Equivalent units, comprehensive. Louisville Sports manufactures baseball bats for use by players in the major leagues. A critical requirement for elite players is that each bat they use have an identical look and feel. As a result, Louisville uses a dedicated process to produce bats to each player’s specifications.
One of Louisville’s key clients is Ryan Brown of the Green Bay Brewers. Producing his bat involves the use of three materials—ash, cork, and ink—and a sequence of 20 standardized steps. Materials are added as follows:
Ash: This is the basic wood used in bats. Eighty percent of the ash content is added at the start of the process; the rest is added at the start of the 16th step of the process.
Cork: This is inserted into the bat in order to increase Ryan’s bat speed. Half of the cork is introduced at the beginning of the seventh step of the process; the rest is added at the beginning of the 14th step.
Ink: This is used to stamp Ryan’s name on the finished bat and is added at the end of the process.
Of the total conversion costs, 6% are added during each of the first 10 steps of the process, and 4% are added at each of the remaining 10 steps.
On May 1, 2017, Louisville had 100 bats in inventory. These bats had completed the ninth step of the process as of April 30, 2017. During May, Louisville put another 60 bats into production. At the end of May, Louisville was left with 40 bats that had completed the 12th step of the production process.
- 1. Under the weighted-average method of
process costing , compute equivalent units of work done for each relevant input for the month of May. - 2. Under the FIFO method of process costing, compute equivalent units of work done for each relevant input for the month of May.
Want to see the full answer?
Check out a sample textbook solutionChapter 17 Solutions
COST ACCOUNTING
- Need answer of this Question in text Formatarrow_forwardHow do i identify and explain the most accurate method for direct and step down method?arrow_forwardCoastal Cycles makes three models of electric bicycles: E20, E35, and E60. The models differ by the size of the battery and the quality of the components. The bicycles are produced in two departments. The Assembly Department purchases components form vendors and assembles them into bicycles. The models E20 and E35 are complete and ready for sale after completing the assembly process. The model E60 undergoes further process in Customization department, which is actually just a small area in the same building as the Assembly Department. Conversion costs in both the Assembly Department and Customization Department are based on the number of units produced. There are never any work-in-process inventories. Data for production in November are shown in the following table. Total E20 E35 E60 Units produced…arrow_forward
- Coastal Cycles makes three models of electric bicycles: E20, E35, and E60. The models differ by the size of the battery and the quality of the components. The bicycles are produced in two departments. The Assembly Department purchases components from vendors and assembles them into bicycles. The models E20 and E35 are complete and ready for sale after completing the assembly process. The model E60 undergoes further process in Customization Department, which is actually just a small area in the same building as the Assembly Department. Conversion costs in both the Assembly Department and Customization Department are based on the number of units produced. There are never any work-in-process inventories. Data for production in November are shown in the following table. Total E20 E35 E60 Units produced 13,000 5,000 4,500 3,500 Materials cost $ 9,820,000 $ 2,500,000 $ 3,420,000 $ 3,900,000 Conversion costs Assembly…arrow_forwardCoastal Cycles makes three models of electric bicycles: E20, E35, and E60. The models differ by the size of the battery and the quality of the components. The bicycles are produced in two departments. The Assembly Department purchases components from vendors and assembles them into bicycles. The models E20 and E35 are complete and ready for sale after completing the assembly process. The model E60 undergoes further process in Customization Department, which is actually just a small area in the same building as the Assembly Department. Conversion costs in both the Assembly Department and Customization Department are based on the number of units produced. There are never any work-in-process inventories. Data for production in November are shown in the following table. Total E20 E35 E60 Units produced 11,500 4,500 4,000 3,000 Materials cost $ 8,590,000 $ 2,250,000 $ 3,040,000 $ 3,300,000 Conversion costs Assembly…arrow_forwardCoastal Cycles makes three models of electric bicycles: E20, E35, and E60. The models differ by the size of the battery and the quality of the components. The bicycles are produced in two departments. The Assembly Department purchases components from vendors and assembles them into bicycles. The models E20 and E35 are complete and ready for sale after completing the assembly process. The model E60 undergoes further process in Customization Department, which is actually just a small area in the same building as the Assembly Department. Conversion costs in both the Assembly Department and Customization Department are based on the number of units produced. There are never any work-in-process inventories. Data for production in November are shown in the following table. Total E20 E35 E60 Units produced 11,500 4,500 4,000 3,000 Materials cost $ 8,395,000 $ 2,250,000 $ 2,845,000 $ 3,300,000 Conversion costs…arrow_forward
- Vishnuarrow_forwardRecently, Mewah Designs expanded its market by becoming an original equipment supplier toJee Wrangler. Mewah Designs produces factory upgraded speakers specifically for JeeWrangler. The Kicker components and speaker cabinets are outsourced with assemblyremaining in-house. Mewah Designs assemble the product by placing the speakers and othercomponents in cabinets that define an audio package upgrade and that can be placed into theJee Wrangler, producing the desired factory-installed appearance. Speaker cabinets andassociated Kicker components are added at the beginning of the assembly process.Assume that Mewah Designs uses the weighted-average method to cost out the audio package.The following are cost and production data for the assembly process for April: Production:Units in process, April 1, 60% complete 60,000Units completed and transferred out 150,000Units in process, April 30, 20% complete 30,000Costs:WIP, April 1:Cabinets RM 1,200,000Kicker components RM 12,600,000Conversion costs…arrow_forwardPlease help mearrow_forward
- Clearview Window Company manufactures windows for the home-building industry. The window frames are produced in the Frame Division. The frames are then transferred to the Glass Division, where the glass and hardware are installed. The company’s best-selling product is a three-by-four-foot, doublepaned operable window. The Frame Division also can sell frames directly to custom home builders, who install the glass and hardware. The sales price for a frame is $80. The Glass Division sells its finished windows for $190. The markets for both frames and finished windows exhibit perfect competition. The standard variable cost of the window is detailed as follows: Frame Division Glass Division Direct material $ 15 $ 30 * Direct labor 20 15 Variable overhead 30 30 Total $ 65 $ 75 *Not including the transfer price for the frame. Assume that there is no excess capacity in the Frame Division. Required: 1-a. Use the general rule to compute the transfer price for window frames. 1-b. Calculate the…arrow_forwardO Hedwig Optical makes three models of binoculars: Travel, Sport, and Pro. The models differ by the size of the casing and the quality of the optics. The binoculars are produced in two departments. The Assembly Department purchases components from vendors and assembles them into binoculars. The Travel and Sport models are complete and ready for sale after completing the assembly process. The Pro model undergoes further processing in the Calibration Department, which is actually just a small area in the same building as the Assembly Department. Conversion costs in both the Assembly Department and Calibration Department are based on the number of units produced. There are never any work-in-process inventories. Data for production in January are shown in the following table: Units produced Materials cost Conversion costs Assembly Calibration Total conversion costs Travel Sport Pro Total 35,000 $ 1,645,000 Cost Per Unit $ 440,000 44,400 $ 484,400 Travel 17,500 Sport 13,125 4,375 $ 305,000…arrow_forwardGodaarrow_forward
- AccountingAccountingISBN:9781337272094Author:WARREN, Carl S., Reeve, James M., Duchac, Jonathan E.Publisher:Cengage Learning,Accounting Information SystemsAccountingISBN:9781337619202Author:Hall, James A.Publisher:Cengage Learning,
- Horngren's Cost Accounting: A Managerial Emphasis...AccountingISBN:9780134475585Author:Srikant M. Datar, Madhav V. RajanPublisher:PEARSONIntermediate AccountingAccountingISBN:9781259722660Author:J. David Spiceland, Mark W. Nelson, Wayne M ThomasPublisher:McGraw-Hill EducationFinancial and Managerial AccountingAccountingISBN:9781259726705Author:John J Wild, Ken W. Shaw, Barbara Chiappetta Fundamental Accounting PrinciplesPublisher:McGraw-Hill Education