10 minutes per unit. Part 2 is simultaneously processed at work-station C for 20 minutes per unit. Work stations B and C feed the parts to an assembler at workstation D. w here the two parts are assembled. The time at workstation D is 15 minutes.
a) What is the bottleneck of this process?
b) What is the hourly capacity of the process?
•• S7.15 A production process at Kenneth Day Manufacturing is shown in Figure S7.9. The drilling operation occurs separately from, and simultaneously with, sawing and sanding, which are independent and sequential operations. A product needs to go through only one of the three assembly operations (the operations are in parallel).
a) Which operation is the bottleneck?
b) What is the bottleneck time?
c) What is the throughput time of the overall system?
d) If the firm operates 8 hours per day. 20 days per month, what is the monthly capacity of the manufacturing process?
Want to see the full answer?
Check out a sample textbook solutionChapter 7 Solutions
Principles of Operations Management: Sustainability and Supply Chain Management (10th Edition)
- MGT-314 (Operation management) MCQ: 1. Mamar daan halim is one of the best halim in Bangladesh. They have a food stand in Banasree. Mama the owner makes a bowl every morning. Brings that to the spot and sells it to his customers. What kind of facility layout is this? a) Mass Processing b) Batch Processing c) Continuous processing d) Job Shop 02. Dunder Mifflin is looking to sell its products on the international market, what quality mark will help it improve its image? a) ISO 21000 b)ISO 9000 c) BSTI 1500 d)ISO 14000arrow_forward10 Collaboration and demand flow strategy are important components of SCM strategy. Select one: a. False b. Truearrow_forwardTo meet holiday demand, Alex's Pie Shop requires a production line that is capable of producing 50 pecan pies per week, while operating only 40 hours per week. There are only four steps required to produce a single pecan pie with respective processing times of 5 minutes, 5 minutes, 45 minutes, and 15 minutes. a. What should be the line's cycle time? b. What is the smallest number of workstations Alex could hope for in designing the line considering this cycle time? c. Suppose that Alex finds a solution that requires only four stations. What would be the efficiency of this line?arrow_forward
- Please help me solve this.arrow_forwardWhat are the techniques available to operations managers to deal with a bottleneck operation? Which of thesedoes not decrease throughput time?arrow_forwardWhat a re the techniques available to operations managers to deal with a bottleneck operation? Which of these does not decrease throughput time?arrow_forward
- Operation 1 2 3 4 Work Center A B C D SE 5 Hourly Unit 80 100 40 50 70 Output Rate 70 If work center C's capacity increased from 40 to 70, what is the new hourly capacity (not the CHANGE) per hour for product X?arrow_forwardFind the problem in the attachmentarrow_forwardSITUATION: A company is about to begin production of a new product. The manager of the department that will produce one of the components for the product wants to know how often the machine used to produce the item will be available for other work. The machine will produce the item at a rate of 200 units a day. Eighty units will be used daily in assembling the final product. Assembly will take place five days a week, 50 weeks a year. The manager estimates that it will take almost a full day to get the machine ready for a production run, at the cost of $300. Inventory holding costs will be $10 a year. QUESTION: Suppose the manager decides to increase the run size of the new product. How many additional units would be needed just to accommodate the other job? How much will that increase the total annual cost?arrow_forward
- Practical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,Operations ManagementOperations ManagementISBN:9781259667473Author:William J StevensonPublisher:McGraw-Hill EducationOperations and Supply Chain Management (Mcgraw-hi...Operations ManagementISBN:9781259666100Author:F. Robert Jacobs, Richard B ChasePublisher:McGraw-Hill Education
- Purchasing and Supply Chain ManagementOperations ManagementISBN:9781285869681Author:Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. PattersonPublisher:Cengage LearningProduction and Operations Analysis, Seventh Editi...Operations ManagementISBN:9781478623069Author:Steven Nahmias, Tava Lennon OlsenPublisher:Waveland Press, Inc.