a)
Interpretation: Determine the ordering policy is recommended by the silver-Meal heuristic.
Concept Introduction: Silver-Meal heuristic mainly focused on the manufacture planning in the production companies. It determines that within the minimum cost level, the quantities of the products will be produced by the company.
a)

Answer to Problem 49AP
The order policy according to silver meal heuristic method is
Explanation of Solution
Given information: The anticipated demand for an inventory is as follows:
Week | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 |
Demand | 22 | 34 | 32 | 12 | 8 | 44 | 54 | 16 | 76 | 30 |
The inventory costs 65 cents each and holding cost (h) is calculated on annual interest rate at 0.5% per week. The set up cost (K) is $200.
The order policy of the inventory under silver meal method can be calculated as follows:
According to silver meal method the average cost per period C (T) is a function of the average holding and set up cost per period for T number of Periods. The production in period 1 is equal to the demand in that period 1 to incur the order cost K.
Hence
And
And general equation is
Once
Now, calculate the order policy using the above formula as follows:
Starting in period 1:
(Since h is calculated on 0.5% annual interest rate with each unit cost at 65cents)
Starting from period 1
Stop the process since
Starting in period 3:
Stop the process since
Starting in period 6:
Stop the process since
Starting in period 9:
b)
Interpretation: Determine the ordering policy is recommended by the part period balancing heuristic.
Concept Introduction: one of the lot-sizing technique is to implementing the lowest-cost with the interconnection between costs of order and carrying cost for the inventory is generally known as Part period balancing.it is more effective for the product whose demand is unstable.
b)

Answer to Problem 49AP
The order policy according to the part period balancing heuristic method will be
is
Explanation of Solution
Given information: The anticipated demand for an inventory is as follows:
Week | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 |
Demand | 22 | 34 | 32 | 12 | 8 | 44 | 54 | 16 | 76 | 30 |
The inventory costs 65 cents each and holding cost (h) is calculated on annual interest rate at 0.5% per week. The set up cost (K) is $200.
The order policy according to part period balancing method can be calculated as follows:
In this method the order horizon that equates holding and setup cost over that period has to be calculated as follows:
(Since h is calculated on 0.5% annual interest rate with each unit cost at 65cents)
Starting from period 1:
Period | Holding Cost |
2 | 110.5 |
3 | 318.5 |
Since the setup cost $200 is closer at period 4, stop and equate
Starting in period 3:
Period | Holding Cost |
2 | 25 |
3 | 65 |
4 | 520 |
Since the setup cost $200 is closer to 4 than 3, stop and equate
Starting in period 6:
Period | Holding Cost |
2 | 175.5 |
3 | 279.5 |
Since the setup cost $200 is closer to 3, stop and equate
Starting in period 8:
Period | Holding Cost |
2 | 247 |
Since the setup cost $200 is closer to 2, stop and equate
c)
Interpretation: Determine the ordering policy is recommended by the least unit cost heuristic.
Concept Introduction: Least unit cost heuristic technique is one of the time-varying demand pattern technique.one of the dynamic lot-sizing concept is that interrelated between the order cost and carrying cost of the inventory for the every lot size is defined as
Least Unit Cost (LUC).
c)

Answer to Problem 49AP
The order policy according to the least unit cost heuristic method will be
is
Explanation of Solution
Given information: The anticipated demand for an inventory is as follows:
Week | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 |
Demand | 22 | 34 | 32 | 12 | 8 | 44 | 54 | 16 | 76 | 30 |
The inventory costs 65 cents each and holding cost (h) is calculated on annual interest rate at 0.5% per week. The set up cost (K) is $200.
The order policy according to lease unit cost(LUC) method can be calculated as follows:
LUC divides the average cost per period C (T) by the total number of units demanded. Hence
And
And general equation is
Once
Starting from period 1
Stop the process since
Starting in period 3:
Stop the process since
Starting in period 5:
Stop the process since
Starting in period 8:
Stop the process since
d)
Interpretation: Determine the method resulted in the lowest-cost policy for the given problem.
Concept Introduction: Least unit cost method makes the present period of the demands and evaluates the period of the future. Adding the carrying cost for the setup and the period of the inventory cost, the least unit cost will be occur.
d)

Answer to Problem 49AP
The least expensive method is the least unit cost method with a total cost of
Explanation of Solution
Given information: The anticipated demand for an inventory is as follows:
Week | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 |
Demand | 22 | 34 | 32 | 12 | 8 | 44 | 54 | 16 | 76 | 30 |
The inventory costs 65 cents each and holding cost (h) is calculated on annual interest rate at 0.5% per week. The set up cost (K) is $200.
Comparison of the three methods can be calculated as follows:
Calculate the total cost of the inventory for the three months. The method which yields less cost is the lowest cost policy.
The total cost under silver meal method can be calculated as follows:
The method required is 4 set ups
The total set up cost is
The total holding cost is
The total cost
The total cost under silver-meal heuristic is
The total cost under least unit cost method can be calculated as follows:
The method required is 5 set ups
The total set up cost is
The total holding cost is
The total cost
The total cost under least unit cost method is
The total cost under part period balancing method can be calculated as follows:
The method required is 5 set ups
The total set up cost is
The total holding cost is
The total cost
The total cost under part period balancing method is
Want to see more full solutions like this?
Chapter 8 Solutions
EBK PRODUCTION AND OPERATIONS ANALYSIS
- Perform a External analysis using PESTEL and Porters five force analysis on the "ATB: Digital disruption in the parking meter industry" casearrow_forwardThere was a most recent poll for which 571 adults that flew in the past year had info collected. This info was their number 1 complaints about flying. A - small cramped seat - 45 complaints B - cost - 18 complaints C - fear or dislike - 81 complaints D - security - 123 complaints E - Poor service - 12 complaints F - Conntected flight issue - 8 complaints G - overcrowded - 41 complaints H - Late and wait - 81 complaints I - Food - 5 complaints J - Lost/missing luggage - 5 complaints K - Other - 51 complaints What percentage of those surveyed found nothing they didnt dislike?arrow_forwardCan you help me with this, and explain what a product by value analysis is? Thanks in advancearrow_forward
- Operations Management Questionarrow_forwardcan you explain and breakdown the "ATB: digital disruption in the parking meter industry" case in detail outlining the key issuesarrow_forwardAt Quick Car Wash, the wash process is advertised to take less than 6 minutes. Consequently, management has set a target average of 330 seconds for the wash process. Suppose the average range for a sample of 7 cars is 10 seconds. Use the accompanying table to establish control limits for sample means and ranges for the car wash process. Click the icon to view the table of factors for calculating three-sigma limits for the x-chart and R-chart. The UCLR equals seconds and the LCLR equals seconds. (Enter your responses rounded to two decimal places.)arrow_forward
- If Jeremy who is the VP for the operations, proceeds with their existing prototype (which is option a), the firm can then expect sales to be 120,000 units at $550 each. And with a probability of 0.52 and a 0.48 probability of 65,000 at $550. we However, he uses his value analysis team (option b), the firm expects sales of 75,000 units at $770, with a probability of 0.78 and a 0.22 probability of 65,000 units at $770. Value engineering, at a cost of $100,000, is only used in option b. Which option for this has the highest expected monetary value (EMV)? The EMV for option a is $? The EMV for option b is $? Which has the highest expected monetary value. A or B?arrow_forwardPart 1 of 2 Jim's Outfitters, Inc., makes custom western shirts. The shirts could be flawed in various ways, including flaws in the weave or color of the fabric, loose buttons or decorations, wrong dimensions, and uneven stitches. Jim randomly examined 10 shirts, with the following results shown to the right. Shirt Defects 1 7 2 1 4 13 3 10 2 8 5 9 10 8 7 a. Assuming that 10 observations are adequate for these purposes, determine the three-sigma control limits for defects per shirt. The UCLC equals and the LCL equals (Enter your responses rounded to two decimal places. If your answer for LCL is negative, enter this value as 0.)arrow_forwardManagement at Webster Chemical Company is concerned as to whether caulking tubes are being properly capped. If a significant proportion of the tubes are not being sealed, Webster is placing its customers in a messy situation. Tubes are packaged in large boxes of 144. Several boxes are inspected, and the following numbers of leaking tubes are found: Sample Tubes Sample Tubes Sample Tubes 1 7 8 7 15 7 2 7 9 8 16 9 3 6 10 7 17 3 4 4 11 1 18 7 5 8 12 8 19 7 6 7 2 9 13 14 1 20 6 7 Total 121 Calculate p-chart three-sigma control limits to assess whether the capping process is in statistical control. The UCLp equals and the LCLp equals (Enter your responses rounded to three decimal places. If your answer for LCLp is negative, enter this value as 0.)arrow_forward
- Aspen Plastics produces plastic bottles to customer order. The quality inspector randomly selects four bottles from the bottle machine and measures the outside diameter of the bottle neck, a critical quality dimension that determines whether the bottle cap will fit properly. The dimensions (in.) from the last six samples are Bottle Sample 1 2 3 4 1 0.624 0.586 0.602 0.591 2 0.613 0.599 0.578 0.618 3 0.606 0.585 0.587 0.623 4 0.581 0.623 0.571 0.610 5 0.609 0.610 0.623 0.617 6 0.605 0.573 0.570 0.602 Click the icon to view the table of factors for calculating three-sigma limits for the x-chart and R-chart. Suppose that the specification for the bottle neck diameter is 0.600 ± 0.050 in. and the population standard deviation is 0.014 in. a. What is the process capability index? The Cpk is (Enter your response rounded to two decimal places.)arrow_forwardHow would you handle the Apple 'batterygate' scandal as an operations manager? What quality measures would you take to fix the problem and prevent it from happening again? When would you implement these measures and communicate with the stakeholders?arrow_forwardPerosnal Thoughts about the articlearrow_forward
- Purchasing and Supply Chain ManagementOperations ManagementISBN:9781285869681Author:Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. PattersonPublisher:Cengage LearningPractical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,MarketingMarketingISBN:9780357033791Author:Pride, William MPublisher:South Western Educational Publishing