Question
Chapter 4, Problem 7RQ
To determine
To describe: the requirement using the grid method for cut and fill volume calculation.
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
Why are overlays so dangerous?
What does Borings and test pits provides?
Describe Typical earth dam sections.
Chapter 4 Solutions
Fundamentals Of Construction Estimating
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.Similar questions
- Define the various types of boring with neat sketches ?arrow_forwardDescribe boring spacing and depth?arrow_forward34-A Use the CAD drawing below and determine distances A and B to the nearest hundredth inch. 3.25 A = .88 .94 .92 .90 75- ➡.50" 2.45" A- 1.75" 12 .25" 156 DIA. (2 HOLES) 25" R Cengage Learning 2013arrow_forward
- Describe about the Sliding Block Analysis.arrow_forwardThe table below gives area information on earthwork of road cross sections at three different stations. The cumulative amount of earthwork moved from station to station is most nearly: Station Sta 5 + 00 Sta 6+35 Cut (ft?) Fill (ft?) 60 80 120 150 Sta 8 + 65 200 210 O 2100 yd3 3921 ya O 1813 yd O 2931 ydarrow_forwardExplain the difference between precision and accuracy, and illustrate your answerby providing a suitable sketch?arrow_forward
- How did they get x and y valuesarrow_forwardAnswer Q1 and Q2 and Q3arrow_forwardThe areas in cut of two irregular sections 45 m apart are 44 m^2 and 66 m^2 respectively. The base width is 10 m and the side slopes are 1:1. Find the following: (a) Volume by end-area method (b) Volume by Prismoidal Formula Provide all necessary steps and diagrams if needed. Please write where I could clearly what letter or number is written. Thank you.arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Fundamentals Of Construction EstimatingCivil EngineeringISBN:9781337399395Author:Pratt, David J.Publisher:Cengage,Architectural Drafting and Design (MindTap Course...Civil EngineeringISBN:9781285165738Author:Alan Jefferis, David A. Madsen, David P. MadsenPublisher:Cengage Learning
Fundamentals Of Construction Estimating
Civil Engineering
ISBN:9781337399395
Author:Pratt, David J.
Publisher:Cengage,
Architectural Drafting and Design (MindTap Course...
Civil Engineering
ISBN:9781285165738
Author:Alan Jefferis, David A. Madsen, David P. Madsen
Publisher:Cengage Learning