To determine: The best process for this contract.
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
Borges Machine Shop, Inc., has a 1-year contract for the production of 250,000 gear housings for a new off-road
vehicle. Owner Luis Borges hopes the contract will be extended and the volume increased next year. Borges has
developed costs for three alternatives. They are general-purpose equipment (GPE), flexible manufacturing
system (FMS), and expensive, but efficient, dedicated machine (DM). The cost data follow
General-Purpose
Equipment (GPE)
250,000
Annual contracted units
Annual fixed cost
$125,000
Per unit variable cost
$18.00
The option GPE is best when the contracted volume is below
Flexible Manufacturing
System (FMS)
250,000
$250,000
$14.00
D
Dedicated
Machine (DM)
250,000
$480,000
$13.00
units (enter your response as a whole number)
Borges Machine Shop, Inc., has a 1-year contract for the production of 75,000 gear housings for a new off-road vehicle, Owner Luis Borges hopes the contract will be extended and the volume increased
next year. Borges has developed costs for three alternatives. They are general-purpose equipment (GPE), flexible manufacturing system (FMS), and expensive, but efficient, dedicated machine (DM). The
cost data follow
Annual contracted units
Annual fixed cost
Per unit variable cost
General-Purpose
Equipment (GPE)
75,000
$100,000
$16.00
Flexible Manufacturing
System (FMS)
75,000
$225,000
$14.00
Dedicated
Machine (DM)
75,000
$450,000
$13.75
Based on the total cost, the process that is best suited for the current contracted volume is
Suppose the contracted volume changes to 275,000 gear housings. Based on the total cost, the process that is best suited for the new volume is
Suppose the contracted volume changes to 375,000 gear housings. Based on the total cost, the process that is best suited…
Borges Machine Shop, Inc. has a 1-year contract for the production of 200,000 gear housings for a new off-road vehicle Owner Luis Borges hopes the contract will be extended and the volume increased next year
Borges has developed costs for three alternatives. They are general-purpose equipment (GPE), flexible manufacturing system (FMS), and expensive, but efficient, dedicated machine (DM) The cost data follow
Annual contracted units
Annual fixed cost
General Purpose
Equipment (GPE)
200.000
$150.000
$15.00
Per unit variable cost
The option GEE is best when the contracted volume is below units (enter your response as a whole number)
Flexible Manufacturing
System (FMS)
200,000
$250.000
$14.00
Dedicated
Machine (DM)
200.000
$525,000
$13.00
Chapter 7 Solutions
Operations Management
Ch. 7.S - Prob. 1DQCh. 7.S - Prob. 2DQCh. 7.S - Prob. 3DQCh. 7.S - How is actual, or expected, output computed?Ch. 7.S - Explain why doubling the capacity of a bottleneck...Ch. 7.S - Distinguish between bottleneck time and throughput...Ch. 7.S - Prob. 7DQCh. 7.S - Prob. 8DQCh. 7.S - Prob. 9DQCh. 7.S - Prob. 10DQ
Ch. 7.S - Explain how net present value is an appropriate...Ch. 7.S - Prob. 12DQCh. 7.S - What are the techniques available to operations...Ch. 7.S - Amy Xias plant was designed to produce 7,000...Ch. 7.S - For the past month, the plant in Problem S7.1,...Ch. 7.S - If a plant has an effective capacity of 6,500 and...Ch. 7.S - Prob. 4PCh. 7.S - Material delays have routinely limited production...Ch. 7.S - Prob. 6PCh. 7.S - Southeastern Oklahoma State Universitys business...Ch. 7.S - Under ideal conditions, a service bay at a Fast...Ch. 7.S - A production line at V. J. Sugumarans machine shop...Ch. 7.S - A work cell at Chris Ellis Commercial Laundry has...Ch. 7.S - The three-station work cell Illustrated in Figure...Ch. 7.S - The three-station work cell at Pullman Mfg., Inc....Ch. 7.S - The Pullman Mfg., Inc., three-station work cell...Ch. 7.S - Klassen Toy Company, Inc., assembles two parts...Ch. 7.S - Prob. 15PCh. 7.S - Prob. 16PCh. 7.S - Markland Manufacturing intends to increase...Ch. 7.S - Using the data in Problem S7.17. a. What is the...Ch. 7.S - Given the data in Problem S7.17, at what volume...Ch. 7.S - Janelle Heinke, the owner of HaPeppas!, is...Ch. 7.S - Prob. 21PCh. 7.S - Prob. 22PCh. 7.S - Prob. 23PCh. 7.S - Prob. 24PCh. 7.S - Prob. 25PCh. 7.S - As a prospective owner of a club known as the Red...Ch. 7.S - Prob. 27PCh. 7.S - James Lawsons Bed and Breakfast, in a small...Ch. 7.S - Prob. 29PCh. 7.S - Prob. 30PCh. 7.S - Prob. 31PCh. 7.S - What is the present value of 5,600 when the...Ch. 7.S - Prob. 33PCh. 7.S - Prob. 34PCh. 7.S - Bolds Gym, a health club chain, is considering...Ch. 7.S - Prob. 1VCCh. 7.S - Prob. 2VCCh. 7.S - Prob. 3VCCh. 7 - What is process strategy?Ch. 7 - Prob. 2DQCh. 7 - Prob. 3DQCh. 7 - What is process redesign?Ch. 7 - Prob. 5DQCh. 7 - Name the tour quadrants of the service process...Ch. 7 - Prob. 7DQCh. 7 - Prob. 8DQCh. 7 - Identify manufacturing firms that compete on each...Ch. 7 - Identify the competitive advantage of each of the...Ch. 7 - Prob. 11DQCh. 7 - Identify the competitive advantage of each of the...Ch. 7 - Prob. 13DQCh. 7 - Prob. 14DQCh. 7 - Prob. 15DQCh. 7 - Explain what a flexible manufacturing system (FMS)...Ch. 7 - Prob. 17DQCh. 7 - Prepare a flowchart tor one of the following: a....Ch. 7 - Prob. 2PCh. 7 - Prepare a time-function map for one of the...Ch. 7 - Prepare a service blueprint for one of the...Ch. 7 - Prob. 5PCh. 7 - Prob. 6PCh. 7 - Prob. 7PCh. 7 - Prob. 8PCh. 7 - Prob. 9PCh. 7 - Ski Boards, Inc., wants to enter the market...Ch. 7 - Prob. 11PCh. 7 - Prob. 12PCh. 7 - Using Figure 7.6 in the discussion of value-stream...Ch. 7 - Metters Cabinets, Inc., needs to choose a...Ch. 7 - Rochester Manufacturings Process Decision...Ch. 7 - Prob. 2CSCh. 7 - Prepare the case for an optimistic sales manager...Ch. 7 - Prob. 1.1VCCh. 7 - Prob. 1.2VCCh. 7 - Prob. 1.3VCCh. 7 - Prob. 1.4VCCh. 7 - Prob. 2.1VCCh. 7 - Prob. 2.2VCCh. 7 - Process Strategy at Wheeled Coach Video Case Video...Ch. 7 - Prob. 2.4VC
Knowledge Booster
Similar questions
- Borges Machine Shop, Inc., has a 1-year contract for the production of 250,000 gear housings for a new off-road vehicle. Owner Luis Borges hopes the contract will be extended and the volume increased next year. Borges has developed costs for three alternatives. They are general-purpose equipment (GPE), flexible manufacturing system (FMS), and expensive, but efficient, dedicated machine (DM). The cost data follow: General Purpose Equipment (GPE) Flexible Manufacturing System (FMS) 250,000 $125,000 $15.00 Annual contracted units Annual fixed cost Per unit variable cost The option GPE is best when the contracted volume is below units (enter your response as a whole number). Dedicated Machine (DM) 250,000 $225,000 $14.00 250,000 $525,000 $13.00arrow_forwardBorges Machine Shop, Inc., has a 1-year contract for the production of 250,000gear housings for a new off-road vehicle. Owner Luis Borges hopes the contract will be extended and the volume increased next year. Borges has developed costs for three alternatives. They are general-purpose equipment (GPE), flexible manufacturing system (FMS), and expensive, but efficient, dedicated machine (DM). The cost data follow: General-Purpose Equipment (GPE) Flexible Manufacturing System (FMS) Dedicated Machine (DM) Annual contracted units 250,000 250,000 250,000 Annual fixed cost $125,000 $200,000 $525,000 Per unit variable cost $16.00 $14.00 $13.00 The option GPE is best when the contracted volume is below…arrow_forwardBorges Machine Shop, Inc., has a 1-year contract for the production of 250,000 gear housings for a new off-road vehicle. Owner Luis Borges hopes the contract will be extended and the volume increased next year. Borges has developed costs for three alternatives. They are general-purpose equipment (GPE), flexible manufacturing system (FMS), and expensive, but efficient, dedicated machine (DM). The cost data follow: The option GPE is best when the contracted volume is below Annual contracted units Annual fixed cost Per unit variable cost General-Purpose Equipment (GPE) 250,000 $150,000 $18.00 units (enter your response as a whole number). Flexible Manufacturing System (FMS) 250,000 $250,000 $14.00 Dedicated Machine (DM) 250,000 $500,000 $13.00arrow_forward
- Borges Machine Shop, Inc., has a 1-year contract for the production of 75,000 gear housings for a new off-road vehicle. Owner Luis Borges hopes the contract will be extended and the volume increased next year. Borges has developed costs for three alternatives. They are general-purpose equipment (GPE), flexible manufacturing system (FMS), and expensive, but efficient, dedicated machine (DM). The cost data follow: General-Purpose Equipment (GPE) Flexible Manufacturing System (FMS) Dedicated Machine (DM) Annual contracted units 75,000 75,000 75,000 Annual fixed cost $100,000 $200,000 $525,000 Per unit variable cost $15.00 $14.00 $13.75 Part 2 Based on the total cost, the process that is best suited for…arrow_forwardBorges Machine Shop, Inc., has a 1-year contract for the production of 75,000 gear housings for a new off-road vehicle. Owner Luis Borges hopes the contract will be extended and the volume increased next year. Borges has developed costs for three alternatives. They are general-purpose equipment (GPE), flexible manufacturing system (FMS), and expensive, but efficient, dedicated machine (DM). The cost data follow: General-Purpose Equipment (GPE) Flexible Manufacturing System (FMS) Dedicated Machine (DM) Annual contracted units 75,000 75,000 75,000 Annual fixed cost $150,000 $250,000 $500,000 Per unit variable cost $16.00 $14.75 $13.00 Part 2 Based on the total cost, the process that is best suited for…arrow_forwardBorges Machine Shop, Inc., has a 1-year contract for the production of 200,000 gear housings for a new off-road vehicle. Owner Luis Borges hopes the contract will be extended and the volume increased next year. Borges has developed costs for three alternatives. They are general-purpose equipment (GPE), flexible manufacturing system (FMS), and expensive, but efficient, dedicated machine (DM). The cost data follow: General-Purpose Equipment (GPE) Flexible Manufacturing System (FMS) Dedicated Machine (DM) 200,000 Annual contracted units Annual fixed cost Per unit variable cost $125,000 $16.00 If the contract for the second and third years is pending, for demand below 37,500 units, option FMS is the best alternative for Luis. For demand above 280,000 units, option is the best alternative for Luis 200,000 $200,000 $14.00 200,000 $480,000 $13.00arrow_forward
- Borges Machine Shop, Inc., has a 1-year contract for the production of 250,000 gear housings for a new off-road vehicle. Owner Luis Borges hopes the contract will be extended and the volume increased next year. Borges has developed costs for three alternatives. They are general-purpose equipment (GPE), flexible manufacturing system (FMS), and expensive, but efficient, dedicated machine (DM). The cost data follow: General-Purpose Equipment (GPE) Flexible Manufacturing System (FMS) Dedicated Machine (DM) Annual contracted units 250,000 250,000 250,000 Annual fixed cost $125,000 $250,000 $500,000 Per unit variable cost $18.00 $14.00 $13.00 If the contract for the second and third years is pending, for…arrow_forwardBorges Machine Shop, Inc., has a 1-year contract for the production of 225,000 gear housings for a new off-road vehicle. Owner Luis Borges hopes the contract will be extended and the volume increased next year. Borges has developed costs for three alternatives. They are general-purpose equipment (GPE), flexible manufacturing system (FMS), and expensive, but efficient, dedicated machine (DM). The cost data follow: The option GPE is best when the contracted volume is below General-Purpose Equipment (GPE) 225,000 Annual contracted units Annual fixed cost $150,000 $15.00 Per unit variable cost units (enter your response as a whole number). Flexible Manufacturing System (FMS) 225,000 $225,000 $14.00 Dedicated Machine (DM) 225,000 $480,000 $13.00arrow_forwardBorges Machine Shop, Inc., has a 1-year contract for the production of 225,000 gear housings for a new off-road vehicle. Owner Luis Borges hopes the contract will be extended and the volume increased next year. Borges has developed costs for three alternatives. They are general-purpose equipment (GPE), flexible manufacturing system (FMS), and expensive, but efficient, dedicated machine (DM). The cost data follow: General-Purpose Equipment (GPE) Flexible Manufacturing System (FMS) Dedicated Machine (DM)Annual contracted units 225,000 225,000 225,000 Annual fixed cost $125,000 $250,000 $480,000 Per unit variable cost $18.00 $14.00 $13.00 a.The option GPE is best when the contracted volume is below ------ units (enter your response as a whole number).…arrow_forward
- Borges Machine Shop, Inc., has a 1-year contract for the production of 225,000 gear housings for a new off-road vehicle. Owner Luis Borges hopes the contract will be extended and the volume increased next year. Borges has developed costs for three alternatives. They are general-purpose equipment (GPE), flexible manufacturing system (FMS), and expensive, but efficient, dedicated machine (DM). The cost data follow: General-Purpose Equipment (GPE) Flexible Manufacturing System (FMS) Dedicated Machine (DM) Annual contracted units 225,000 225,000 225,000 Annual fixed cost $100,000 $225,000 $480,000 Per unit variable cost $16.00 $14.00 $13.00 Part 2 The option GPE is best when the contracted volume is below…arrow_forwardRefer to Problem 7.1. If a contract for the secondand third years is pending, what a re the implications fo r processselection?arrow_forwardA tows analysis for Virgin Atlantic Airway?arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios