Here are some questions about the route sheet:
- What is the function of a route sheet?
- Find an example of a route sheet other than the one in the book.
- What are other names for a route sheet?
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
Please don't provide handwritten solution ....
type theory in ms word and draw fig on A4 pages
What is an example of a WBS in project management thats a home improvement project?
How do you create an AOA or AON diagram of this WBS?
Chapter 41 Solutions
Degarmo's Materials And Processes In Manufacturing
Ch. 41 - What are the major functional elements or...Ch. 41 - Here are some questions about the route sheet:...Ch. 41 - What is a process flow chart? How is it related to...Ch. 41 - Prob. 4RQCh. 41 - Prob. 5RQCh. 41 - What is MRP and how is it related (tied to) the...Ch. 41 - Prob. 7RQCh. 41 - Prob. 8RQCh. 41 - Prob. 9RQCh. 41 - Prob. 10RQ
Ch. 41 - Prob. 11RQCh. 41 - Prob. 12RQCh. 41 - Suppose that the part in Figure 41.6 was to be...Ch. 41 - Construct a route sheet and an operations sheet...Ch. 41 - Prob. 15RQCh. 41 - Prob. 16RQCh. 41 - Prob. 17RQCh. 41 - Why does a factory need operations sheets?Ch. 41 - Prob. 19RQCh. 41 - Prob. 20RQCh. 41 - Prob. 21RQCh. 41 - The classic manufacturing systems are controlled...Ch. 41 - Compare your college or university to a...Ch. 41 - Prob. 3P
Additional Engineering Textbook Solutions
Find more solutions based on key concepts
The surface temperature of transmission.
Introduction to Heat Transfer
Determine the speed at which the basketball at A must be thrown at the angle of 30so that it makes it to the ba...
Engineering Mechanics: Dynamics (14th Edition)
What parts are included in the vehicle chassis?
Automotive Technology: Principles, Diagnosis, and Service (5th Edition)
ICA 13-22
As a reminder, the Reynolds number is discussed in Chapter 9. Dimensionless Number.
When discussing t...
Thinking Like an Engineer: An Active Learning Approach (4th Edition)
The force in each supporting cable.
Engineering Mechanics: Statics & Dynamics (14th Edition)
In each case, construct the parallelogram law to show FR = F1 + F2. Then establish the triangle rule, where FR ...
Statics and Mechanics of Materials (5th Edition)
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, mechanical-engineering and related others by exploring similar questions and additional content below.Similar questions
- Instructions: • Create a step by step and detailed explanation on how to solve the problem attached below. Create a script-like document like how you would explain this in a video presentation. Explain every single step with full details. Think of it that you have a youtube channel and you are explaining this problem step by step and on this document you will put the transcript of your video presentation except there is no video presentation only the transcript is needed. • Include complete solution and what formulas are used. PROBLEM: Given is a thin-walled tube with the following data: Wall thickness- 2mm ABC is a sector with a radius of 100 mm AOD & COD is a triangle Torque is 800 N.m Length of the thin walled tube is 2 m. Use G=24 GPa for aluminium B 30⁰ Determine the following: a. Enclosed Area b. Perimeter of the thin walled tube c. Shear flow d. Shear stress e. Angle of twistarrow_forwardGood handwriting pleasearrow_forwardTony’s Barbershop is run, owned, and operated by Anthony Jones, who has been cutting hairfor more than 20 years. Anthony does not take appointments, so the arrival pattern of customers is essentially random. Traditionally, the arrival rate had been about one customer every50 minutes. Two months ago, the local paper ran an article about Anthony that improved business substantially. Currently, the arrival rate is closer to one customer every 35 minutes. Haircutsrequire an average of 25 minutes, but the times vary considerably depending on customerneeds. A trim might require as little as 5 minutes, but a shampoo and styling could take as longas an hour or more. For this reason, the exponential distribution seems to provide a reasonablygood fit of the service time distribution.Anthony’s customers have always been patient, but ever since business picked up, somehave complained that the wait is too long. Anthony is considering taking his cousin Marvin intothe business to improve customer…arrow_forward
- Please solve the question on the sheet and get a clear picture and submit the picture. thankyouarrow_forwardA batch of 35 parts is ordered by a customer about every six months. The parts are currently processed sequentially through five conventional machines, listed in the following table with setup times and work cycle times per piece. These machines all require an operator to be in attendance during the work cycle. There is a delay of 10 hr/machine dueto transport between machines and waiting in queues of other parts processed by thesemachines. A recommendation has been made to process the parts on a new multitaskingmachine that would complete the batch in one setup, which would involve a simple fixtureand a setup time of 2.0 hr. The work cycle on the multitasking machine consists of thesame operations that are accomplished by the five machines, but the cycle time would beless than the sum of the five cycle times by one-half because of tool path improvementsand reduced part handling. Determine the manufacturing lead time (how long it takes tocomplete the batch of 35 parts, including…arrow_forward!arrow_forward
- Question and needed info below. Thank you in advancearrow_forwardAn order for 100 of a product is processed on work centers A and B. The setup time on A is 30 minutes, and run time is 10 minutes per piece. The setup time on B is 50 minutes, and the run time is 5 minutes per piece. Wait time between the two operations is 4 hours. The move time between A and B is 10 minutes. Wait time after operation B is 4 hours, and the move time into stores is 15 minutes. There is no queue at either workstation. If it is decided to overlap operations A and B by splitting the lot of 100 into two lots of 70 and 30. Wait time between A and B and between B and stores is eliminated. Setup on operation B can start before the first batch arrives. Calculate the manufacturing lead time for the whole order. Calculate the manufacturing lead time for the first patch.arrow_forwardDifferent companies use product mix price strategies when they are expanding the product line. Discussarrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Automotive Technology: A Systems Approach (MindTa...Mechanical EngineeringISBN:9781133612315Author:Jack Erjavec, Rob ThompsonPublisher:Cengage LearningPrecision Machining Technology (MindTap Course Li...Mechanical EngineeringISBN:9781285444543Author:Peter J. Hoffman, Eric S. Hopewell, Brian JanesPublisher:Cengage Learning
Automotive Technology: A Systems Approach (MindTa...
Mechanical Engineering
ISBN:9781133612315
Author:Jack Erjavec, Rob Thompson
Publisher:Cengage Learning
Precision Machining Technology (MindTap Course Li...
Mechanical Engineering
ISBN:9781285444543
Author:Peter J. Hoffman, Eric S. Hopewell, Brian Janes
Publisher:Cengage Learning
Mod-01 Lec-16 Basics of Instrumentation; Author: nptelhrd;https://www.youtube.com/watch?v=qbKnW42ZM5c;License: Standard YouTube License, CC-BY