COMPUTER SYSTEMS&MOD MSGT/ET SA AC PKG
3rd Edition
ISBN: 9780134671123
Author: Bryant
Publisher: PEARSON
expand_more
expand_more
format_list_bulleted
Question
Chapter 4.5, Problem 4.43PP
Program Plan Intro
Processing stages:
- The processing of an instruction has number of operations.
- The operations are organized into particular sequence of stages.
- It attempts to follow a uniform sequence for all instructions.
- The description of stages are shown below:
- Fetch:
- It uses program counter “PC” as memory address to read instruction bytes from memory.
- The 4-bit portions “icode” and “ifun” of specifier byte is extracted from instruction.
- It fetches “valC” that denotes an 8-byte constant.
- It computes “valP” that denotes value of “PC” plus length of fetched instruction.
- Decode:
- The register file is been read with two operands.
- It gives values “valA” and “valB” for operands.
- It reads registers with instruction fields “rA” and “rB”.
- Execute:
- In this stage the ALU either performs required operation or increments and decrements stack pointer.
- The resulting value is termed as “valE”.
- The condition codes are evaluated and destination register is updated based on condition.
- It determines whether branch should be taken or not in a jump instruction.
- Memory:
- The data is been written to memory or read from memory in this stage.
- The value that is read is determined as “valM”.
- Write back:
- The results are been written to register file.
- It can write up to 2 results.
- PC update:
- The program counter “PC” denotes memory address to read bytes of instruction from memory.
- It is used to set next instruction’s address.
- Fetch:
Backward taken, forward not taken (BTFNT):
- It predicts that if branches to lower addresses the next instruction will be taken.
- If it branches to higher addresses then next instruction will not be taken.
- This strategy has a success rate of 65%.
- The loops are executed multiple times and are closed by backward branches.
- The forward branches are used for conditional operations, and are less likely to be taken.
Expert Solution & Answer
![Check Mark](/static/check-mark.png)
Want to see the full answer?
Check out a sample textbook solution![Blurred answer](/static/blurred-answer.jpg)
Students have asked these similar questions
Using R language
(Using R language)
After our initial deployment for our ML home based security system, the first steps we took to contribute further to the project, we conducted load testing, tested and optimize for low latency, and automated user onboarding. What should be next?
Chapter 4 Solutions
COMPUTER SYSTEMS&MOD MSGT/ET SA AC PKG
Ch. 4.1 - Prob. 4.1PPCh. 4.1 - Prob. 4.2PPCh. 4.1 - Prob. 4.3PPCh. 4.1 - Prob. 4.4PPCh. 4.1 - Prob. 4.5PPCh. 4.1 - Prob. 4.6PPCh. 4.1 - Prob. 4.7PPCh. 4.1 - Prob. 4.8PPCh. 4.2 - Practice Problem 4.9 (solution page 484) Write an...Ch. 4.2 - Prob. 4.10PP
Ch. 4.2 - Prob. 4.11PPCh. 4.2 - Prob. 4.12PPCh. 4.3 - Prob. 4.13PPCh. 4.3 - Prob. 4.14PPCh. 4.3 - Prob. 4.15PPCh. 4.3 - Prob. 4.16PPCh. 4.3 - Prob. 4.17PPCh. 4.3 - Prob. 4.18PPCh. 4.3 - Prob. 4.19PPCh. 4.3 - Prob. 4.20PPCh. 4.3 - Prob. 4.21PPCh. 4.3 - Prob. 4.22PPCh. 4.3 - Prob. 4.23PPCh. 4.3 - Prob. 4.24PPCh. 4.3 - Prob. 4.25PPCh. 4.3 - Prob. 4.26PPCh. 4.3 - Prob. 4.27PPCh. 4.4 - Prob. 4.28PPCh. 4.4 - Prob. 4.29PPCh. 4.5 - Prob. 4.30PPCh. 4.5 - Prob. 4.31PPCh. 4.5 - Prob. 4.32PPCh. 4.5 - Prob. 4.33PPCh. 4.5 - Prob. 4.34PPCh. 4.5 - Prob. 4.35PPCh. 4.5 - Prob. 4.36PPCh. 4.5 - Prob. 4.37PPCh. 4.5 - Prob. 4.38PPCh. 4.5 - Prob. 4.39PPCh. 4.5 - Prob. 4.40PPCh. 4.5 - Prob. 4.41PPCh. 4.5 - Prob. 4.42PPCh. 4.5 - Prob. 4.43PPCh. 4.5 - Prob. 4.44PPCh. 4 - Prob. 4.45HWCh. 4 - Prob. 4.46HWCh. 4 - Prob. 4.47HWCh. 4 - Prob. 4.48HWCh. 4 - Modify the code you wrote for Problem 4.47 to...Ch. 4 - In Section 3.6.8, we saw that a common way to...Ch. 4 - Prob. 4.51HWCh. 4 - The file seq-full.hcl contains the HCL description...Ch. 4 - Prob. 4.53HWCh. 4 - The file pie=full. hcl contains a copy of the PIPE...Ch. 4 - Prob. 4.55HWCh. 4 - Prob. 4.56HWCh. 4 - Prob. 4.57HWCh. 4 - Our pipelined design is a bit unrealistic in that...Ch. 4 - Prob. 4.59HW
Knowledge Booster
Similar questions
- Why investing in skills and technology is a critical factor in the financial management aspect of system projects.arrow_forwardwhy investing in skills and technology is a critical factor in the financial management aspect of systems projects.arrow_forwardWhy are requirements changing a significant source of risks in system projects?arrow_forward
- I need helpt o resolve the following issuearrow_forwardI would like to know a brief explanation of basic project management concepts.arrow_forwardEX:[AE00]=fa50h number of ones =1111 1010 0101 0000 Physical address=4AE00h=4000h*10h+AE00h Mov ax,4000 Mov ds,ax; DS=4000h mov ds,4000 X Mov ax,[AE00] ; ax=[ae00]=FA50h Mov cx,10; 16 bit in decimal Mov bl,0 *: Ror ax,1 Jnc ** Inc bl **:Dec cx Jnz * ;LSB⇒CF Cf=1 ; it jump when CF=0, will not jump when CF=1 HW1: rewrite the above example use another wayarrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Operations Research : Applications and AlgorithmsComputer ScienceISBN:9780534380588Author:Wayne L. WinstonPublisher:Brooks ColeC++ for Engineers and ScientistsComputer ScienceISBN:9781133187844Author:Bronson, Gary J.Publisher:Course Technology Ptr
![Text book image](https://www.bartleby.com/isbn_cover_images/9780534380588/9780534380588_smallCoverImage.gif)
Operations Research : Applications and Algorithms
Computer Science
ISBN:9780534380588
Author:Wayne L. Winston
Publisher:Brooks Cole
![Text book image](https://www.bartleby.com/isbn_cover_images/9781133187844/9781133187844_smallCoverImage.gif)
C++ for Engineers and Scientists
Computer Science
ISBN:9781133187844
Author:Bronson, Gary J.
Publisher:Course Technology Ptr