Degarmo's Materials And Processes In Manufacturing
13th Edition
ISBN: 9781119492825
Author: Black, J. Temple, Kohser, Ronald A., Author.
Publisher: Wiley,
expand_more
expand_more
format_list_bulleted
Textbook Question
Chapter 41, Problem 2RQ
Here are some questions about the route sheet:
- What is the function of a route sheet?
- Find an example of a route sheet other than the one in the book.
- What are other names for a route sheet?
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
Instructions:
• Create a step by step and detailed explanation on how to solve the problem attached
below.
Create a script-like document like how you would explain this in a video presentation.
Explain every single step with full details.
Think of it that you have a youtube channel and you are explaining this problem step by
step and on this document you will put the transcript of your video presentation except
there is no video presentation only the transcript is needed.
• Include complete solution and what formulas are used.
PROBLEM:
Given is a thin-walled tube with the following data:
Wall thickness- 2mm
ABC is a sector with a radius of 100 mm
AOD & COD is a triangle
Torque is 800 N.m
Length of the thin walled tube is 2 m.
Use G=24 GPa for aluminium
B
30⁰
Determine the following:
a. Enclosed Area
b. Perimeter of the thin walled tube
c. Shear flow
d. Shear stress
e. Angle of twist
Good handwriting please
Please solve the question on the sheet and get a clear picture and submit the picture.
thankyou
Chapter 41 Solutions
Degarmo's Materials And Processes In Manufacturing
Ch. 41 - What are the major functional elements or...Ch. 41 - Here are some questions about the route sheet:...Ch. 41 - What is a process flow chart? How is it related to...Ch. 41 - Prob. 4RQCh. 41 - Prob. 5RQCh. 41 - What is MRP and how is it related (tied to) the...Ch. 41 - Prob. 7RQCh. 41 - Prob. 8RQCh. 41 - Prob. 9RQCh. 41 - Prob. 10RQ
Ch. 41 - Prob. 11RQCh. 41 - Prob. 12RQCh. 41 - Suppose that the part in Figure 41.6 was to be...Ch. 41 - Construct a route sheet and an operations sheet...Ch. 41 - Prob. 15RQCh. 41 - Prob. 16RQCh. 41 - Prob. 17RQCh. 41 - Why does a factory need operations sheets?Ch. 41 - Prob. 19RQCh. 41 - Prob. 20RQCh. 41 - Prob. 21RQCh. 41 - The classic manufacturing systems are controlled...Ch. 41 - Compare your college or university to a...Ch. 41 - Prob. 3P
Additional Engineering Textbook Solutions
Find more solutions based on key concepts
Open the Chap3\ Error3\ Error3 project from the student sample programs folder. The btnCalculate Click procedur...
Starting Out With Visual Basic (8th Edition)
How are relationships between tables expressed in a relational database?
Modern Database Management
It is not necessary to initialize accumulator variables.
Starting Out with Programming Logic and Design (5th Edition) (What's New in Computer Science)
The material for the 50-mm-long specimen has the stress-strain diagram shown. If P = 100 kN, determine the elon...
Mechanics of Materials (10th Edition)
1‘21 Same as Problem 1.20, excepi the anicle should be
on safety as related to su rveying-
Elementary Surveying: An Introduction To Geomatics (15th Edition)
Write an SQL statement to display the name and breed of all pets, sorted by PetName.
Database Concepts (8th Edition)
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, mechanical-engineering and related others by exploring similar questions and additional content below.Similar questions
- A batch of 35 parts is ordered by a customer about every six months. The parts are currently processed sequentially through five conventional machines, listed in the following table with setup times and work cycle times per piece. These machines all require an operator to be in attendance during the work cycle. There is a delay of 10 hr/machine dueto transport between machines and waiting in queues of other parts processed by thesemachines. A recommendation has been made to process the parts on a new multitaskingmachine that would complete the batch in one setup, which would involve a simple fixtureand a setup time of 2.0 hr. The work cycle on the multitasking machine consists of thesame operations that are accomplished by the five machines, but the cycle time would beless than the sum of the five cycle times by one-half because of tool path improvementsand reduced part handling. Determine the manufacturing lead time (how long it takes tocomplete the batch of 35 parts, including…arrow_forward!arrow_forwardHi guys. I need some advice in this problem. Can u please help me?arrow_forward
- Most of the CTDS representing Engineering products are: 3-levels. 2-levels. 4-levels. 5-levels.arrow_forwardWhat is an Mechanical Plan?arrow_forwardAn order for 100 of a product is processed on work centers A and B. The setup time on A is 30 minutes, and run time is 10 minutes per piece. The setup time on B is 50 minutes, and the run time is 5 minutes per piece. Wait time between the two operations is 4 hours. The move time between A and B is 10 minutes. Wait time after operation B is 4 hours, and the move time into stores is 15 minutes. There is no queue at either workstation. If it is decided to overlap operations A and B by splitting the lot of 100 into two lots of 70 and 30. Wait time between A and B and between B and stores is eliminated. Setup on operation B can start before the first batch arrives. Calculate the manufacturing lead time for the whole order. Calculate the manufacturing lead time for the first patch.arrow_forward
- Different companies use product mix price strategies when they are expanding the product line. Discussarrow_forwardTWM Company purchases 8000 units of product each year at a unit cost of $10.00. The order cost is $30.00 per order, and the holding cost per unit per year is $3.00. a) What are the economic order quantity, the total annual cost, the number of orders to place in one year, and the reorder point when the lead time is two weeks? b) What happens to the EOQ if backordering is possible and the stockout cost per unit per year is $1.00? c) The supplier is offering a special discount and has temporarily reduced his unit price from $10.00 to $9.00. What amount should be purchased to take advantage of the discount? d) The supplier will increase his unit price from $10.00 to $11.00 on 1 January. What amount should be purchased and delivered on 31 December before the price increase is effective if the stock position is 346 units? What will be the cost saving of the special purchasearrow_forwardAirbus is the other major manufacturer of large commercial aircraft along with Boeing. Interestingly, it offers a lineup of 11 commercial aircraft with the A2XX or A3XX naming convention. Based on Figure Q2(a), select the suitable facility layout for this aircraft manufactures and justify your answer with TWO (2) detail explanations regarding the characteristics of the layout selection.arrow_forward
- 14. What is the difference between unidirectional and bidirectional associativity? 15. Define an ideation sketch and explain how it differs from a document sketch.arrow_forwardAfter watching the following video:ABC Nightline. (2009, December 2). IDEO Shopping Cart. and read article: Boeing. (n.d.). The Boeing Design Change Process. 787updates After watching the video and reading the article, discuss the role of different members working together as a team in the design process?arrow_forwardExplain Design Procedure.arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Precision Machining Technology (MindTap Course Li...Mechanical EngineeringISBN:9781285444543Author:Peter J. Hoffman, Eric S. Hopewell, Brian JanesPublisher:Cengage LearningAutomotive Technology: A Systems Approach (MindTa...Mechanical EngineeringISBN:9781133612315Author:Jack Erjavec, Rob ThompsonPublisher:Cengage Learning
Precision Machining Technology (MindTap Course Li...
Mechanical Engineering
ISBN:9781285444543
Author:Peter J. Hoffman, Eric S. Hopewell, Brian Janes
Publisher:Cengage Learning
Automotive Technology: A Systems Approach (MindTa...
Mechanical Engineering
ISBN:9781133612315
Author:Jack Erjavec, Rob Thompson
Publisher:Cengage Learning
Mod-01 Lec-16 Basics of Instrumentation; Author: nptelhrd;https://www.youtube.com/watch?v=qbKnW42ZM5c;License: Standard YouTube License, CC-BY