Alaska Airlines: 20-Minute Baggage Process—Guaranteed!
Alaska Airlines is unique among the nine major U.S. carriers not only for its extensive flight coverage of remote towns throughout Alaska (it also covers the U.S., Hawaii, and Mexico from its primary hub in Seattle). It is also one of the smallest independent airlines, with 10,300 employees, including 3.000 flight attendants and 1.500 pilots. What makes it really unique, though, is its ability to build state-of-the-art processes, using the latest technology, that yield high customer satisfaction. Indeed, J. D. Power and Associates has ranked Alaska Airlines highest in North America for seven years in a row for customer satisfaction.
Alaska Airlines was the first to sell tickets via the Internet, first to offer Web check-in and print boarding passes online, and first with kiosk check-in. As Wayne Newton. Director of System Operation Control, states, “We are passionate about our processes. If it’s not measured, it’s not managed.”
One of the processes Alaska is most proud of is its baggage handling system. Passengers can check in at kiosks, tag their own bags with bar code stickers, and deliver them to a customer service agent at the carousel, which carries the bags through the vast underground system that eventually delivers the bags to a baggage handler. En route, each bag passes through TSA automated screening and is manually opened or inspected if it appears suspicious. With the help of bar code readers, conveyer belts automatically sort and transfer bags to their location (called a “pier”) at the tarmac level. A baggage handler then loads the bags onto a cart and takes it to the plane for loading by the ramp team waiting inside the cargo hold. There are different procedures for “hot bags” (bags that have less than 30 minutes between transfer) and for “cold bags” (bags with over 60 minutes between plane transfers). Hot bags are delivered directly from one plane to another (called “tail-to-tail”). Cold bags are sent back into the normal conveyer system.
The process continues on the destination side with Alaska’s unique guarantee that customer luggage will be delivered to the terminal’s carousel within 20 minutes of the plane’s arrival at the gate. If not, Alaska grants each passenger a 2,000 frequent-flier mile bonus!
The airline’s use of technology includes bar code scanners to check in the bag when a passenger arrives, and again before it is placed on the cart to the plane. Similarly, on arrival, the time the passenger door opens is electronically noted and bags are again scanned as they are placed on the baggage carousel at the destination tracking this metric means that the “time to carousel” (TTC) deadline is seldom missed. And the process almost guarantees that the lost bag rate approaches zero. On a recent day, only one out of 100 flights missed the TTC mark. The baggage process relies not just on technology, though. There are detailed, documented procedures to ensure that bags hit the 20-minute timeframe. Within one minute of the plane door opening at the gate, baggage handlers must begin the unloading. The first bag must be out of the plane within three minutes of parking the plane. This means the ground crew must be in the proper location with their trucks and ramps in place and ready to go.
Largely because of technology, flying on Alaska Airlines is remarkably reliable—even in the dead of an Alaska winter with only two hours of daylight. 50 mph winds, slippery runways, and low visibility. Alaska Airlines has had the industry’s best on-time performance, with 87% if its flights landing on time.
Discussion Questions*
1. Prepare a flowchart of the process a passenger’s bag follows from kiosk to destination carousel. (See Example 2 in Chapter 6 for a sample flowchart.) Include the exception process for the TSA opening of selected bags.
2. What other processes can an airline examine? Why is each important’?
3. How does the kiosk alter the check-in process?
4. What metrics (quantifiable measures) are needed to track baggage?
5. What is the role of scanners in the baggage process?
*You may wish to view the video that accompanies this case before addressing these questions.
Want to see the full answer?
Check out a sample textbook solutionChapter 7 Solutions
PRIN.OF OPERATIONS MANAGEMENT-MYOMLAB
- This area of emotional intelligence describes your ability to not only understand your strengths and weaknesses but to recognize your emotions and their effect on you and your team’s performance self management self awareness relationship management social awarenessarrow_forwardEmotional intelligence is defined as the ability to understand and manage your emotions, as well as recognize and influence the emotions of those around you. True Falsearrow_forwardAt the Ford automobile Highland plant, assume the one-millionth vehicle was produced in 1916 at a cost of $8084 (in 2013 US$), by how much did the Ford company reduce his cost with each doubling of cumulative output from 1916 to 1927?arrow_forward
- At the Ford automobile Highland plant,in 1913, how long did the average worker stay with the plant and what was the average tenure of a worker?arrow_forwardCommunity Federal Bank in Dothan, Alabama, recently increased its fees to customers who use employees as tellers. Management is interested in whether its new tee policy has increased the number of customers now using its automatic teller machines to that point that more machines are required. The following table provides the number of automatic teller transactions by week. Use trend projection with regression to forecast usage for weeks 13-16.arrow_forwardDavison Electronics manufactures three LED television monitors, identified as Model A, Model B, and Model C. Davison Electronics four manufacturing plants. Each model has its lowest possible production cost when produced at Plant 1. However, Plant 1 does not have the capacity to handle the total production of all three models. As a result, at least some of the production must be routed to the other manufacturing plants. The following table shows the minimum production requirements for next month, the plant capacities in units per month, and the production cost per unit at each plant: Model Production Cost per Unit Minimum Production Requirements Plant 1 Plant 2 Plant 3 Plant 4 A $25 $28 $37 $34 48,000 B $26 $35 $36 $41 75,000 C $20 $31 $26 $23 60,000 Production Capacity 65,000 50,000 32,000 43,000 Davison’s objective is to determine the cost-minimizing production planarrow_forward
- Anecdotally, entrepreneurs frequently encounter two critical dilemmas in managing human resources: the timing of hiring and the decision regarding hiring a generalist versus a specialist for their growing venture. Deciding when to expand a team is crucial, as premature hiring (i.e., hiring too soon) can strain resources, while delayed hiring (i.e., hiring too late) might hinder growth opportunities. Moreover, the choice between hiring a generalist or a specialist depends on the specific needs and stage of the venture, with each option presenting distinct advantages and challenges. To address these issues, a management scholar seeks to identify the factors shaping the hiring cycle throughout the entrepreneurial journey and to understand the criteria for choosing between generalists and specialists at various stages of a venture. The scholar has assembled a sample of 20 experienced South African entrepreneurs who have encountered both failure and success in the financial technology…arrow_forward3. [25 pts.] Four projects are available for investment. The projects require the cash flows and yield the net present values (NPV) (in millions) shown in the following table. Project id. 1 2 Cash outflow at time 0 (million Lira) 8 8 NPV (million Lira) 12 11 3 4 6 5 8 6 If 20 million Lira is available for investment at time 0, find the investment plan that maximizes NPV. All investments are required to be 0 or 1 (fractional investment values are not permitted). a. Formulate the mathematical model. (Write the decision variables, objective function and the constraints.) [10 pts.] b. Find the optimal solution by using Branch and Bound method (Draw the branch and bound tree clearly, write also lower bounds(LB)) (Left branches x=0, right branches x =1) [15 pts.].arrow_forwardexamine the production concept and operations management, what are the key steps required to achieve success? Be specific in your response.arrow_forward
- Produce a 3000 report with references on one international organization of your choice and Address the following: Provide a brief introduction of the organisation and sector it operates in, including its mission and vision statements, its core values, a summary of its financial performance and a general overview of the business’s operational activities. From the relevant literature explain the Total Quality Management (TQM) processes the chosen organization follows and identify one quality challenge/issue that the organization faced or is currently facing. Explain how the organization managed/or still managing the particular quality challenge/issue. Critically analyze whether the organization failed or succeeded in achieving and maintaining quality performance. Provide a few critical recommendations for business managers in order to highlight the importance of Total Quality Management (TQM) within an organization.arrow_forward問題2 Production system design involves determining the arrangement of workstations and the... O allocation of resources to workstations design of the process O production schedule all of the abovearrow_forwardElaborate on the need for and the benefits of an effective supply chain management (SCM) system in the context of a globalized and networked economy. In your answer, explain how organizations like Dell and Hewlett-Packard leverage supply chain networks to maintain competitiveness, and analyse the impact of globalization, technological advancements, and business environment changes on supply chain structures. Additionally, evaluate the key components of SCM, including distribution network configuration, inventory management, and cash-flow management, and discuss how these components contribute to creating an effective and integrated supply chain. (15) 3.2. Critically evaluate the requirements for effective inventory management within an organization. In your answer, discuss the importance of inventory accounting systems, the role of cost information (holding, ordering, and shortage costs), and the significance of classification systems like ABC analysis. Additionally, analyse how…arrow_forward
- Purchasing and Supply Chain ManagementOperations ManagementISBN:9781285869681Author:Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. PattersonPublisher:Cengage Learning
- MarketingMarketingISBN:9780357033791Author:Pride, William MPublisher:South Western Educational PublishingPractical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,