Concept explainers
(a)
Interpretation: It is to be determined that the call center access time is in statistical control.
Concept Introduction:
The X-chart is used to determine the central tendency of the process. By using the X-chart it easy to determine the abnormalities of the process along with the errors which are responsible for these errors.
(b)
Interpretation: The capability of the process is to be determined when three-sigma performance is desired.
Concept Introduction:
The X-chart is used to determine the central tendency of the process. By using the X-chart it easy to determine the abnormalities of the process along with the errors which are responsible for these errors.
Want to see the full answer?
Check out a sample textbook solutionChapter 3 Solutions
Operations Management: Processes And Supply Chains (12th Global Edition) - Does Not Include Mylab Operations Management
- An ad agency tracks the complaints, by week received, about the billboards in its city: Week No. of Complaints 1 2 4 6 9. This exercise contains only parts a, b, and c. a) The type of control chart that is best to monitor this process is b) Using z = 3, the control chart limits for this process are (assume that the historical complaints rate is unknown): UCL, = complaints per week (round your response to two decimal places). %3D LCL, = complaints per week (round your response to two decimal places and if your answer is negative, enter this value as 0). c) According to the control limits, the process has been m6422arrow_forwardPatients at North Shore Family Practice are required to fill out a questionnaire that gives the doctor an overall idea of each patient’s health. The first question is: “In general, what is the quality of your health?” The patient chooses Excellent, Good, Fair, or Poor. A portion of the 150 responses is as follows: Response Quality 1 Fair 2 Good ⋮ ⋮ 150 Good picture Click here for the Excel Data File a-1. Construct the frequency distribution that summarizes the results from the questionnaire. a-2. What is the most common response to the questionnaire? multiple choice 1 Poor Fair Good Excellent b. Which of the above figures best represents the bar chart for Quality?arrow_forward1. Statistical process control, hypothesis testing, and control charts Consumers value prompt service when they order takeout or delivered pizza, and pizza restaurants compete for customers by making time promises. Papa John's, for instance, offers a 10-minute takeout guarantee. Domino's advertises a 30-minute delivery time. Suppose that the quality control manager at a nationwide pizza chain defines this production variable: An order is processed on time or late. Every night, a random sample of pizza orders is selected, and data are collected on the production variable for each order in the sample. To detect a change in the number of orders that are late, the quality control manager uses Based on the control chart, the quality control manager decides that the variation in output is due to assignable causes. Consequently, the manager concludes that the production process is ; it is Statistical procedures for process control use a hypothesis-testing framework. The null and alternative…arrow_forward
- Resistors for electronic circuits are manufactured on a high-speed automated machine. The machine is set up to produce a large run of resistors of 1,000 Ohms each. To set up the machine and to create a control chart to be used throughout the run, 15 samples and their measured values are as follows: Sample Number Readings (in Ohms) 1 1010 991 985 986 2 995 996 1009 994 3 990 1003 1015 1008 4 1015 1020 1009 998 5 1013 1019 1005 993 6 994 1001 994 1005 7 989 992 982 1020 8 1001 986 996 996 9 1006 989 1005 1007 10 992 1007 1006 979 11 996 1006 997 989 12 1019 996 991 1011 13 981 991 989 1003 14 999 993 988 984 15 1013 1002 1005 992 Develop three-sigma appropriate control chart(s) from the chart(s) what comments can you make about the process? Explain and show workarrow_forwardAssume the following: A quality manager at a popular restaurant in a New York has accurately measured the Cp & Cpk values associated with the delivery times of the food delivered by her restaurant. He has measured these values over an acceptable time period. The measured values are such that: Cp > 1, and Cpk < 1. Then: a. The process is both cappable and centered between the specification limits. b. The process is neither cappable nor centered between the specification limits. c. The process is cappable but not centered between the specification limits. d. The process is not cappable but centered between the specification limits.arrow_forwardOne of the stages in the process of making denim cloth at the Southern Mills Company is to spin cotton yarn onto spindles for subsequent use in the weaving process. Occasionally the yarn breaks during the spinning process, and an operator ties it back together. Some number of breaks is considered normal; however, too many breaks may mean that the yarn is of poor quality. In order to monitor this process, the quality-control manager randomly selects a spinning machine each hour and checks the number of breaks during a 15-minute period. Following is a summary of the observations for the past 20 hours. Construct a c-chart using 3 limits for this process and indicate if the process was out of control at any time.arrow_forward
- Webster Chemical’s nominal weight for filling tubes of caulk is 8.00 ounces ± 0.60 ounces. The target process capability ratio is 1.33. The current distribution of the filling process is centered on 8.054 ounces with a standard deviation of 0.192 ounces. Compute the process capability ratios Cp and Cpk to assess whether the filling process is capable and set properly.arrow_forwardSolve on EXCEL sprearrow_forwardA railway promises to ship freight from Toronto to Vancouver in 9 days, but customers consider any time between 6 and 14 days to be acceptable. Last week an auditor examined a sample of 71 shipments and found their delivery time had a mean of 10.4 days and a standard deviation of 1.5 days. The auditor also found 4 shipments where the customer had been charged too much money. With respect to shipping time, calculate the potential Sigma score for the process.arrow_forward
- Practical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,Operations ManagementOperations ManagementISBN:9781259667473Author:William J StevensonPublisher:McGraw-Hill EducationOperations and Supply Chain Management (Mcgraw-hi...Operations ManagementISBN:9781259666100Author:F. Robert Jacobs, Richard B ChasePublisher:McGraw-Hill Education
- Purchasing and Supply Chain ManagementOperations ManagementISBN:9781285869681Author:Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. PattersonPublisher:Cengage LearningProduction and Operations Analysis, Seventh Editi...Operations ManagementISBN:9781478623069Author:Steven Nahmias, Tava Lennon OlsenPublisher:Waveland Press, Inc.