Textbook Question
Chapter 16, Problem 1CTE
One approach that can be effective in reducing the impact of production bottlenecks in a job shop or batch operations setting is to use smaller lot sizes.
a. What is the impact of a production bottleneck?
b. Explain how small lot sizes can reduce the impact of bottleneck operations.
c. What are the key trade-offs in using small lot sizes for the purpose of reducing the bottleneck effect?
d. In some cases, the location of a bottleneck will shift (i.e., sometimes it is at workstation 3, another time it is at workstation 12). Furthermore, there can be more than one bottleneck operation at the same time. How would these situations impact
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
The assembly department started the month with 468,000 units in
its beginning work in process inventory. An additional 1,524,000 units were transferred in from the prior department during the month to begin processing in the Assembly Department. There were 126,000 units in the ending work in process inventory of the Assembly Department. How many units were transferred to the next processing
department during the month?
a. 1,992,000 b. 1,992,000 c. 2,118,000 d. 1,866,000 e. 1,398,000 f. 1,182,000
The Assembly Department started the month with 37,000 units in its beginning work in process inventory. An additional units 482,000 were transferred in from the prior department during the month to begin processing in the Assembly Department. There were 34,000 units in the ending work in process inventory of the Assembly Department. How many units were transferred to the next processing department during the month?
A. none of the options
B. 485,000
C. 473,000
D. 479,000
1. Aljon, a softdrink dealer, delivers 14 cases on Monday, 10 cases on Tuesday, 12 cases on Wednesday, 15 cases on Thursday, 19 cases on Friday, and 20 cases on Saturday. How many cases are delivered on the average each day?
Chapter 16 Solutions
OPERATIONS MANAGEMENT W/ CNCT+
Ch. 16 - Why is scheduling fairly simple for repetitive...Ch. 16 - Prob. 2DRQCh. 16 - What are Gantt charts? How are they used in...Ch. 16 - Prob. 4DRQCh. 16 - Briefly describe each of these priority rules: a....Ch. 16 - Why are priority rules needed?Ch. 16 - What problems not generally found in manufacturing...Ch. 16 - Explain forward and backward schedulings and each...Ch. 16 - Prob. 9DRQCh. 16 - Prob. 10DRQ
Ch. 16 - Prob. 11DRQCh. 16 - What general trade-offs are involved in sequencing...Ch. 16 - Prob. 2TSCh. 16 - Prob. 3TSCh. 16 - One approach that can be effective in reducing the...Ch. 16 - Doctors and dentists offices frequently schedule...Ch. 16 - Prob. 3CTECh. 16 - Use the assignment method to determine the best...Ch. 16 - Rework Problem 1, treating the numbers in the...Ch. 16 - Assign trucks to delivery routes so that total...Ch. 16 - Develop an assignment plan that will minimize...Ch. 16 - Use the assignment method to obtain a plan that...Ch. 16 - The following table contains information...Ch. 16 - Using the information presented in the following...Ch. 16 - The following table shows orders to be processed...Ch. 16 - A wholesale grocery distribution center uses a...Ch. 16 - The times required to complete each of eight jobs...Ch. 16 - Prob. 11PCh. 16 - A shoe repair operation uses a two-step sequence...Ch. 16 - The following schedule was prepared by the...Ch. 16 - The production manager must determine the...Ch. 16 - A foreman has determined processing times at a...Ch. 16 - Given the information in the following table,...Ch. 16 - Given the following information on job times and...Ch. 16 - Prob. 18PCh. 16 - The following table contains order-dependent setup...Ch. 16 - The following table contains order-dependent setup...Ch. 16 - Prob. 21PCh. 16 - Given this information on planned and actual...Ch. 16 - Given the following data on inputs and outputs at...Ch. 16 - Determine the minimum number of workers needed,...Ch. 16 - Determine the minimum number of workers needed,...Ch. 16 - Determine the minimum number of workers needed,...Ch. 16 - Prob. 1CQ
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, operations-management and related others by exploring similar questions and additional content below.Similar questions
- Tuff-Rider, Inc., manufactures touring bikes and mountain bikes in a variety of frame sizes, colors, and component combinations. Identical bicycles are produced in lots of 90. The projected demand, lot size, and time standards are shown in the following table: LOADING... Item Touring Mountain Demand forecast 4,000 units/year 12,000 units/year Lot size 110 units 90 units Standard processing time 0.30 hour/unit 0.75 hour/unit Standard setup time 2 hours/lot 3 hours/lot The shop currently works 8 hours a day, 5 days a week, 50 weeks a year. It operates five workstations, each producing one bicycle in the time shown in the table. The shop maintains a 15 percent capacity cushion. How many workstations will be required next year to meet expected demand without using overtime and without decreasing…arrow_forward. Up, Up, and Away is a producer of kites and wind socks. Relevant data on a bottleneck operation in the shop for the upcoming fiscal year are given in the following table: Item Demand forecast Lot size Standard processing time Standard setup time Kites 30,000 units/year 20 units 0.3 hour/unit 3.0 hours/lot Wind Socks 12,000 units/year 70 units 1.0 hour/unit 4.0 hours/lot The shop works two shifts per day, 8 hours per shift, 200 days per year. Currently, the company operates four machines, and desires a 25 percent capacity cushion. How many machines should be purchased to eet the upcoming year's demand without resorting to any short-term capacity solutions?arrow_forwardK Up, Up, and Away is a producer of kites and wind socks. Relevant data on the bottleneck operation in the shop for the upcoming fiscal year are given in the following table: Item Demand forecast Lot size Standard processing time Standard setup time Kites 30,000 units/year 20 units 0.3 hour/unit 3.0 hours/lot Wind Socks 12,000 units/year 60 units 1.0 hour/unit 4.0 hours/lot The shop works two shifts per day, 8 hours per shift, 210 days per year. Currently, the company operates four machines, and desires a 25 percent capacity cushion. How many machines should be purchased to meet the upcoming year's demand without resorting to any short-term capacity solutions? The number of additional machines required is. (Enter your response rounded up to the next whole number.)arrow_forward
- Up, Up, and Away is a producer of kites and wind socks. Relevant data on the bottleneck operation in the shop for the upcoming fiscal year are given in the following table: Item Demand forecast Lot size Standard processing time Standard setup time Kites 30,000 units/year 25 units 0.3 hour/unit 3.0 hours/lot Wind Socks 10,000 units/year 70 units 0.5 hour/unit 4.0 hours/lot The shop works two shifts per day, 8 hours per shift, 210 days per year. Currently, the company operates four machines, and desires a 25 percent capacity cushion. How many machines should be purchased to meet the upcoming year's demand without resorting to any short-term capacity solutions? The number of additional machines required is. (Enter your response rounded up to the next whole number.)arrow_forwardUp, Up, and Away is a producer of kites and wind socks.Relevant data on a bottleneck operation in the shop for theupcoming fiscal year are given in the following table:Item Kites Wind SocksDemand forecast 30,000 units/year 12,000 units/yearLot size 20 units 70 unitsStandard processing time 0.3 hour/unit 1.0 hour/unitStandard setup time 3.0 hours/lot 4.0 hours/lotThe shop works two shifts per day, 8 hours per shift, 200 daysper year. Currently, the company operates four machines,and desires a 25 percent capacity cushion. How many ma-chines should be purchased to meet the upcoming year’s de-mand without resorting to any short-term capacity solutions?arrow_forwardC&A Furniture uses a four-step process to make its famous wood table: Processing Time Process Milling Table top Milling Table stand Assembly Finishing The milling machine requires a setup time of 30 minutes to make table tops and a changeover time of 30 minutes to make table stands. If the batch size is 10, what is the capacity of the process in tables per minute? A) 0.077 B) 0.05 C) 0.067 10 5 15 20 D) 0.048arrow_forward
- Up, Up, and Away is a producer of kites and wind socks. Relevant data on the bottleneck operation in the shop for the upcoming fiscal year are given in the following table Wind Socks 10,000 units/year Item Demand forecast Lot size Standard processing time Standard setup time Kites 32,000 units/year 25 units 0.4 hourlunit 3.0 hours/lot 70 units 0.8 hour/unit 40 hours/fol The shop works two shifts per day, 8 hours per shift, 210 days per year. Currently, the company operates four machines, and desires a 25 percent capacity cushion. How many machines should be purchased to meet the upcoming year's demand without resorting to any short-term capacity solutions? The number of additional machines required is (Enter your response rounded up to the next whole number)arrow_forwardWhich operation is the bottleneck of this process? a. Stocking b. Pricing c. Spotting d. Shipping e. Impossible to determinearrow_forwardRipeka, the warehouse manager at Hine would like to update the company’s inventory locator system so that the picking operation can be streamlined. While conceptually simple to do, she knows that there will be several steps to the update process that will have to be carefully managed. She needs to complete upgrade and train her staff in operating the new system before the busy season, which is only 4 months away. She identifies the various activities, expected time duration, predecessors and costs, as shown in the table. Identify the project cost. Ripeka is interested to complete the project three weeks early before starting the busy season. How much additional cost the project will incur for completing the project three weeks early?arrow_forward
- Ripeka, the warehouse manager at Hine would like to update the company’s inventory locator system so that the picking operation can be streamlined. While conceptually simple to do, she knows that there will be several steps to the update process that will have to be carefully managed. She needs to complete upgrade and train her staff in operating the new system before the busy season, which is only 4 months away. She identifies the various activities, expected time duration, predecessors and costs, as shown in the table. Draw the AON Network, and then determine the critical path. [Show your workings, using the grid network.] Identify the project duration – is this project feasible within the required timeframe?arrow_forwardOperation 1 Work Center A 2B 3 4 C D SE 5 Hourly Unit 70 80 100 50 Output Rate 60 60 Assuming that you need to have a 3 hour buffer quantity in front of the bottleneck work center, what is the buffer quantity?arrow_forwardThe following table contains order-dependent setup times for four jobs. For safety reasons, jobC cannot follow job A, nor can job A follow job C. Determine the processing sequence that willminimize the total setup time. (Hint: There are 12 alternatives.)Following Job’sSetup Time (hrs.)SetupTime (hrs.) A B C DPrecedingjobA 2 — 5 × 4B 1 7 — 3 2C 3 x 2 — 2D 2 4 3 6 —arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Practical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,
Practical Management Science
Operations Management
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:Cengage,
Inventory Management | Concepts, Examples and Solved Problems; Author: Dr. Bharatendra Rai;https://www.youtube.com/watch?v=2n9NLZTIlz8;License: Standard YouTube License, CC-BY