Question
Chapter 17, Problem 15P
Summary Introduction
To determine: The reliability of the system.
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
A typical retail transaction consists of several smaller steps, which can be considered components subject to failure. A list of such components might include: Let the eight probabilities of success be .92, .94, .99, .99, .98, .97,.95, and .96. What is the reliability of the system; that is, the probabilitythat there will be a satisfied customer? If you were the storemanager, what do you think should be an acceptable value forthis probability? Which components would be good candidatesfor backup, which for redesign?
A typical retail transaction consists of severalsmaller steps, which can be considered components subject tofailure. A list of such components might include:
Let the eight probabilities of success be .92, .94, .99, .99, .98,.97, .95, and .96. What is the reliability of the system; thatis, the probability that there will be a satisfied customer? Ifyou were the store manager, what do you think should bean acceptable value for this probability? Which componentswould be good candidates for backup, which for redesign?
A product engineer has developed the following equation for the cost of a system component: C = (10P) 2, where C is the cost in dollars and P is the probability that the component will operate as expected. The system is composed of two identical components, both of which must operate forthe system to operate. The engineer can spend $173 for the two components. To the nearest two decimal places, what is the largest component probability that can be achieved?
Chapter 17 Solutions
PRIN.OF OPERATIONS MANAGEMENT-MYOMLAB
Ch. 17 - Prob. 1EDCh. 17 - Prob. 1DQCh. 17 - Prob. 2DQCh. 17 - Prob. 3DQCh. 17 - Prob. 4DQCh. 17 - What is the trade-off between operator-performed...Ch. 17 - Prob. 6DQCh. 17 - Prob. 7DQCh. 17 - Prob. 8DQCh. 17 - Prob. 9DQ
Ch. 17 - Prob. 10DQCh. 17 - Prob. 1PCh. 17 - Prob. 2PCh. 17 - Prob. 3PCh. 17 - Prob. 4PCh. 17 - Prob. 5PCh. 17 - Prob. 6PCh. 17 - Prob. 7PCh. 17 - Prob. 8PCh. 17 - Prob. 9PCh. 17 - What is the reliability of the system shown?Ch. 17 - Prob. 11PCh. 17 - Prob. 12PCh. 17 - Rick Wing, salesperson for Wave Soldering Systems,...Ch. 17 - Prob. 14PCh. 17 - Prob. 15PCh. 17 - Prob. 16PCh. 17 - Prob. 17PCh. 17 - What are the expected number of yearly breakdowns...Ch. 17 - Prob. 19PCh. 17 - Prob. 20PCh. 17 - Prob. 21PCh. 17 - Prob. 22PCh. 17 - Prob. 1VCCh. 17 - Prob. 2VCCh. 17 - Prob. 3VC
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, operations-management and related others by exploring similar questions and additional content below.Similar questions
- At the beginning of each week, a machine is in one of four conditions: 1 = excellent; 2 = good; 3 = average; 4 = bad. The weekly revenue earned by a machine in state 1, 2, 3, or 4 is 100, 90, 50, or 10, respectively. After observing the condition of the machine at the beginning of the week, the company has the option, for a cost of 200, of instantaneously replacing the machine with an excellent machine. The quality of the machine deteriorates over time, as shown in the file P10 41.xlsx. Four maintenance policies are under consideration: Policy 1: Never replace a machine. Policy 2: Immediately replace a bad machine. Policy 3: Immediately replace a bad or average machine. Policy 4: Immediately replace a bad, average, or good machine. Simulate each of these policies for 50 weeks (using at least 250 iterations each) to determine the policy that maximizes expected weekly profit. Assume that the machine at the beginning of week 1 is excellent.arrow_forwardAn operation consists of two steps , the first of which has a reliability of 97% and the second a reliability of 99%. What is the probability that the operation will fail? please I need full explanationarrow_forwardAn early warning security fence has three major components each must perform in order for the system to perform. Their reliabilities are .4, .3, and .2. The system reliability is equal to:arrow_forward
- A floor cleaning robot contains 4 modules that are critical to its operation. The modules and their individual reliabilities are listed below. Movement module 0.98 Data Storage Module 0.999 Learning Module 0.99 Vision Module 0.94 What is the probability that the system will be up and running? Suppose this number is too low and it is desired to improve the reliability through redundant elements. What would be the new reliability from each one of these changes? a. back up the Vision module with an identical module. b. back up the movement module with an identical module, but not the vision module.arrow_forwardThe reliability of a hard-disk drive is typically described in terms of a quantity called mean time between failures (MTBF). Although this quantity is called a “time,” the MTBF actually is measured in drive-hours per failure. If a system contains 1,000 disk drives, each of which has a 750,000-hour MTBF, which of the following best describes how often a drive failure will occur in that disk farm: once per thousand years, once per century, once per decade, once per year, once per month, once per week, once per day, once per hour, once per minute, or once per second?arrow_forwarda factory that produces a small number of items per day. In about 30% of working days the factory produces 7 units of the product, in 45% of working days it produces 8 units, and the rest of working days it produces 9 units. After production is completed, each unit is thoroughly inspected. Each unit fails inspection with probability ??. If two or more units fail inspection on the same day, the factory closes for a week to re-calibrate equipment. Say the factory opens today after being closed for a week, write a mathematical expression to calculate the probability that the factory will remain open at least 30 days before closing again.arrow_forward
- A component has a reliability that fits the exponential distribution. The Mean Time Between Failure for the component is 2500 cycles. What is the probability that the component will not fail before 7500 cycles? ( don't hand writing solution)arrow_forwardA product is composed of four parts. In order for the product to function properly in a given situation, each of the parts must function. Two of the parts have a 0.96 probability of functioning, and two have a probability of 0.99. (Leave your answers in 4 decimal places).arrow_forwardA system consists of three identical components. In order for the system to perform as intended, all of the components must perform. Each has the same probability of performance. If the system is to have a .92 probability of performing, what is the minimum probability of performing needed byeach of the individual components?arrow_forward
- The failure rate of an electronic system is 0.005 failures per hour and its time to failure can be modelled by an exponential distribution and the system will fail 50 hours mission,Calculate:(a)The reliability of the system. [10 Marks](b) The cumulative distribution function of the system. PLEASE ANSWER ALLarrow_forward0.855 1((1-0.645)x(1-0.800)) = 0.0710 1-0.0710 = 0.929 0.929 0.999 0.855 x 0.929 x 0.999 = 0.7935 Reliability of the system is 0.7935arrow_forwardA production line has three machines A, B, and C, with reliabilities of .90, 95, and .98, respectively. The machines are arranged so that if one breaks down, the others must shut down. Engineers are weighing two alternative designs for increasing the line's reliability. Plan 1 involves adding an identical backup line, and plan 2 involves providing a backup for each machine. In either case, three machines (A, B, and C) would be used with reliabilities equal to the original three. a. Compute overall system reliability under Plan 1. (Round your intermediate calculations and final answer to 4 decimal places.) b. Compute overall system reliability under Plan 2. (Round your intermediate calculations and final answer to 4 decimal places.) c. Which plan will provide the higher reliability?arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Practical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,
Practical Management Science
Operations Management
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:Cengage,