Contemporary Engineering Economics (6th Edition)
6th Edition
ISBN: 9780134105598
Author: Chan S. Park
Publisher: PEARSON
expand_more
expand_more
format_list_bulleted
Question
Chapter 16, Problem 10P
(a):
To determine
Selection of the alternate.
(b):
To determine
Selection of the alternate based on incremental value.
(c):
To determine
New selection of the alternate.
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
In a certain city the promotion of tourism in the city is being considered. It will cost $6,000 to develop the plan. The anticipated annual benefits and costs are as follows:
• Annual benefits: Increased local revenue and tax collection $117,400
• Annual support service: expansion of parking lots, restrooms, surveillance and street repairs $48,830 If the city government uses a discount rate of 10% and a study period of 5 years,
this tourism project is justifiable according to cost-benefit analysis?
A state is planning to construct a stretch of highway extending to 60 Kilometer.
The state signed a contract based on the BOT option (Build, Operate, and Transfer)
with a construction company. The construction company will finish the project in
two years (30 kilometers per year), after which it will operate the highway for
25 years. The company generates revenues by collecting a flat fees from the cars
using the highway. The following information is available:
Cost/Kilometer: 1,000,000 S
Number of cars using the highway: 500,000 car for the first year of usage,
then increase by 5% a year.
- Annual operation cost: 100,000 $ for the first year of usage, then increase by
10,000 $ every year.
The company's MARR is 8% per year.
Calculate the value of the fee charged/car so that the Net Present worth of the
project is 25,000,000 S.
help please answer in text form with proper workings and explanation for each and every part and steps with concept and introduction no AI no copy paste remember answer must be in proper format with all working
Chapter 16 Solutions
Contemporary Engineering Economics (6th Edition)
Knowledge Booster
Similar questions
- A public-private partnership has been formed between a city, county, and construction/management company to attract a professional athletic team to the area. Assume you are the engineer with the company and are assisting with the benefit/cost analysis. The primary options are to construct a domed arena (DA) or a conventional stadium (CS), one of which will definitely be built. The DA option will cost $200 million to construct, have a useful life of 50 years, and require M&O costs of $360,000 the first year, increasing by $10,000 per year thereafter. In 25 years, a remodeling expenditure of $4,800,000 is predicted. The CS option will cost only $50 million to construct, have a useful life of 50 years, and require M&O costs of $175,000 the first year, increasing by $8000 per year. Periodic costs for repainting and resurfacing for the stadium are estimated at $100,000 every 10 years, except in year 50. Revenue from DA is expected to be greater than that from CS by $10,900,000 the…arrow_forward1)what is the best project based on simple payback 2) What is the best project based on discounted payback 3)What is beta B/C ratio 4) What is gammas B/C ratioarrow_forwardPlease solve, show and explain steps. This is Engineering Economics.arrow_forward
- U.S. route 83 passes through the village of Burr Ridge, IL. The engineers of the Transportation Department have proposed constructing a new highway through existing farmland to bypass the city for use by through traffic. The new bypass would however entail an initial construction cost of $40 million and an average annual maintenance cost of $50,000. Assuming the overall user and non-user costs (associated with the positive and negative impacts) of the new project amount to $2 million per year, facility life of 25 years, and an annual nominal discount rate of 6% compounded quarterly, determine whether the project is worthwhile on the basis of agency costs, user costs, and non-user costs.arrow_forwardRecent development near Eugene, Oregon, has identified a need for improved access to Interstate 5 at one location. Civil engineers and public planners are considering three alternative access plans. Benefits are estimated for the public in general; disbenefits primarily affect some local proprietors who will see traffic pattern changes as undesirable. Costs are monetary for construction and upkeep, and savings are a reduction in cost of those operations today that will not be necessary in the future. All figures are relative to the present situation, retention of which is still an alternative, and are annualized over the 20-year planning horizon. Solve, a. What is the B/C ratio for each of these alternatives? b. Using incremental B/C ratio analysis, which alternative should be selected? c. Determine the value of B − C for each alternative.arrow_forward10. Calculate (a) the conventional B/C ratio, (b) the modified B/C ratio, and (c) the PI for the following cash flow estimates at a discount rate of 10% per year. a) 0.91, 0.72, 1.04 Item PW of benefits, S AW of disbenefits, S/year First cost, S M&O costs, S/year Life of project, years b) 1.04, 0.91, 1.21 c) 0.72, 0.91, 0.97 Cash Flow 3,800,000 45,000 1,200,000 300,000 20 d) 1.12, 1.26, 1.04 e) 1.15,0.98. 1.32arrow_forward
- In the table below presented the data on the investment in the renewable energy source (wind farm). This wind farm will be located in the scenic area (has a visual impact on the communities close by). Costs are estimated as follows: Construction cost = $750,000 Maintenance cost = $5,000 per year for the next 15 years Cost of dismantling at the end of 15-year lifespan = $35,000 Compensation for view loss = $25 annually per household for 2,000 household Benefits as follows: Market value of electricity = $150,000 per year Directions: 1. Construct the table for CBA analysis 2. Calculate present value (PV) of costs and benefits using the CBA table 3. Conduct a CBA test (as difference between present value of benefits and costs) 4. Make a decision on investment (Yes/No)arrow_forwardLet PW(A) be the present worth of investment alternative A, PW(B) be the present worth of investment alternative B, B/C(A) be the benefit-cost ratio for investment alternative A, and B/C(B) be the benefitcost ratio for investment alternative B. If PW(A) > PW(B) > $0, which of the following answers is correct? a) B/C(A) > B/C(B); b) B/C(A) > B/C(B) > 1.0; c) B/C(A) > 1.0 and B/C(B) > 1.0; d) insufficient information available to answerarrow_forwardFrom the following data for a PPP project, calculate the (a) conventional, and (b) modified benefit/ cost ratios using an interest rate of 6% per year and an infinite project period. To the People To the Government Benefits: $100,000 per year beginning now Costs: $1.8 million now and $200,000 every 3 years Disbenefits: $60,000 per year Savings: $90,000 per yeararrow_forward
- When a B/C analysis is conducted, the benefits and costs: (a) Must be expressed in terms of their present worth values (b) Must be expressed in terms of their annual worth values (c) Must be expressed in terms of their future worth values (d) Can be expressed in terms of PW, AW, or FWarrow_forwardAs part of the rehabilitation of the downtown area of a southern U.S. city, the Parks and Recreation Department expects to develop the space below several overpasses into basketball, handball, miniature golf, and tennis courts. The estimates are: initial cost of $190,000, life of 20 years, and annual M&O costs of $21,000. The department expects 20,000 people per year to use the facilities an average of 2 hours each. The value of the recre- ation has been conservatively set at $1.00 per hour. At a discount rate of 6% per year, what is the B/C ratio for the project? а. 1.06 b. 1.25 O c. 1.09 O d. 1.04arrow_forwardWhich of the following would be an advantage of using a Project Management software application (select all that apply): Learning curve Accuracy Speed False sense of security Ability to handle more complex projects What-if analysisarrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Principles of Economics (12th Edition)EconomicsISBN:9780134078779Author:Karl E. Case, Ray C. Fair, Sharon E. OsterPublisher:PEARSONEngineering Economy (17th Edition)EconomicsISBN:9780134870069Author:William G. Sullivan, Elin M. Wicks, C. Patrick KoellingPublisher:PEARSON
- Principles of Economics (MindTap Course List)EconomicsISBN:9781305585126Author:N. Gregory MankiwPublisher:Cengage LearningManagerial Economics: A Problem Solving ApproachEconomicsISBN:9781337106665Author:Luke M. Froeb, Brian T. McCann, Michael R. Ward, Mike ShorPublisher:Cengage LearningManagerial Economics & Business Strategy (Mcgraw-...EconomicsISBN:9781259290619Author:Michael Baye, Jeff PrincePublisher:McGraw-Hill Education
Principles of Economics (12th Edition)
Economics
ISBN:9780134078779
Author:Karl E. Case, Ray C. Fair, Sharon E. Oster
Publisher:PEARSON
Engineering Economy (17th Edition)
Economics
ISBN:9780134870069
Author:William G. Sullivan, Elin M. Wicks, C. Patrick Koelling
Publisher:PEARSON
Principles of Economics (MindTap Course List)
Economics
ISBN:9781305585126
Author:N. Gregory Mankiw
Publisher:Cengage Learning
Managerial Economics: A Problem Solving Approach
Economics
ISBN:9781337106665
Author:Luke M. Froeb, Brian T. McCann, Michael R. Ward, Mike Shor
Publisher:Cengage Learning
Managerial Economics & Business Strategy (Mcgraw-...
Economics
ISBN:9781259290619
Author:Michael Baye, Jeff Prince
Publisher:McGraw-Hill Education