EBK ELECTRICAL WIRING RESIDENTIAL
19th Edition
ISBN: 9781337516549
Author: Simmons
Publisher: CENGAGE LEARNING - CONSIGNMENT
expand_more
expand_more
format_list_bulleted
Concept explainers
Textbook Question
Chapter 6, Problem 35R
Which of the following installations for a kitchen waste disposal that operates on a 15-ampere, 120-volt branch circuit requires AFCI protection? (Circle the correct answer.)
- a. The disposal operates by a switch that is installed above the kitchen counter.
- b. The disposal operates by a switch that is installed under the counter next to the disposal.
- c. Both (a) and (b)
- d. Neither (a) nor (b).
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
schedules are typically provided to detail the circuits and overcurrent protection required for
listribution equipment.
Branch-circuit
- Outlet
C.
d.
ore distribution points for electrical in ....
Switch
Panelboard
Two of the circuits will be a 3-wire, multi-wire branch circuit (Edison 3-wire). The location of the devices is to be determined by the student. The student shall be responsible for selecting the correct circuits, do not ask the instructor which circuit number should be used.
Circuit A. One lampholder and one duplex receptacle controlled by a Single Pole Switch.
Circuit B. Single Pole Switch controlling the top half of a duplex receptacle that when energized, is indicated by a Pilot-light at the Single Pole Switch location; plus an Isolated Ground Duplex Receptacle that is always hot.
Circuit C. The bottom half of the switched receptacle on Circuit ‘B’ is to be always hot; plus another Duplex Receptacle that is controlled from two locations using a Coast 3-Way wiring-system.
STATE THE GENERAL RULES/PRINCIPLES APPLIED IN CALCULATING DPDs.
Chapter 6 Solutions
EBK ELECTRICAL WIRING RESIDENTIAL
Ch. 6 - Explain the operation of a ground-fault circuit...Ch. 6 - Prob. 2RCh. 6 - Where must GFCI receptacles be installed in...Ch. 6 - Prob. 4RCh. 6 - Prob. 5RCh. 6 - A homeowner calls in an electrical contractor to...Ch. 6 - Prob. 7RCh. 6 - Extremely long circuit runs connected to a GFCI...Ch. 6 - If a person comes in contact with the hot and...Ch. 6 - What might happen if the line and load connections...
Ch. 6 - Is a GFCI receptacle permitted be installed as a...Ch. 6 - Prob. 12RCh. 6 - Prob. 13RCh. 6 - Prob. 14RCh. 6 - Prob. 15RCh. 6 - Construction sites can be dangerous because of the...Ch. 6 - Prob. 17RCh. 6 - Prob. 18RCh. 6 - The term SPD is becoming quite common. What do the...Ch. 6 - Transients (surges) on a line can cause spikes or...Ch. 6 - Prob. 21RCh. 6 - Prob. 22RCh. 6 - Some line transients are not damaging to...Ch. 6 - Briefly explain the operation of an immersion...Ch. 6 - What range of leakage current must trip an IDCI?Ch. 6 - Prob. 26RCh. 6 - Other than for a few exceptions, the NEC requires...Ch. 6 - In an old house, an existing nongrounding...Ch. 6 - Prob. 29RCh. 6 - NEC 210.12(A) requires AFCI protection for the...Ch. 6 - When installing GFCI and AFCI circuit breakers in...Ch. 6 - Prob. 32RCh. 6 - Prob. 33RCh. 6 - A switch that is located inside a bedroom for an...Ch. 6 - Which of the following installations for a kitchen...Ch. 6 - The receptacle outlets in the garage are required...Ch. 6 - Two 125-volt receptacles on a 20-ampere, 120-volt...Ch. 6 - Prob. 38R
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, electrical-engineering and related others by exploring similar questions and additional content below.Similar questions
- The NEC requires that a ____________ means be provided for standby power systems. In the case of portable gen sets, this might be as simple as pulling out the plug on the extension cord that is plugged into the receptacle on the gen set. For permanently installed standby power generators, this might be on the gen set and/or separately provided inside or outside of the home.arrow_forwardThe easiest place to install an ammeter into a stepper motor driver/motor circuit for system diagnostics is to attach the meter in series with the driver’s power supply lead. remove a fuse and place the meter leads across the fuse clips. disconnect a motor lead and attach the meter in series with that lead. connect the meter across the center tap and phase leads of the motor.arrow_forward5. When seeking to measure the voltage of a wall outlet (120 Volts AC) an electie: needs to do the following to prepare the Simpson 260 meter for measurement an the words to make the following statements correct). a. Set the function switch to b. The black lead should be inserted in the jack. c. The red lead should be inserted in the jack. d. The range switch should be set to the position. Note the safety warning at the heading of Section 4.10. The Simpson folks are serious about this and so should we all be. 150 assign_ELTE108_Handout_Lab_02_2020-02-05 Page 4 of 12arrow_forward
- please answer all questions and give me a sample ansowers 1. What code sets standards for electrical installation work? 2. What authority enforces the requirements set by the NEC? 3. Does the NEC provide minimum or maximum standards? 4. What do the letters “UL” signify? 5. What section of the NEC states that all listed or labeled equipment shall be installed or used in accordance with any instructions included in the listing or labeling? 6. When the word “shall” appears in a NEC reference, it means that it (must)(may) be done. (Underline the correct word.) 7. What is the purpose of the NEC?arrow_forwardQuestion.arrow_forward45. A switch or circuit breaker can be used as both the controller and disconnecting means if it a. opens all ungrounded conductors as required by NEC 430.103 b. is protected by an overcurrent device in each ungrounded conductor c. is manually operable, or both power and manually operable d. All of these answersarrow_forward
- How many lighting branch circuits are provided in this dwelling? __________ a. What is the minimum load allowance for small-appliance circuits for dwellings? See NEC 220.52(A). __________ b. An individual 15-ampere branch circuit is run to the receptacle outlet behind the refrigerator instead of connecting it to one of the two 20-ampere small-appliance branch circuits that are required in kitchens. For this separate circuit, an additional 1500 volt-amperes (shall) (does not have to) be added to the load calculations for dwellings. (Circle the correct answer.)arrow_forwardTan delta and partial discharge diagnostics are the most common electrical testing techniques used for high voltage equipment. Differentiate both techniques.arrow_forwardAn isolator is used to: Select one: a. To be mounted on towers for insulation purpose b. All of the above c. to disconnect part of the system for maintenance from live circuit d. Insulate the wires to avoid electrocution and short circuits Clear my choicearrow_forward
- 20. Four electricians are discussing wiring under raised floors in information technology equipment rooms.Electrician A says that wiring under the raised floor requires fire-resistant walls, floors, and ceilings betweenother occupancies. Electrician B says that wiring under the raised floor requires fire resistant halfway up thewalls and floors between other occupancies. Electrician C says that the room must employ a disconnectingmeans that removes half of the power to all equipment in the room. Electrician D says that a disconnectingmeans isn't necessary for the room. Which of the following statements is correct?A. Electrician A is correct.B. Electrician D is correct.C. Electrician B is correct.D. Electrician C is correct.arrow_forward13. What authority enforces the requirements set by the NEC? 14. Does the NEC provide minimum or maximum standards? 15. What do the letters “UL” signify? 16. What section of the NEC states that all listed or labeled equipment shall be installed or used in accordance with any instructions included in the listing or labeling? 17. When the word “shall” appears in a NEC reference, it means that it (must)(may) be done. (Underline the correct word.) 18. What is the purpose of the NEC?arrow_forwarda. The Code requires a minimum of two small-appliance circuits in a kitchen. Is it permitted to connect a receptacle in a dining room to one of the kitchen small-appliance circuits? _______________ What Code section applies to this situation? _______________ b. Are outdoor weatherproof receptacles permitted to be connected to a 20-ampere small-appliance circuit? _______________ c. Receptacles located above the countertops in the kitchen must be supplied by at least _______________ 20-ampere small-appliance circuits.arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- EBK ELECTRICAL WIRING RESIDENTIALElectrical EngineeringISBN:9781337516549Author:SimmonsPublisher:CENGAGE LEARNING - CONSIGNMENT
EBK ELECTRICAL WIRING RESIDENTIAL
Electrical Engineering
ISBN:9781337516549
Author:Simmons
Publisher:CENGAGE LEARNING - CONSIGNMENT
Why HIGH VOLTAGE DC power Transmission; Author: ElectroBOOM;https://www.youtube.com/watch?v=DFQG9kuXSxg;License: Standard Youtube License