Chapter 7.S, Problem 17P
a)
Summary Introduction
To determine: The break-even point in units for proposal A.
Introduction:
Break-even point (BEP):
The break-even point is measured in units or in sales term to identify the point in a business which is required to cover the total investment costs. The total profit at break-even point is zero.
b)
Summary Introduction
To determine: The break-even point in units for proposal B.
Introduction:
Break-even point (BEP):
The break-even point is measured in units or in sales term to identify the point in a business which is required to cover the total investment costs. The total profit at break-even point is zero.
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
Sroufe Manufacturing intends to increase capacity by overcoming a bottleneck operation by adding new equipment. Two vendors have presented proposals. The fixed costs are $50,000 for proposal A and $70,000 for proposal B. The variable cost is $14.00 for A and $11.00 for B. The revenue generated by each unit is $20.00.
a) The break-even point in units for the proposal by Vendor A =units (round your response to the nearest whole number).
b) The break-even point in units for the proposal by Vendor B =units (round your response to the nearest whole number).
Stapleton Manufacturing intends to increase capacity through the addition of new equipment. Two vendors have presented proposals. The fixed cost for proposal A is
$55,000, and for proposal B, $33,000. The variable cost for A is $9, and for B, $14. The revenue generated by each unit is $18.
a) What is the crossover point for the two options?
The crossover point for the two options is
units. (Round your response to the nearest whole number.)
b) At an expected volume of 6,200 units, which alternative should be chosen?
The profit (loss) if proposal A is accepted and 6,200 units are produced is $
(Round your response to the nearest dollar and include a minus sign if necessary.)
The profit (loss) if proposal B is accepted and 6,200 units are produced is $ (Round your response to the nearest dollar and include a minus sign if necessary.)
should be chosen at an expected volume of 6,200 units.
A product at the Jennings Company enjoyed reasonable sales volumes, but its contributions to profits were disappointing. Last year, 17,500 units were produced and sold. The selling price is $22 per unit, the variable cost is $18 per unit, and the fixed cost is $80,000.a. What is the break-even quantity for this product? Use both graphic and algebraic approaches to get your answer.b. If sales were not expected to increase, by how much would Jennings have to reduce their variable cost to break even?c. Jennings believes that a $1 reduction in price will increase sales by 50 percent. Is this enough for Jennings to break even? If not, by how much would sales have to increase?d. Jennings is considering ways to either stimulate sales volume or decrease variable cost. Management believes that either sales can be increased by 30 percent or that variable cost can be reduced to 85 percent of its current level. Which alternative leads to higher contributions to profits, assuming that each is…
Chapter 7 Solutions
EP PRIN.OF OPERATIONS MGMT.-MYOMLAB
Ch. 7.S - Prob. 1DQCh. 7.S - Prob. 2DQCh. 7.S - Prob. 3DQCh. 7.S - Prob. 4DQCh. 7.S - Prob. 5DQCh. 7.S - Distinguish between bottleneck time and throughput...Ch. 7.S - Prob. 7DQCh. 7.S - Prob. 8DQCh. 7.S - Prob. 9DQCh. 7.S - Prob. 10DQ
Ch. 7.S - Prob. 11DQCh. 7.S - Prob. 12DQCh. 7.S - What are the techniques available to operations...Ch. 7.S - Amy Xias plant was designed to produce 7,000...Ch. 7.S - For the post month, the plant in Problem S7.1,...Ch. 7.S - Prob. 3PCh. 7.S - Prob. 4PCh. 7.S - Prob. 5PCh. 7.S - The effective capacity and efficiency for the next...Ch. 7.S - Southeastern Oklahoma State Universitys business...Ch. 7.S - Prob. 8PCh. 7.S - Prob. 9PCh. 7.S - Prob. 10PCh. 7.S - The three-station work cell illustrated in Figure...Ch. 7.S - The three-station work cell at Pullman Mfg., Inc....Ch. 7.S - The Pullman Mfg., Inc., three-station work cell...Ch. 7.S - Prob. 14PCh. 7.S - 10 minutes per unit. Part 2 is simultaneously...Ch. 7.S - Prob. 16PCh. 7.S - Prob. 17PCh. 7.S - Using the data in Problem S7.17: a) What is the...Ch. 7.S - Prob. 19PCh. 7.S - Prob. 20PCh. 7.S - Prob. 21PCh. 7.S - Prob. 22PCh. 7.S - Prob. 23PCh. 7.S - Prob. 24PCh. 7.S - Prob. 25PCh. 7.S - Prob. 26PCh. 7.S - Prob. 27PCh. 7.S - Prob. 32PCh. 7.S - Prob. 33PCh. 7.S - Prob. 34PCh. 7.S - Prob. 35PCh. 7.S - Prob. 36PCh. 7.S - Prob. 37PCh. 7.S - Prob. 38PCh. 7.S - Prob. 39PCh. 7.S - Prob. 1VCCh. 7.S - a capacity expansion plan and a new 11-story...Ch. 7.S - a capacity expansion plan and a new 11-story...Ch. 7 - Ethical Dilemma For the sake of efficiency and...Ch. 7 - Prob. 1DQCh. 7 - Prob. 2DQCh. 7 - Prob. 3DQCh. 7 - Prob. 4DQCh. 7 - Prob. 5DQCh. 7 - Prob. 6DQCh. 7 - Prob. 7DQCh. 7 - Prob. 8DQCh. 7 - Prob. 9DQCh. 7 - Prob. 10DQCh. 7 - Prob. 11DQCh. 7 - Prob. 12DQCh. 7 - Prob. 13DQCh. 7 - Prob. 14DQCh. 7 - Prob. 15DQCh. 7 - Prob. 16DQCh. 7 - Prob. 17DQCh. 7 - Prob. 18DQCh. 7 - Prob. 19DQCh. 7 - Prob. 1PCh. 7 - Usingthedatain Problem 7.1, determinethemost...Ch. 7 - Prob. 3PCh. 7 - Refer to Problem 7.1. If a contract for the second...Ch. 7 - Stan Fawcetts company is considering producing a...Ch. 7 - Prob. 6PCh. 7 - Prob. 7PCh. 7 - Prob. 8PCh. 7 - Metters Cabinets, Inc., needs to choose a...Ch. 7 - Prob. 10PCh. 7 - Nagle Electric. Inc., of Lincoln, Nebraska, must...Ch. 7 - Stapleton Manufacturing intends to increase...Ch. 7 - Prepare a flowchart for one of the following: a)...Ch. 7 - Prepare a process chart for one of the activities...Ch. 7 - Prob. 15PCh. 7 - Prob. 16PCh. 7 - Prob. 17PCh. 7 - Prob. 1CSCh. 7 - Prob. 2CSCh. 7 - Prob. 3CSCh. 7 - Process Strategy at Wheeled Coach Wheeled Coach,...Ch. 7 - Prob. 1.2VCCh. 7 - Prob. 1.3VCCh. 7 - Prob. 1.4VCCh. 7 - Alaska Airlines: 20-Minute Baggage...Ch. 7 - Prob. 2.2VCCh. 7 - Prob. 2.3VCCh. 7 - Prob. 2.4VCCh. 7 - Prob. 2.5VCCh. 7 - Prob. 3.1VCCh. 7 - Prob. 3.2VCCh. 7 - Prob. 3.3VCCh. 7 - Prob. 3.4VC
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, operations-management and related others by exploring similar questions and additional content below.Similar questions
- INSTRUCTIONS: We're looking to work with a new publisher that is interested in selling us two different placements. The publisher has told us that placement 1 has an approximate CTR of 0.3% and will get 2M impressions per month. Placement 2 has an approximate CTR of 0.4% and will get 3M impressions. The CPM for Placement 1 is $5, CPM for Placement 2 is 6$ The conversion rate of our landing page is 8% and the leads generated all are worth $50. Please use the worksheet outlined below to fill in the highlighted cells with the answers you find. 1. What is the total cost? 2. What is the total revenue and retutn on ad spend? 3. What is the total clickthrough rate (CTR)? 4. Which placement is more effective in terms of ROAS? Placement 1 Placement 2 Total Impressions 2,000,000 3,000,000 CTR 0.30% 0.40% CR 8.00% 8.00% Clicks Leads = Impressions * CTR = Clicks * CR Revenue = Leads RPL DEFINITIONS: Revenue: Money generated from leads submitted by visitors filling out forms. Impressions: The…arrow_forwardWalton, Inc. is unsure whether to sell its product assembled or unassembled. The unit cost of the unassembled product is $32, while the cost of assembling each unit is estimated at $34. Unassembled units can be sold for $110, while assembled units could be sold for $142 per unit. What decision should Walton make?arrow_forward1. Give examples of industries in which demand forecasting is dependent in the demand for other products. 2. What are the three specific ways in which a computer-aided design (CAD) benefits the design engineer? 3. Pick a product that you are familiar with and produce a Bill of Materials (BOM).arrow_forward
- 4 - Smithson Cutting is opening a new line of scissors for supermarket distribution. It estimates its fixedcost to be $500.00 and its variable cost to be $0.50 per unit. Selling price is expected to average $0.75per unit.a) What is Smithson’s break-even point in units?b) What is the break-even point in dollars?arrow_forward"I'm not sure we should lay out $265,000 for that automated welding machine," said Jim Alder, president of the Superior Equipment Company. "That's a lot of money, and it would cost us $78,000 for software and installation, and another $40,800 per year just to maintain the thing. In addition, the manufacturer admits it would cost $41,000 more at the end of three years to replace worn-out parts." "I admit it's a lot of money," said Franci Rogers, the controller. “But you know the turnover problem we’ve had with the welding crew. This machine would replace six welders at a cost savings of $108,000 per year. And we would save another $6,900 per year in reduced material waste. When you figure that the automated welder would last for six years, I'm sure the return would be greater than our 19% required rate of return." "I'm still not convinced," countered Mr. Alder. "We can only get $14,000 scrap value out of our old welding equipment if we sell it now, and in six years the new machine will…arrow_forwardBorges Machine Shop, Inc. has a 1-year contract for the production of 200,000 gear housings for a new off-road vehicle Owner Luis Borges hopes the contract will be extended and the volume increased next year Borges has developed costs for three alternatives. They are general-purpose equipment (GPE), flexible manufacturing system (FMS), and expensive, but efficient, dedicated machine (DM) The cost data follow Annual contracted units Annual fixed cost General Purpose Equipment (GPE) 200.000 $150.000 $15.00 Per unit variable cost The option GEE is best when the contracted volume is below units (enter your response as a whole number) Flexible Manufacturing System (FMS) 200,000 $250.000 $14.00 Dedicated Machine (DM) 200.000 $525,000 $13.00arrow_forward
- A manufacturer plans to introduce a new shirt based on the following information. The selling price is $57.00; variable cost per unit is $18.00; fixed costs are $7800.00; and capacity per period is 500 units. b) Draw a detailed break-even chart, making sure to label the variables on the y- and x-axes, as well as all other significant points in the chart c) Showing your calculations, calculate the break-even point (in units) if fixed costs are reduced to $7020arrow_forwardBorges Machine Shop, Inc., has a 1-year contract for the production of 250,000 gear housings for a new off-road vehicle. Owner Luis Borges hopes the contract will be extended and the volume increased next year. Borges has developed costs for three alternatives. They are general-purpose equipment (GPE), flexible manufacturing system (FMS), and expensive, but efficient, dedicated machine (DM). The cost data follow General-Purpose Equipment (GPE) 250,000 Annual contracted units Annual fixed cost $125,000 Per unit variable cost $18.00 The option GPE is best when the contracted volume is below Flexible Manufacturing System (FMS) 250,000 $250,000 $14.00 D Dedicated Machine (DM) 250,000 $480,000 $13.00 units (enter your response as a whole number)arrow_forwardThe owner of Old-Fashioned Berry Pies, S. Simon, is contemplating adding a new line of pies, which will require leasing new equipment for a monthly payment of $6,000. Variable costs would be $2 per pie, and pies would retail for $7 each. a. How many pies must be sold in order to break even? b. What would the profit (loss) be if 1,000 pies are made and sold in a month? How many pies must be sold to realize a profit of $4,000? С. d. If 2,000 can be sold, and a profit target is $5,000, what price should be charged per pie? 5-30arrow_forward
- McBurger, Inc., wants to redesign its kitchens to improve productivity and quality. Three designs, called designs K1, K2, and K3, are under consideration. No matter which design is used, daily production of sandwiches at a typical McBurger restaurant is for 600 sandwiches. A sandwich costs $1.30 to produce. Non-defective sandwiches sell, on the average, for $2.50 per sandwich. Defective sandwiches cannot be sold and are scrapped. The goal is to choose a design that maximizes the expected profit at a typical restaurant over a 300-day period. Designs K1, K2, and K3 cost $115,000, $140,000, and $170,000, respectively. Under design K1, there is a .80 chance that 90 out of each 100 sandwiches are non-defective and a .20 chance that 70 out of each 100 sandwiches are non-defective. Under design K2, there is a .85 chance that 90 out of each 100 sandwiches are non-defective and a .15 chance that 75 out of each 100 sandwiches are non-defective. Under design K3, there is a…arrow_forwardConcord, Inc. is unsure of whether to sell its product assembled or unassembled. The unit cost of the unassembled product is $12, while the cost of assembling each unit is estimated at $14. Unassembled units can be sold for $59, while assembled units could be sold for $65 per unit. What decision should Concord make? Process further; the company will save $8 per unit. Sell before assembly; the company will save $8 per unit. Sell before assembly; the company will save $4 per unit. Process further; the company will save $6 per unit.arrow_forwardBorges Machine Shop, Inc., has a 1-year contract for the production of 75,000 gear housings for a new off-road vehicle, Owner Luis Borges hopes the contract will be extended and the volume increased next year. Borges has developed costs for three alternatives. They are general-purpose equipment (GPE), flexible manufacturing system (FMS), and expensive, but efficient, dedicated machine (DM). The cost data follow Annual contracted units Annual fixed cost Per unit variable cost General-Purpose Equipment (GPE) 75,000 $100,000 $16.00 Flexible Manufacturing System (FMS) 75,000 $225,000 $14.00 Dedicated Machine (DM) 75,000 $450,000 $13.75 Based on the total cost, the process that is best suited for the current contracted volume is Suppose the contracted volume changes to 275,000 gear housings. Based on the total cost, the process that is best suited for the new volume is Suppose the contracted volume changes to 375,000 gear housings. Based on the total cost, the process that is best suited…arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Inventory Management | Concepts, Examples and Solved Problems; Author: Dr. Bharatendra Rai;https://www.youtube.com/watch?v=2n9NLZTIlz8;License: Standard YouTube License, CC-BY