given information: which step is in bottleneck=30 min for tan leather 60/30=2 briefcases per hr are processed at the bottleneck workstation per hour throughput time of the overall process Throughput = 75 minutes PLEASE answer the following 3 questions:  If the manufacturing facility operates 8 hours per day, 250 days a year, what is the annual capacity of this manufacturing process.  Assume the company decides to hire additional workers in order to duplicate the bottleneck step identified in part a so that there are 3 of these workstations instead of 1. Redraw the diagram showing the flow of the revised process.  Answer parts a through d again based on the new process created in part e?

Practical Management Science
6th Edition
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:WINSTON, Wayne L.
Chapter2: Introduction To Spreadsheet Modeling
Section: Chapter Questions
Problem 20P: Julie James is opening a lemonade stand. She believes the fixed cost per week of running the stand...
icon
Related questions
icon
Concept explainers
Topic Video
Question
100%

given information:

which step is in bottleneck=30 min for tan leather

60/30=2 briefcases per hr are processed at the bottleneck workstation per hour

throughput time of the overall process Throughput = 75 minutes

PLEASE answer the following 3 questions:

  1.  If the manufacturing facility operates 8 hours per day, 250 days a year, what is the annual capacity of this manufacturing process.
  2.  Assume the company decides to hire additional workers in order to duplicate the bottleneck step identified in part a so that there are 3 of these workstations instead of 1. Redraw the diagram showing the flow of the revised process.
  3.  Answer parts a through d again based on the new process created in part e?
The image is a flowchart depicting the manufacturing process of a leather case. Below is a detailed explanation of each step:

1. **Tan Leather** (30 minutes)
   - This process involves treating raw leather with tannins to produce durable and flexible leather suitable for making products.

2. **Dye Leather** (15 minutes)
   - Once tanned, the leather is dyed to achieve the desired color. This step adds visual appeal and can also protect the leather.

3. **Shape Case** (10 minutes)
   - In this stage, the leather is shaped into the form of the case. It involves cutting and forming the leather to meet design specifications.

4. **Mold Hinges and Fixtures** (5 minutes)
   - Separately, hinges and fixtures required for the case are molded. This parallel step ensures the necessary hardware is prepared.

5. **Install Hinges and Fixtures** (10 minutes)
   - The prepared hinges and fixtures are installed onto the shaped leather case. This step is crucial for the functionality of the case.

6. **Assemble Case** (10 minutes)
   - Final assembly of the case occurs, ensuring all parts are attached correctly and the case is ready for use. 

The arrows in the flowchart indicate the sequence of operations, while the parallel path between dyeing and molding processes shows that some steps occur concurrently to save time and increase efficiency.
Transcribed Image Text:The image is a flowchart depicting the manufacturing process of a leather case. Below is a detailed explanation of each step: 1. **Tan Leather** (30 minutes) - This process involves treating raw leather with tannins to produce durable and flexible leather suitable for making products. 2. **Dye Leather** (15 minutes) - Once tanned, the leather is dyed to achieve the desired color. This step adds visual appeal and can also protect the leather. 3. **Shape Case** (10 minutes) - In this stage, the leather is shaped into the form of the case. It involves cutting and forming the leather to meet design specifications. 4. **Mold Hinges and Fixtures** (5 minutes) - Separately, hinges and fixtures required for the case are molded. This parallel step ensures the necessary hardware is prepared. 5. **Install Hinges and Fixtures** (10 minutes) - The prepared hinges and fixtures are installed onto the shaped leather case. This step is crucial for the functionality of the case. 6. **Assemble Case** (10 minutes) - Final assembly of the case occurs, ensuring all parts are attached correctly and the case is ready for use. The arrows in the flowchart indicate the sequence of operations, while the parallel path between dyeing and molding processes shows that some steps occur concurrently to save time and increase efficiency.
Expert Solution
trending now

Trending now

This is a popular solution!

steps

Step by step

Solved in 4 steps with 1 images

Blurred answer
Knowledge Booster
Inventory management
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, operations-management and related others by exploring similar questions and additional content below.
Similar questions
Recommended textbooks for you
Practical Management Science
Practical Management Science
Operations Management
ISBN:
9781337406659
Author:
WINSTON, Wayne L.
Publisher:
Cengage,
Operations Management
Operations Management
Operations Management
ISBN:
9781259667473
Author:
William J Stevenson
Publisher:
McGraw-Hill Education
Operations and Supply Chain Management (Mcgraw-hi…
Operations and Supply Chain Management (Mcgraw-hi…
Operations Management
ISBN:
9781259666100
Author:
F. Robert Jacobs, Richard B Chase
Publisher:
McGraw-Hill Education
Business in Action
Business in Action
Operations Management
ISBN:
9780135198100
Author:
BOVEE
Publisher:
PEARSON CO
Purchasing and Supply Chain Management
Purchasing and Supply Chain Management
Operations Management
ISBN:
9781285869681
Author:
Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. Patterson
Publisher:
Cengage Learning
Production and Operations Analysis, Seventh Editi…
Production and Operations Analysis, Seventh Editi…
Operations Management
ISBN:
9781478623069
Author:
Steven Nahmias, Tava Lennon Olsen
Publisher:
Waveland Press, Inc.