 0.01 inch LONG = longitudinal cracking, ft per mile TRAN = transverse cracking, number of cracks per mile And, present serviceability rating is determined as the following. PSR = 5e−0.0051118 · IRI − 0.0016027 A pavement section has the following distress data. IRI = 108 in./mi Alligator cracking = 110 ft/mi Average rutting = 0.20 in. Longitudinal cracks = 130 ft/mi Transverse cracks = 12/mi Determine the current PCR for this section. PCR = Now, assume a new roughness measurement is expected soon. When PCR falls below 60, the section will be scheduled for rehabilitation. Determine the new IRI…arrow_forward
- As a materials engineer working for a highway department, what standard PG asphalt binder grade would you specify for each of the conditions show in the table.arrow_forward4- Describe the characteristics and functions of the top layer in a pavement system.arrow_forwardQ, Discuss the following terms briefly: a, Emulsion breaking and Cutback curing, b, Water bound and aggregate base, c, Flexible pavement and Rigid pavements,arrow_forward
- please help with transportation problem. please make sure it is correct. Will thumbs up if correct.arrow_forwardAn agency uses the following formula to determine pavement condition rating, PCR = 99.3 5.51 (5.0-ROUGH) 1.59 LNALL 0.221 AVGOUT 0.0306 LONG where we have the following. ROUGH = roughness measured by present serviceability rating (PSR), scale of 0 to 5 LNALL = natural logarithm of alligator cracking, ft per mile AVGOUT = outer wheel path rutting (all locations averaged), 0.01 inch LONG = longitudinal cracking, ft per mile TRAN = transverse cracking, number of cracks per mile And, present serviceability rating is determined as the following. PSR = 5e-0.0051118 IRI-0.0016027 A pavement section has the following distress data. IRI = 106 in./mi Alligator cracking 110 ft/mi Average rutting = 0.20 in. Longitudinal cracks = 130 ft/mi Transverse cracks = 12/mi Determine the current PCR for this section. PCR = 0.531 TRAN, Now, assume a new roughness measurement is expected soon. When PCR falls below 60, the section will be scheduled for rehabilitation. Determine the new IRI value (in in./mi)…arrow_forwardA pavement consists of 5 inches of asphalt underlain by a crushed stone based course. There is no sub base. The asphalt has an elastic modulus of 350,000 psi at room temperature and the base course has a CBR of 70. Determine the thickness of the crushed stone base needed to reach an SN of 2.85. Assume the base course is saturated 5% of the time and drains within a day.arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Traffic and Highway EngineeringCivil EngineeringISBN:9781305156241Author:Garber, Nicholas J.Publisher:Cengage Learning
Traffic and Highway Engineering
Civil Engineering
ISBN:9781305156241
Author:Garber, Nicholas J.
Publisher:Cengage Learning