Find the rate of seepage through the permeable layer.
Answer to Problem 7.1P
The rate of seepage through the permeable layer is
Explanation of Solution
Given information:
The hydraulic conductivity of the permeable soil layer k is
The height of the layer H is 5.4 m.
The angle value
Calculation:
Draw the free body diagram of the permeable layer as in Figure (1).
Refer Figure (1).
Determine the hydraulic gradient using the relation.
Here,
Substitute
Determine the rate of seepage through the permeable layer using the relation.
Here, A is the area of the permeable layer.
Substitute
Therefore, the rate of seepage through the permeable layer is
Want to see more full solutions like this?
Chapter 7 Solutions
PRINCIPLES OF GEOTECH.ENGINEERING >LL+M
- Q1: Consider the space truss represented schematically in Figure 1. It has 21 struts and a fixed support at "A". At joint "G", it is applied a force vector with a component of -10 N, along the x-axis direction, and a component of 40 N, along the y-axis direction, as shown in Figure 1. Using the method of joints, calculate the forces for the struts converging at joint "E", i.e. the forces for struts "EA", "EB", "EF", "EG", "ED" and "EH" and specify if the struts are in tension or in compression. (Your submission must include the Free Body Diagram (FBD) and the application of the equilibrium equations for the corresponding FBD). [50%] 3 m E N A На KO D 4m FL Figure 1 10 N B G 40 N 0 y 3 marrow_forwardAssignment 1 CH1 Due Date:15/12/2024 1-Eliminate x between these two equations to find the relationship between y and z y = lnx and z = log10 xarrow_forwardA contractor has approached you to determine the feasibility of their proposed methodology for bulk excavation of a basement. Due to limited access routes into the site the contractor is proposing to store large quantities of excavated material on site until the excavation equipment can be moved to allow access for muck away trucks. The contractor has pre-cast 'L' walls currently in use on another job that is due to finish in time for them to be used on the proposed project. The dimensions of the units are as shown in figure 1 and all measurements are in mm 2000 Side Elevation 400 200 1000 250 250 550 400 550 500 500 1500 Front Elevationarrow_forward
- Describe the procedures of establishing a Job Standard Mix for an asphalt surfacing?arrow_forwardDetermine wether the truss system is determinate or not and draw a red line on the zero-force members.arrow_forwardIdentify if the truss system is determinate or not and draw a red line on the zero-force members.arrow_forward
- compute the forces in each member of this truss system using the method of joints.arrow_forwardConsider the multi-span bridge model in the figure below. L₁ L2 L3 L4 L5 L6 H4 H₁ H3 H₂ Draw the most suitable representation of masses for the cases of (i) horizontal motion only, and (ii) horizontal and vertical motion.arrow_forwardCalculate for the support reactions at point A and Barrow_forward
- A flexible pavement was designed for the following daily traffic with a 12- year design life: 1300 single axles at 8,000 lb each, 900 tandem axles at 15,000 lb each, 20 single axles at 40,000 lb each, and 200 tandem axles at 40,000 lb each . The highway was designed with 4 inches of hot-mix asphalt (HMA) wearing surface, 4 inches of hot-mix asphalt base, and 8 inches of crushed stone subbase. The reliability was 70%, overall standard deviation was 0.5, APSI was 2.0 (with a TSI of 2.5), and all drainage coefficients were 1.0. Using the AASHTO flexible pavement design procedure and equation to determine the following: a) W18 (18 - kip equivalent single - axle load) value for the design years. b) What was the soil resilient module of the subgrade used in design?arrow_forwardThe allowable soil pressure is 4,000 psf. Which option is the smallest foundation which can safely support a 62 kip column reaction? (Smallest is defined by the smallest soil contact area.)arrow_forwardVehicles begin to arrive at a freeway off-ramp meter with an arrival rate of 2(t)=50+3.661 [with t in minutes and λ (1) in vehicles per minute] at 7:50 A.M., after 25 minutes, the arrival rate is decreased to 10 vehicles per minutes and stays at that level until all the queues are dissipated. The meter opens at 8:00 A.M. and serves vehicles at a rate of 60 per minute throughout the day. Assuming D/D/1 queuing. answer the following: a) Plot the queue diagram. b) When will the queue dissipate? c) What is the total vehicle delay on the freeway?arrow_forward
- Principles of Foundation Engineering (MindTap Cou...Civil EngineeringISBN:9781337705028Author:Braja M. Das, Nagaratnam SivakuganPublisher:Cengage LearningPrinciples of Geotechnical Engineering (MindTap C...Civil EngineeringISBN:9781305970939Author:Braja M. Das, Khaled SobhanPublisher:Cengage LearningFundamentals of Geotechnical Engineering (MindTap...Civil EngineeringISBN:9781305635180Author:Braja M. Das, Nagaratnam SivakuganPublisher:Cengage Learning