Question
Chapter 9, Problem 2P
a)
Summary Introduction
To determine: The cost of the current layout.
b)
Summary Introduction
To determine: The cost of the layout.
c)
Summary Introduction
To determine: The cost of the layout.
d)
Summary Introduction
To determine: The best layout from the cost perspective.
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
Manufacturing Company uses FIFO method of accumulating costs in a two-department process. Materials are introduced at the inception of the process except for a special material which is added in department 2 at 60% completion as to overhead. Inspection is done at the end of the process in both departments. Production data for Department 2 are given below:
In process, beginning, (80% labor, 70% overhead)2,000 Transferred in 14,900 In process, ending (40% labor, 20% overhead) 3,000 Normal spoilage 200 Abnormal spoilage (found at 30% completion as to laborand 15% as to overhead due to internal failure) 400 Cost data for the month:In process beginning:Transferred in 15,020 Special materials 1,900 Direct labor 4,388 Overhead 11,044 Current costs:Transferred in 137,080 Special materials 14,030 Direct labor 46,000 Overhead 113,564
The cost of units transferred to finished goods is?The cost of spoilage charged to revenue is?
MGT-314 (Operation management) MCQ:
1. Mamar daan halim is one of the best halim in Bangladesh. They have a food stand in Banasree. Mama the owner makes a bowl every morning. Brings that to the spot and sells it to his customers. What kind of facility layout is this?
a) Mass Processing
b) Batch Processing
c) Continuous processing
d) Job Shop
02. Dunder Mifflin is looking to sell its products on the international market, what quality mark will help it improve its image?
a) ISO 21000
b)ISO 9000
c) BSTI 1500
d)ISO 14000
Jays Tech Shop has the following repair orders it must complete in the next week (40 hours). The jobs are
as follows:
Number of Repairs to
Repair Type
Complete
Setup Time/Repair Type
(hours)
Processing
Time/Repair (hours)
Laptop Repair
15
2
1.2
Smartphone Repair
20
1
0.8
Tablet Repair
10
1.5
1.1
All repairs of the same type are processed together. Is 40 hours enough capacity? If not, what short-term
capacity solution would you recommend?
Chapter 9 Solutions
Operations Management
Ch. 9 - Prob. 1EDCh. 9 - Prob. 1DQCh. 9 - Prob. 2DQCh. 9 - Prob. 3DQCh. 9 - Prob. 4DQCh. 9 - Prob. 5DQCh. 9 - Prob. 6DQCh. 9 - Prob. 7DQCh. 9 - Prob. 8DQCh. 9 - What are the requirements for a focused work...
Ch. 9 - Prob. 10DQCh. 9 - Prob. 11DQCh. 9 - Prob. 12DQCh. 9 - Prob. 13DQCh. 9 - Prob. 14DQCh. 9 - Prob. 15DQCh. 9 - Prob. 16DQCh. 9 - Explain the concept of cross-docking.Ch. 9 - What is a heuristic? Name several that can be used...Ch. 9 - Prob. 1PCh. 9 - Prob. 2PCh. 9 - Three departmentsmilling (M), drilling (D), and...Ch. 9 - Roy Creasey Enterprises, a machine shop, is...Ch. 9 - Prob. 5PCh. 9 - Prob. 6PCh. 9 - Prob. 7PCh. 9 - Six processes are to be laid out in six areas...Ch. 9 - Stanford Rosenberg Computing wants to establish an...Ch. 9 - Illinois Furniture, Inc., produces all types of...Ch. 9 - Sue Helms Appliances wants to establish an...Ch. 9 - The Action Toy Company has decided to manufacture...Ch. 9 - The following table details the tasks required for...Ch. 9 - Tailwind, Inc., produces high-quality but...Ch. 9 - Prob. 18PCh. 9 - Because of the expected high demand for Mach 10,...Ch. 9 - Prob. 20PCh. 9 - Suppose production requirements in Solved Problem...Ch. 9 - The preinduction physical examination given by the...Ch. 9 - Samuel Smith's company wants to establish an...Ch. 9 - Prob. 8PCh. 9 - Prob. 9PCh. 9 - Prob. 25PCh. 9 - Prob. 26PCh. 9 - Prob. 27PCh. 9 - Prob. 1CSCh. 9 - Prob. 2CSCh. 9 - Prob. 3CSCh. 9 - Prob. 4CSCh. 9 - Prob. 1.1VCCh. 9 - Prob. 1.2VCCh. 9 - Prob. 1.3VCCh. 9 - Prob. 1.4VCCh. 9 - Prob. 1.5VCCh. 9 - Prob. 1.6VCCh. 9 - Prob. 2.1VCCh. 9 - Prob. 2.2VCCh. 9 - Prob. 2.3VC
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, operations-management and related others by exploring similar questions and additional content below.Similar questions
- sniparrow_forwardDraw a sequence diagram on this scenario. Consider an e commerce website, the customer will search for the items either by category, by price, by color or by size. the customer will add the selected items to the shopping cart. He/she can either continue shopping or can perform checkout. On checkout bill/invoice will be generated and the customer will enter personal information including email, phone and address; will choose cash on delivery option or card payment. If card payment selected, he/she will enter the card information. The bank object will validate the card, if validated the required amount will be deducted and the item will be dispatched to the provided address in both cases (COD/ valid card payment).arrow_forwardJ.C. Howard’s medical testing company in Kansas wishes to assign a set of jobs to a set of machines. The follow-ing table provides the production data of each machine when performing the specific job: MACHINEABCD1 7 9 8 102 10 9 7 63 11 5 9 64 9 11 5 8 a) Determine the assignment of jobs to machines that will maxi-mize total production. b) What is the total production of your assignments?arrow_forward
- A manager wants to assign tasks to workstations as efficiently as possible and achieve an hourly output of 331/3 units. Assume the shop works a 60-minute hour. Assign the tasks shown in the accompanying precedence diagram (times are in minutes) to workstations using the following rules: A. In order of most following tasks. Tiebreaker: greatest positional weight. Work Station Task I II III IV b. In order of greatest positional weight. Tiebreaker: most following tasks. Work Station Tasks I II III IV c. What is the efficiency? (Round your answer to 2 decimal places.) Efficiency _________%arrow_forwardUse excel to show formulas 1. A company is designing a product layout for a new product. They plan to use this production line 16 hours a day in order to meet forecasted demand of 1200 units per day. For output to equal forecasted demand, what should be the actual cycle time for this production?arrow_forwardGordon Miller's job shop has four work areas, A, B, C, and D. Distances in feet between centers of the work areas are: Workpieces moved per week between work areas are: A C ABCD A A It costs Gordon $1 to move 1 work piece 1 foot. The weekly total material handling cost of the layout= $ (enter your response as a whole number). B T B 900 C 8 7 C 800 400 D 6 11 D 500 400 700 Darrow_forward
- Canine Kennels Company (CKC) manufactures two different types of dog chew toys (A and B, sold in 1,000-count boxes) that are manufactured and assembled on three different workstations (W, X, and Y) using a small-batch process (see the figure below). Batch setup times are negligible. The flowchart denotes the path each product follows through the manufacturing process, and each product's price, demand per week, and processing times per unit are indicated as well. Purchased parts and raw materials consumed during production are represented by inverted triangles. CKC can make and sell up to the limit of its demand per week; no penalties are incurred for not being able to meet all the demand. Each workstation is staffed by a worker who is dedicated to work on that workstation alone and is paid $10 per hour. Total labor costs per week are fixed. Variable overhead costs are $3,500/week. The plant operates one 8-hour shift per day, or 40 hours/week. Product A $4 Raw materials Product B $7 Raw…arrow_forwardCanine Kennels Company (CKC) manufactures two different types of dog chew toys (A and B, sold in 1,000-count boxes) that are manufactured and assembled on three different workstations (W, X, and Y) using a small-batch process (see the figure below). Batch setup times are negligible. The flowchart denotes the path each product follows through the manufacturing process, and each product's price, demand per week, and processing times per unit are indicated as well. Purchased parts and raw materials consumed during production are represented by inverted triangles. CKC can make and sell up to the limit of its demand per week; no penalties are incurred for not being able to meet all the demand. Each workstation is staffed by a worker who is dedicated to working on that workstation alone and is paid $6 per hour. Total labor costs per week are fixed. Variable overhead costs are $3,500/week. The plant operates one 8-hour shift per day or 40 hours/week. Which of the three workstations, W, X, or…arrow_forwardCanine Kennels Company (CKC) manufactures two different types of dog chew toys (A and B, sold in 1,000-count boxes) that are manufactured and assembled on three different workstations (W, X, and Y) using a small-batch process (see the figure below). Batch setup times are negligible. The flowchart denotes the path each product follows through the manufacturing process, and each product's price, demand per week, and processing times per unit are indicated as well. Purchased parts and raw materials consumed during production are represented by inverted triangles. CKC can make and sell up to the limit of its demand per week; no penalties are incurred for not being able to meet all the demand. Each workstation is staffed by a worker who is dedicated to work on that workstation alone and is paid $6 per hour. Total labor costs per week are fixed. Variable overhead costs are $3,500/week. The plant operates one 8-hour shift per day, or 40 hours/week. Find the answers in the…arrow_forward
- Three departments- milling (M), drilling (D), andsawing (S)- are assigned to three work areas in Victor Berardis'smachine shop in Kent, Ohio. The number of workpieces movedper day and the distances between the centers of the work areas,in feet, follow. Pieces Moved between Work Areas Each Day lt costs $2 to move I workpiece I foot.What is the cost?arrow_forwardPeter’s Paper Clips uses a three-stage production process: cutting wire to prescribed lengths, inner bending, and outer bending. The cutting process can produce at a rate of 220 pieces per minute; inner bending, 230 pieces per minute; and outer bending, 180 pieces per minute. Determine the hourly capacity of each process stage and the number of machines needed to meet an output rate of 14,000 units per hour. Round your answers for the hourly capacity of each process stage to the nearest whole mumber. Round your answers up for the number of machines needed to a whole number. Cutting process: Hourly capacity: pieces/hour Number of machines needed: machine(s) Inner bending: Hourly capacity: pieces/hour Number of machines needed: machine(s) Outer bending: Hourly capacity: pieces/hour Number of machines needed: machine(s)arrow_forwardThere is a canteen set up serving food (Breakfast, Lunch, Snacks-tea, and Dinner) to 500 students in a B school. It has a huge well-furnished dining hall and has a serving zone where students queue to pick up their eatables. The Institute director, during his regular Gemba walks in the canteen, has seen a lot of inefficiency in the related operational processes and needs a major improvement. (a)Provide one relatable and relevant example of five of the eight wastes under Lean systems which are likely to be witnessed in the canteen. (b)Recommend lean tools & techniques/system solutions to be employed for curbing each of those five wastes with a line on justification. (c) Suggest three key enablers and measures track the progress on lean in the canteen.arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Practical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,
Practical Management Science
Operations Management
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:Cengage,