Mylab Operations Management With Pearson Etext -- Access Card -- For Operations Management: Sustainability And Supply Chain Management (13th Edition)
13th Edition
ISBN: 9780135225899
Author: Jay Heizer, Barry Render, Chuck Munson
Publisher: PEARSON
expand_more
expand_more
format_list_bulleted
Textbook Question
Chapter 9, Problem 19P
Because of the expected high demand for Mach 10, Creative Leisure has decided to increase manufacturing time available to produce the Mach 10 (see Problem 9.17).
- a. If demand remained the same but 300 minutes were available each day on the assembly line, how many workstations would be needed?
- b. What would be the efficiency of the new system, using the actual number of workstations from (a)?
- c. What would be the impact on the system if 400 minutes were available?
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
SITUATION: A company is about to begin
production of a new product. The manager of
the department that will produce one of the
components for the product wants to know
how often the machine used to produce the
item will be available for other work. The
machine will produce the item at a rate of
200 units a day. Eighty units will be used daily
in assembling the final product. Assembly will
take place five days a week, 50 weeks a year.
The manager estimates that it will take almost
a full day to get the machine ready for a
production run, at the cost of $300. Inventory
holding costs will be $10 a year.
QUESTION: Suppose the manager decides to
increase the run size of the new product. How
many additional units would be needed just
to accommodate the other job? How much
will that increase the total annual cost?
No written by hand solution and no image
Please help me solve this.
Chapter 9 Solutions
Mylab Operations Management With Pearson Etext -- Access Card -- For Operations Management: Sustainability And Supply Chain Management (13th Edition)
Ch. 9 - Prob. 1EDCh. 9 - Prob. 1DQCh. 9 - Prob. 2DQCh. 9 - Prob. 3DQCh. 9 - Prob. 4DQCh. 9 - Prob. 5DQCh. 9 - Prob. 6DQCh. 9 - Prob. 7DQCh. 9 - Prob. 8DQCh. 9 - What are the requirements for a focused work...
Ch. 9 - Prob. 10DQCh. 9 - Prob. 11DQCh. 9 - Prob. 12DQCh. 9 - Prob. 13DQCh. 9 - Prob. 14DQCh. 9 - Prob. 15DQCh. 9 - Prob. 16DQCh. 9 - Explain the concept of cross-docking.Ch. 9 - What is a heuristic? Name several that can be used...Ch. 9 - Prob. 1PCh. 9 - Prob. 2PCh. 9 - Three departmentsmilling (M), drilling (D), and...Ch. 9 - Roy Creasey Enterprises, a machine shop, is...Ch. 9 - Prob. 5PCh. 9 - Prob. 6PCh. 9 - Prob. 7PCh. 9 - Six processes are to be laid out in six areas...Ch. 9 - Stanford Rosenberg Computing wants to establish an...Ch. 9 - Illinois Furniture, Inc., produces all types of...Ch. 9 - Sue Helms Appliances wants to establish an...Ch. 9 - The Action Toy Company has decided to manufacture...Ch. 9 - The following table details the tasks required for...Ch. 9 - Tailwind, Inc., produces high-quality but...Ch. 9 - Prob. 18PCh. 9 - Because of the expected high demand for Mach 10,...Ch. 9 - Prob. 20PCh. 9 - Suppose production requirements in Solved Problem...Ch. 9 - The preinduction physical examination given by the...Ch. 9 - Samuel Smith's company wants to establish an...Ch. 9 - Prob. 8PCh. 9 - Prob. 9PCh. 9 - Prob. 25PCh. 9 - Prob. 26PCh. 9 - Prob. 27PCh. 9 - Prob. 1CSCh. 9 - Prob. 2CSCh. 9 - Prob. 3CSCh. 9 - Prob. 4CSCh. 9 - Prob. 1.1VCCh. 9 - Prob. 1.2VCCh. 9 - Prob. 1.3VCCh. 9 - Prob. 1.4VCCh. 9 - Prob. 1.5VCCh. 9 - Prob. 1.6VCCh. 9 - Prob. 2.1VCCh. 9 - Prob. 2.2VCCh. 9 - Prob. 2.3VC
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, operations-management and related others by exploring similar questions and additional content below.Similar questions
- California Gardens, Inc., prewashes, shreds, and distributes a variety of salad mixes in 2-pound bags. Doug Voss, Operations VP, is considering a new Hi-Speed shredder to replace the old machine, referred to in the shop as "Clunker." Hi-Speed will have a fixed cost of $87,000 per month and a variable cost of $1.20 per bag. Clunker has a fixed cost of only $31,000 per month, but a variable cost of $1.70. Selling price is $2.40 per bag. Part 2 a) What is the crossover point in units (point of indifference) for the processes? The crossover point is units. (Round your response to the nearest whole number.)arrow_forwardCalifornia Gardens, Inc., prewashes, shreds, and distributes a variety of salad mixes in 2-pound bags. Doug Voss, Operations VP, is considering a new Hi-Speed shredder to replace the old machine, referred to in the shop as "Clunker." Hi-Speed will have a fixed cost of $87,000 per month and a variable cost of $1.20 per bag. Clunker has a fixed cost of only $31,000 per month, but a variable cost of $1.70. Selling price is $2.40 per bag. Part 2 a) What is the crossover point in units (point of indifference) for the processes? The crossover point is 112000112000 units. (Round your response to the nearest whole number.) Part 3 b) What is the monthly profit or loss if the company changes to the Hi-Speed shredder and sells 90,000 bags per month? The monthly profit or loss if the company changes to the Hi-Speed shredder and sells 90,000 bags per month is $enter your response here. (Round your response to the nearest dollar and include a minus sign if necessary.)arrow_forwardCalifornia Gardens, Inc., prewashes, shreds, and distributes a variety of salad mixes in 2-pound bags. Doug Voss, Operations VP, is considering a new Hi-Speed shredder to replace the old machine, referred to in the shop as "Clunker." Hi-Speed will have a fixed cost of $87,000 per month and a variable cost of $1.20 per bag. Clunker has a fixed cost of only $31,000 per month, but a variable cost of $1.70. Selling price is $2.40 per bag. a) What is the crossover point in units (point of indifference) for the processes? The crossover point isunits. (Round your response to the nearest whole number.)arrow_forward
- Explain why process selection is essential in system design.arrow_forwardSuppose the times for the individual operations for the in-line skate assembly are as follows: Task Description Time (sec) 1 Assemble wheels, bearings, and axle hardware 11 2 Assemble brake housing and pad 8 3 Complete wheel assembly 20 4 Inspect wheel assembly 13 5 Assemble boot 18 6 Join boot and wheel subassemblies 7 7 Add line and final assembly 10 8 Perform final inspection 10 Consider the production line achieving an output rate of 180 per hour below. Using the proposed design, calculate the total time and idle time for each workstation. If your answer is zero, enter "0". Round your answers to the nearest whole number. Station Tasks Total Time, seconds Idle Time, seconds A 1 and 2 B 3 C 5 D 4 and 6 E 7 and 8 Total What is the assembly line efficiency? Round your answer to one decimal place. %arrow_forwardgiven information: which step is in bottleneck=30 min for tan leather 60/30=2 briefcases per hr are processed at the bottleneck workstation per hour throughput time of the overall process Throughput = 75 minutes PLEASE answer the following 3 questions: If the manufacturing facility operates 8 hours per day, 250 days a year, what is the annual capacity of this manufacturing process. Assume the company decides to hire additional workers in order to duplicate the bottleneck step identified in part a so that there are 3 of these workstations instead of 1. Redraw the diagram showing the flow of the revised process. Answer parts a through d again based on the new process created in part e?arrow_forward
- The Mach 10 is a one-person sailboat manufactured by Creative Leisure. The final assembly plant is in Cupertino, California. The assembly area is available for production of theMach 10 for 200 minutes per day. (The rest of the time it is busy making other products.) The daily demand is 60 boats. Given the information in the table on the next page,a) Draw the precedence diagram and assign tasks using five workstations .b) What is the efficiency of the assembly line, using your answer to (a)?c) What is the theoretical minimum number of workstations?d) What is the idle time per boat produced?arrow_forwardA small firm intends to increase the capacity of a bottleneck operation by adding a new machine.Two alternatives, A and B, have been identified, and the associated costs and revenues have beenestimated. Annual fixed costs would be $40,000 for A and $30,000 for B; variable costs per unitwould be $10 for A and $11 for B; and revenue per unit would be $15.c. If expected annual demand is 12,000 units, which alternative would yield the higher profit?arrow_forwardANSWER ONLY 9.19arrow_forward
- An assembly line with 17 tasks is to be balanced. The longest task is 2.2 minutes and the total time for all tasks is 19 minutes. The line will operate for 460 minutes per day. A) What is the minimum number of workstations needed if the output rate is to be 186 units per day? B)- What cycle time will provide an output rate of 142 units per day? C) What output will result if the cycle time is (I) 9 minutes and (II) 14 minutes?arrow_forwardA small firm intends to increase the capacityof a bottleneck operation by adding a new machine. Two alternatives, A and B, have been identified, and associated cost and revenues have been estimated. Annual fixed costs would be $54,000 for A and $27,000 for B variable costs per unit would be $9 for A and $11 for B, and revenue per unit would be $16. a. Determine each alternative's break-even point in units. b. At what volume of output would the two alternatives yeild the same profit (or loss)? c. If expected annual demand is $13,000 units, which alternative would yield the higher profit (or the lower loss)?arrow_forwardGreen Grass’s plant manager just received marketing’s latest forecasts of Big Broadcaster sales for the nextyear. She wants its production line to be designed to make 2,400 spreaders per week for at least the nextthree months. The plant will operate 40 hours per week.a. What should be the line’s cycle time?b. What is the smallest number of workstations that she could hope for in designing the line for thiscycle time?c. Suppose that she finds a solution that requires only five stations. What would be the line’s efficiency?arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Practical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,Operations ManagementOperations ManagementISBN:9781259667473Author:William J StevensonPublisher:McGraw-Hill EducationOperations and Supply Chain Management (Mcgraw-hi...Operations ManagementISBN:9781259666100Author:F. Robert Jacobs, Richard B ChasePublisher:McGraw-Hill Education
- Purchasing and Supply Chain ManagementOperations ManagementISBN:9781285869681Author:Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. PattersonPublisher:Cengage LearningProduction and Operations Analysis, Seventh Editi...Operations ManagementISBN:9781478623069Author:Steven Nahmias, Tava Lennon OlsenPublisher:Waveland Press, Inc.
Practical Management Science
Operations Management
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:Cengage,
Operations Management
Operations Management
ISBN:9781259667473
Author:William J Stevenson
Publisher:McGraw-Hill Education
Operations and Supply Chain Management (Mcgraw-hi...
Operations Management
ISBN:9781259666100
Author:F. Robert Jacobs, Richard B Chase
Publisher:McGraw-Hill Education
Purchasing and Supply Chain Management
Operations Management
ISBN:9781285869681
Author:Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. Patterson
Publisher:Cengage Learning
Production and Operations Analysis, Seventh Editi...
Operations Management
ISBN:9781478623069
Author:Steven Nahmias, Tava Lennon Olsen
Publisher:Waveland Press, Inc.
Process selection and facility layout; Author: Dr. Bharatendra Rai;https://www.youtube.com/watch?v=wjxS79880MM;License: Standard YouTube License, CC-BY