M&L MANUFACTURING
M&L Manufacturing makes various components for printers and copiers. In addition to supplying these items to a major manufacturer, the company distributes these and similar items to office supply stores and computer stores as replacement parts for printers and desktop copiers in all the company makes about 20 different items. The two markets (the major manufacturer and the replacement market) require somewhat different handling. For example replacement products must be packaged individually whereas products are shipped in bulk to the major manufacturer.
The company does not use forecasts for production planning. Instead, the operations manager decides which items to produce and the batch size based on orders and the amounts in inventory. The products that have the fewest amounts in inventory get the highest priority. Demand is uneven, and the company has experienced being overstocked on some items and out of others. Being understocked has occasionally created tensions with the managers of retail outlets. Another problem is that prices of raw materials have been creeping up, although the operations manager thinks that this might be a temporary condition.
Because of competitive pressures and falling profits the manager has decide to undertake a number of changes. One change is to introduce more formal
With that m mind the manager wants to begin forecasting for two products. These products are important for several reasons. First, they account for a disproportionately large share of the company’s profits. Second, the manager believes that one of these products will become increasingly important to future growth plans and third, the other product has experienced periodic out-of-stock instances.
The manager has compiled data on product demand for the two products from order records for the previous 14 weeks. These are shown in the following table.
*Unusual order due to flooding of customer’s warehouse.
2. Prepare a weeldy forecast for the next four weeks each product. Briefly explain why you chose the method you used (Hint: For product 2, a simple approach, possibly some sort of naive/intuitive approach, would be preferable to a technical approach, would be preferable t a technical approach in view of the manager’s disdain of more technical methods.)
Want to see the full answer?
Check out a sample textbook solutionChapter 3 Solutions
EBK OPERATIONS MANAGEMENT
- Scenario 3 Ben Gibson, the purchasing manager at Coastal Products, was reviewing purchasing expenditures for packaging materials with Jeff Joyner. Ben was particularly disturbed about the amount spent on corrugated boxes purchased from Southeastern Corrugated. Ben said, I dont like the salesman from that company. He comes around here acting like he owns the place. He loves to tell us about his fancy car, house, and vacations. It seems to me he must be making too much money off of us! Jeff responded that he heard Southeastern Corrugated was going to ask for a price increase to cover the rising costs of raw material paper stock. Jeff further stated that Southeastern would probably ask for more than what was justified simply from rising paper stock costs. After the meeting, Ben decided he had heard enough. After all, he prided himself on being a results-oriented manager. There was no way he was going to allow that salesman to keep taking advantage of Coastal Products. Ben called Jeff and told him it was time to rebid the corrugated contract before Southeastern came in with a price increase request. Who did Jeff know that might be interested in the business? Jeff replied he had several companies in mind to include in the bidding process. These companies would surely come in at a lower price, partly because they used lower-grade boxes that would probably work well enough in Coastal Products process. Jeff also explained that these suppliers were not serious contenders for the business. Their purpose was to create competition with the bids. Ben told Jeff to make sure that Southeastern was well aware that these new suppliers were bidding on the contract. He also said to make sure the suppliers knew that price was going to be the determining factor in this quote, because he considered corrugated boxes to be a standard industry item. As the Marketing Manager for Southeastern Corrugated, what would you do upon receiving the request for quotation from Coastal Products?arrow_forwardX1=29000 X2=5 I need a step by step answer please (not on excel please)arrow_forwardA company produces and sells electronic components that are purchased by computer manufacturers. The company just received an order for 3000 circuit boards that must be delivered to the customer in 28 days. Shipping takes 4 days and every production run for this component takes 3 days for any quantity of circuit boards between 1800 and 4200. The Bill of Materials (listing the materials and quantities required to produce a single circuit board ordered) is in the table below: Quantity Component Required Input Bare printed 1 board Сарacitor 8 Op amp Resistor 4 Transistor 3.arrow_forward
- At the Lebanese factory "DELCO", John is using a system to produce the bar codes attached on the product bulks for identification. Each bulk contains 100 units of a certain product, and all the information related to the products inside the bulk are then represented by the barcode. Once prepared, the bulks are transferred to a very large warehouse and the location of each one is entered on the system. At a later stage, John uses the barcode in the warehouse to identify the right bulks for delivery, after being scanned using a special wireless barcode scanner. This way, John can decide in a better way how and when to make the shipments. This system helps John to save time and minimize the errors, and to perform his daily work in the most efficient way. On the other side, "DELCO" is facing a problem of late delivery to customers. In fact, dealing with hundreds of suppliers, wholesalers, and agents around the world makes this process very complicated. Most of the times, the shipments from…arrow_forwardX1= 29000 X2=5 I need a step by step answer please :)arrow_forwardAs regard to customer data as well as data from transactions, the Amazon Go model is premised on hundreds of pictures being taken of every person entering and exiting the store. Amazon then stores these pictures for long enough to identify the products being purchased, before the images are deleted. Credit card information is captured at the point of registration for the app that is required to use the Amazon Go stores, and then credit and debit card information is captured when purchases are made. Further receipts are issued after purchases are made, and the system also records how long an individual has been shopping for (this is printed on the receipt). With a need to capture and store such large volumes of information that is both sensitive and personal to people, it is not surprising that many are concerned for the security of the information and the potential for the information to fall into the wrong hands. Amazon Go stores are in their infancy, and have not had to deal with any…arrow_forward
- Determine an A-B-C classification for these items: Which items are A, B, and C - explain how you derive the answers? Use a table or excel spreadsheet to illustrate your work. Item Unit Cost Annual Volume (000)1 300 252 90 303 30 604 50 105 15 706 100 407 10 60 Hint:Determine the Annual Dollar Value (Unit Cost * Annual Volume) for each item and the sum of the individual Annual Dollar Values. Arrange the items in descending order based on Annual Dollar Values. Then, determine the percentage of items and the percentage of…arrow_forward3(AL Jn 2020, Square-Nine Entrerprise has purchased 250,000 micro-chips for the first four months and 35% more on the remainder as a component in the production of its products. As much as 25% of the purchase is not used but instead stored in the warehouse. Each unit of the final product is sold in the market at a price of $18.99 per unit, and the storage cost is a total of $1.13 per unit. The cost price of the order is $5,500 for each delivery that takes three weeks. Calculate: 1) An annual optimal order quantity. 2) A total of number of orders placed in a year. 3) Time range between orders if the company operates for 49 weeks in a year 4) What are total units for reorder point? 5) Cost of Goods Sold.arrow_forwardMr. Omar is a sales manager in Al Noor Company. He decided to drop the production of product A because he found that it is unprofitable. This is an advantage of:arrow_forward
- L. Houts Plastics is a large manufacturer of injection-molded plastics in North Carolina. An investigation of the company's manufacturing facility in Charlotte yields the information presented in the table below. How would the plant classify these items according to an classification system? (Round dollar volume to the nearest whole number and percentage of dollar volume to two decimal places.) Item number 2349 should be classified as Item Code Item number 8210 should be classified as 1289 2347 2349 2363 2394 2395 6782 7844 8210 8310 9111 L. Houts Plastics Charlotte Inventory Levels Value Dollar ($/unit) Volume Avg. Inventory (units) 400 300 120 75 89223 co 60 30 20 12 7 6 3.75 4.00 2.50 1.50 1.75 2.00 1.15 2.05 1.80 2.00 3.00 1,200 300 105 23 25 14 18 3,372 % of Dollar Volume 35.59 8.90 3.11 0.68 0.73 0 0.42 0.53 For the following three questions, consider only items 1289, 2349, and 8210 from the above table for relative classification (these are some of the items for which you…arrow_forwardmanagment information systemarrow_forwardStructure Furniture, manufactures coffee tables. Structure Furniture has a policy of adding a 20% markup to full costs and currently has excess capacity. The following information pertains to the company's normal operations per month: Output units Machine-hours 30,000tables 8,000hours Direct manufacturing labour-hours 10,000hours Direct materials per unit Direct manufacturing labour per hour Variable manufacturing overhead costs Fixed manufacturing overhead costs Product and process design costs Marketing and distribution costs S100 S12 $322,500 $1,200,000 $900,000 $1,125,000 a) Structure Furniture is approached by an overseas customer to fulfill a one-time-only special order for 1,000 units. All cost relationships remain the same except for a one-time setup charge of $20,000. No additional design, marketing, or distribution costs will be incurred. What is the minimum acceptable bid per unit on this one-time-only special order? b) What is the Structure Furniture full product cost for…arrow_forward