Contemporary Engineering Economics (6th Edition)
6th Edition
ISBN: 9780134105598
Author: Chan S. Park
Publisher: PEARSON
expand_more
expand_more
format_list_bulleted
Question
Chapter 16, Problem 13P
(a):
To determine
Selection of the alternate.
(b):
To determine
Selection of the alternate.
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
In a certain city the promotion of tourism in the city is being considered. It will cost $6,000 to develop the plan. The anticipated annual benefits and costs are as follows:
• Annual benefits: Increased local revenue and tax collection $117,400
• Annual support service: expansion of parking lots, restrooms, surveillance and street repairs $48,830 If the city government uses a discount rate of 10% and a study period of 5 years,
this tourism project is justifiable according to cost-benefit analysis?
IBM is considering an environmentally conscious green building at one of its new production facilities. The company will decide among three different green designs for the facility, and each of the final mutually exclusive concepts for the facility results in different costs and savings. These threeconcepts are summarized below. IBM uses 10% per year as its profitability benchmark (hurdle rate) for such comparisons. Which facility concept should be selected?
write complete solution
Chapter 16 Solutions
Contemporary Engineering Economics (6th Edition)
Knowledge Booster
Similar questions
- Focus on the difference between feasible alternatives. Insulated concrete forms (ICF) can be used as a substitute for conventional wood framing in building construction. Heating and cooling bills will be about 50% less than in a similar wood-framed building in upstate New York. An ICF home will be approximately 10% more expensive to construct than a wood-framed home. For a typical 2,000 ft2 home costing $120 per ft2 to construct in upstate New York and costing $200 per month to heat and cool, how many months does it take for a 2,000 ft2 ICF home to pay back its extraconstruction cost?arrow_forwardb) Kenya is in the advanced stages of preparing to manufacture COVID-19 vaccines locally. The Ministry of Health has identified a number of facilities all over the country for consideration for the manufacture of one or more of three vaccines; Johnson and Johnson (JJ), AstraZeneca (AZ) and Pfizer (PF). A feasibility study done by the ministry found out the following: 145 have capacity to manufacture JJ and PF 112 have capacity to manufacture JJ and AZ 156 have capacity to manufacture AZ and PF 321 have capacity to manufacture AZ 35 have no capacity to manufacture any of the three vaccines 79 have capacity to manufacture JJ and AZ but not PF The number that has capacity to manufacture JJ only is equal to those that have capacity to manufacture PF only. The number that has capacity to manufacture PF only is twice those that have capacity to manufacture AZ only Required (i) Present this information on a Venn diagram and hence determine the number of facilities…arrow_forwardFocus on the difference between feasible alternatives Insulated concrete forms (1CF) can be used as a substitute for conventional wood framing in building construction. Heating and cooling bills will be about 50% less than in a similar wood-framed building in upstate New York. An ICF home will be approximately 10% more expensive to construct than a wood-framed home. For a typical 2,300 ft^2 home costing $180 ft^2 to construct in upstate New York and costing $230 per month to heat and cool, how many months does it take for a 2,300 ft squared 2 ICF home to pay back its extra construction cost?arrow_forward
- Fisher Publishing Inc. is doing a financial feasibility analysis for a new book. Editing and preproduction costs are estimated at $45,000. The printing costs are a flat $7000 for setup plus $8.00 per book. The author's royalty is 8% of the publisher's selling price to bookstores. Advertising and promotion costs are budgeted at $8000. a. If the price to bookstores is set at $35, how many books must be sold to break even? (Round the answer up to the nearest whole number.) b. The marketing department is forecasting sales of 4800 books at the $35 price. What will be the net income from the project at this volume of sales?arrow_forwardFor the four alternatives described in the table, which project or projects should be selected, using ROR method and MARR of 13% ? (Use only capital letters for alternatives names exactly as in table. For Ai*, use number followed by % immediately (no space)) 1- if they are independents: 2- If they are mutually exclusive: fill in the steps below based on the comparison with MARR = 13% Step 1: Exclude alternative Overall Incremental Rate of Return, % ROR, % A from competition First Alternative Cost, $ B D -80.000 14 -60.000 16 12 Step 2: |(challenger) VS|| -40.000 17 11 14 17 23 D -30,000 12 35 (defender), Ai* = -----> select Step 3: ( challenger) VS (defender), Ai* = selectarrow_forwardA firm has a capital budget of $30,000 and is considering three possible independent projects. Project A has a present outlay of $12,000 and yields $4,231 per annum for 5 years. Project B has a present outlay of $10,000 and yields $4,184 per annum for 5 years. Project C has a present outlay of $17,000 and yields $5,802 per annum for 10 years. Funds which are not allocated to one of the projects can be placed in a bank deposit. Identify seven combinations of project investments and a bank deposits which exhaust the budget. Which of the above combinations should the firm choose when the bank deposit rate is (i) 15% or (ii) 20%? Explain your answer and show your work. Suppose there is no option to deposit in the bank, but the projects are "divisible" (e.g. you may have 25% of project A). Which combination should the firm choose? Explain your answer and show your work. Use 15% as the deposit rate (discount rate).arrow_forward
- Eaton Medical Services is evaluating 10 independent indivisible projects, all with positive NPV. The company's capital budgeting for the year is limited to a maximum of $5,000,000. (A) Use solver to find the optimum combination of projects the company should accept, under the assumption that A and B are mutually exclusive and one of them has to be selected. (B) Ignore the constraint from previous part, assume that project “I” has to be accepted. Use solver to find optimum combination of projects the company should accept now. Please show all steps to compute in excel using solver to get to the right answers. Thank you in advance, will upvote! Project Cost NPV A 1,061,191 122,737 B 561,758 58,102 C 1,647,849 280,660 D 1,026,020 89,365 E 191,870 17,568 F 1,333,625 76,960 G 3,102,642 123,240 H 275,568 79,367 I 2,044,070 60,506 J 1,017,567 56,690arrow_forwardanswer with cash flow diagramarrow_forwardhelp please answer in text form with proper workings and explanation for each and every part and steps with concept and introduction no AI no copy paste remember answer must be in proper format with all workingarrow_forward
- am. 135.arrow_forwardThe U.S. Department of Interior is planning to build a dam and construct a hydro- electric power plant. In addition to producing electric power, this project will provide flood control, irrigation, and recreational benefits. The estimated benefits and costs expected to be derived from the three alternatives under consideration are listed as follows:arrow_forwardThe annual benefits of $4,000 every year for three years may be obtained for an investment on a production equipment costing $20,000 with a salvage value of $5,000. If the interest rate is 6%, choose the right equation to determine the NPW. Group of answer choices NPW = -20,000 + 4,000(P/A, 6%, 3) + 5,000(P/F, 6%, 3) NPW = -20,000(P/F, 6%, 3) + 4,000(P/A, 6%, 3) + 5,000(P/F, 6%, 3) NPW = 20,000(F/P, 6%, 3) + 4,000(F/A, 6%, 3) + 5,000 NPW = 20,000(P/F, 6%, 3) + 4,000(F/A, 6%, 3) + 5,000arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Principles of Economics (12th Edition)EconomicsISBN:9780134078779Author:Karl E. Case, Ray C. Fair, Sharon E. OsterPublisher:PEARSONEngineering Economy (17th Edition)EconomicsISBN:9780134870069Author:William G. Sullivan, Elin M. Wicks, C. Patrick KoellingPublisher:PEARSON
- Principles of Economics (MindTap Course List)EconomicsISBN:9781305585126Author:N. Gregory MankiwPublisher:Cengage LearningManagerial Economics: A Problem Solving ApproachEconomicsISBN:9781337106665Author:Luke M. Froeb, Brian T. McCann, Michael R. Ward, Mike ShorPublisher:Cengage LearningManagerial Economics & Business Strategy (Mcgraw-...EconomicsISBN:9781259290619Author:Michael Baye, Jeff PrincePublisher:McGraw-Hill Education
Principles of Economics (12th Edition)
Economics
ISBN:9780134078779
Author:Karl E. Case, Ray C. Fair, Sharon E. Oster
Publisher:PEARSON
Engineering Economy (17th Edition)
Economics
ISBN:9780134870069
Author:William G. Sullivan, Elin M. Wicks, C. Patrick Koelling
Publisher:PEARSON
Principles of Economics (MindTap Course List)
Economics
ISBN:9781305585126
Author:N. Gregory Mankiw
Publisher:Cengage Learning
Managerial Economics: A Problem Solving Approach
Economics
ISBN:9781337106665
Author:Luke M. Froeb, Brian T. McCann, Michael R. Ward, Mike Shor
Publisher:Cengage Learning
Managerial Economics & Business Strategy (Mcgraw-...
Economics
ISBN:9781259290619
Author:Michael Baye, Jeff Prince
Publisher:McGraw-Hill Education