Question
Book Icon
Chapter 6, Problem 15P
Summary Introduction

To determine: The new placement of departments that will minimize the total transportation costs.

Introduction:

Product layouts:

Product layout is a production system where the equipment and workstations are placed along the production and assembly lines.  A conveyor is used to move the production units along the line. Product layouts have specialized labor to perform specific functions with the help of equipment (programmed to do a specific tasks in a repetitive manner). The layout is mostly based on the processing sequence.

Process layouts:

Process layout is a production system where the equipment is placed in a system based on their functions. The production line is planned to eliminate wastes.  In certain process layouts, the machineries and work settings are not arranged as per the standardized production sequence. However, there would be an assembly having similar machineries and operational activities depending on the requirement. For example, paint department.

Blurred answer
Students have asked these similar questions
Competitive Landscape In the rapidly evolving tech industry, Apple faces competition from major players like Microsoft, Amazon, Google, and Samsung. How does Apple differentiate itself from these competitors in terms of innovation, marketing positioning, and customer loyalty?
3. Consider a process consisting of three resources. Assume there exists unlimited demand for the product. a. Resource 1 has a processing time of 6 minutes per unit. b. Resource 2 has a processing time of 3 minutes per unit. c. Resource 3 has a processing time of 5 minutes per unit. All three resources are staffed by one worker. a. Draw a process flow diagram of this process. b. What is the capacity of resource 2? c. What is the bottleneck in the process? d. What is the utilization of resource 2? e. How long does it take the process to produce 200 units starting with an empty system, assuming this is a worker-paced process?
You may need to use the appropriate technology to answer this question. Wood Watercolors is a commercial art gallery that uses a four-week periodic review system to reorder paintings for its showrooms. A one-week lead time is required to fill the order. Demand for one particular style of painting during the five-week replenishment period is normally distributed with a mean of 26 units and a standard deviation of 10 units. (a) At a particular periodic review, 16 units are in inventory. The curator places an order for 20 units. What is the probability that this style of painting will have a stock-out before an order that is placed at the next four-week review period arrives? (Round your answer to four decimal places.) (b) Assume that the gallery is willing to tolerate a 2.5% chance of a stock-out associated with a replenishment decision. How many paintings should the curator have ordered in part (a)? (Round your answer to the nearest integer.) paintings What is the replenishment level…

Chapter 6 Solutions

Connect Online Access for Operations Management

Ch. 6.3 - Prob. 3.1RQCh. 6.3 - Prob. 3.2RQCh. 6.5 - Prob. 1.1RQCh. 6.5 - Prob. 1.2RQCh. 6 - Explain the importance of process selection in...Ch. 6 - Briefly describe the five process types, and...Ch. 6 - Prob. 3DRQCh. 6 - Briefly describe computer-assisted approaches to...Ch. 6 - What is a flexible manufacturing system, and under...Ch. 6 - Prob. 6DRQCh. 6 - Why might the choice of equipment that provides...Ch. 6 - Prob. 8DRQCh. 6 - Prob. 9DRQCh. 6 - Briefly describe the two main layout types.Ch. 6 - Prob. 11DRQCh. 6 - Prob. 12DRQCh. 6 - What is the goal of Line balancing? What happens...Ch. 6 - Why are routing and scheduling continual problems...Ch. 6 - Prob. 15DRQCh. 6 - Prob. 16DRQCh. 6 - The City Transportation Planning Committee must...Ch. 6 - Identify the fixed-path and variable-path...Ch. 6 - Prob. 19DRQCh. 6 - Prob. 20DRQCh. 6 - Prob. 21DRQCh. 6 - Prob. 22DRQCh. 6 - What is cellular manufacturing? What are its main...Ch. 6 - Prob. 24DRQCh. 6 - Prob. 25DRQCh. 6 - Prob. 1TSCh. 6 - What trade-offs are involved when deciding how...Ch. 6 - Who needs to be involved in process selection?Ch. 6 - Prob. 4TSCh. 6 - Prob. 5TSCh. 6 - Prob. 1CTECh. 6 - Prob. 2CTECh. 6 - What are the risks of automating a production...Ch. 6 - Consider an assembly line such as the burrito...Ch. 6 - Prob. 1PCh. 6 - A manager wants to assign tasks to workstations as...Ch. 6 - A manager wants to assign tasks to workstations as...Ch. 6 - A producer of inkjet printer is planning to add a...Ch. 6 - As part of a major plant renovation project, the...Ch. 6 - Twelve tasks, with times and precedence...Ch. 6 - For the given set of tasks, do the following: a....Ch. 6 - A shop works a 400-minute day. The manager of the...Ch. 6 - Arrange six departments into a 2 3 grid so that...Ch. 6 - Using the information given in the preceding...Ch. 6 - Using the information in the following grid,...Ch. 6 - Arrange the eight departments shown in the...Ch. 6 - Arrange the departments so they satisfy the...Ch. 6 - a. Determine the placement of departments fix a...Ch. 6 - Prob. 15PCh. 6 - Develop a process layout that will minimize the...Ch. 6 - Prob. 17PCh. 6 - Rebalance the assembly line in Problem 7. This...
Knowledge Booster
Background pattern image
Similar questions
SEE MORE QUESTIONS
Recommended textbooks for you
Text book image
Practical Management Science
Operations Management
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:Cengage,
Text book image
MARKETING 2018
Marketing
ISBN:9780357033753
Author:Pride
Publisher:CENGAGE L