The Code states that a means must be provided to disconnect an appliance. In the case of an electric clothes dryer, the disconnecting means can be (Circle the correct statemen(s).)
- a. a separate disconnect switch located within sight of the appliance.
- b. a separate disconnect switch located out of sight from the appliance. The switch is capable of being locked in the OFF position.
- c. a cord-and-plug-connected arrangement.
- d. a circuit breaker in a panel that is within sight of the dryer or capable of being locked in the OFF position.
Expert Solution & Answer
Trending nowThis is a popular solution!
Students have asked these similar questions
Lockout is required:
During servicing and maintenance where unexpected ener-
gization or start-up of equipment could harm employees.
During repair and replacement work, and during renovation
work.
a.
b.
C.
During modifications or other adjustments to powered
equipment.
d.
All of the above.
Lockout may involve:
Opening a disconnect switch.
b.
a.
Closing a valve.
Placing a block in the equipment.
d. All of the above.
C.
Lockout is the process ci
Shutting off a machine at the end of a shift.
Warning equipment operators about the risks involved in
bypassing a machine guard.
Preventing the flow of energy from a power source to a
piece of equipment, and keeping it from operating.
a.
b.
C.
d.
Preventing mechanics from starting repairs without the
machine operators' knowledge.
Tagout:
Serves as a warning.
b. Physically restrains a person from operating a power source.
Must be applied using specialized tagout tools.
a.
C.
d.
Must be worn like a badge by the employee who is doing
the repairs.…
18. A suitable disconnecting means for a fixed appliance is a
A. pigtail cord.
B.light switch that interrupts the hot wire.
C. circuit breaker.
D. two-pole switch that interrupts the common wire.
7. Which statement is true for the process-control relay ladder diagram shown in the figure?
A. The pressure switch, temperature switch, and push button must be closed for the motor to start.
B. With the temperature switch closed, the motor will start once the push button is pressed.
C. With the pressure switch closed and the push button released, the motor will start.
D. Only the temperature switch has to close for the motor to start.
Chapter 15 Solutions
EBK ELECTRICAL WIRING RESIDENTIAL
Ch. 15 - Prob. 1RCh. 15 - Prob. 2RCh. 15 - What special type of switch is controlling the...Ch. 15 - Prob. 4RCh. 15 - The total estimated volt-amperes for Circuit B10...Ch. 15 - If an attic is accessible through a scuttle hole,...Ch. 15 - Prob. 7RCh. 15 - Prob. 8RCh. 15 - The following is a layout of the lighting circuit...Ch. 15 - Prob. 10R
Ch. 15 - Prob. 11RCh. 15 - a. What is the minimum power demand allowed by the...Ch. 15 - What is the maximum permitted current rating of a...Ch. 15 - Prob. 14RCh. 15 - a. Must the metal frame of an electric clothes...Ch. 15 - An electric dryer is rated at 7.5 kW and 120/240...Ch. 15 - When a metal junction box is installed as part of...Ch. 15 - A residential air-conditioning unit is installed...Ch. 15 - The Code states that a means must be provided to...
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, electrical-engineering and related others by exploring similar questions and additional content below.Similar questions
- (b) () Discuss the cascade control scheme for a heat exchanger system with a neat diagram. (ii) List down any two merits and two demerits of a cascade control system over ratio control system.arrow_forwardDraw a control circuit with no-voltage protection. Describe how this method of wiring protects the machine operator.arrow_forwardHow would you use a " process of elimination " in a troubleshooting an air conditioning electrical system?arrow_forward
- Select all the basic methods of wiring electrical circuits. Transformer repass wiring PLC wiring Direct hard-wiring Remote wiring Hard-wiring using terminal strips arrow_forwardplease answer with explanation and dont copyarrow_forward3) 94 select the proper answer for the following: 1) The main processes that have the responsibility of arc initiation in the switching of the high voltage power system are: a) the field and thermal emissions b) the deionization of the arc path c) the photoionization and magnetic field emission 2) The dead tank term is used with: a) Bulk oil circuit breaker b) Minimum oil circuit breaker c) Air blast circuit breaker 3) The errors in the PTs can be minimized by: a) By providing a suitable turn ratio b) By increasing the winding resistance and reactance 2arrow_forward
- Please answer all questions , and give me a sample answers 1- What is done to prevent a plan from becoming confusing because of too much detail? 2. Does compliance with the NEC always result in an electrical installation that is adequate, safe, and efficient? Why? 3. Name two nationally recognized testing laboratories. 4- Are low-voltage systems totally safe? Explain 5- Explain briefly what an arc flash is 6- Where might you obtain information about on-the-job safety and safety training?arrow_forwardPart 2: Analysis and selection of the Wind Turbine.The team decides at install a 30 MW wind farm. The turbine that has been selected by the local contractor is an Enercon wind turbine. The specifications of all the available Enercon wind turbine is shown in the attached datasheet. 1. What are the two closed loop control systems that are used generally in wind turbines? How do they work? 2. Calculate the power density of the input power from the wind when the wind is blowing at the rated wind speed at the turbine height. Clearly show your steps in details.arrow_forwardschedules are typically provided to detail the circuits and overcurrent protection required for listribution equipment. Branch-circuit - Outlet C. d. ore distribution points for electrical in .... Switch Panelboardarrow_forward
- 5. What is the purpose of a starter? beearrow_forward2. Design a control and a power circuit ladder diagram while adhering the sequence of operation and figures below. a. Start the conveyor when the start button is momentarily pressed. Stop the conveyor when the stop button is momentarily pressed. b. c. Box moves to the position of the proximity sensor and automatically stops. Other auxiliary features include: A red pilot light to indicate the conveyor is stopped. • A green pilot light to indicate the conveyor is running. INDICATION PANEL RUN STOP BOX Proximity Switch Conveyor LOCAL CONTROL PANEL START Emergency STOP Motorarrow_forwardPlease dont copy from other sourcesarrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- EBK ELECTRICAL WIRING RESIDENTIALElectrical EngineeringISBN:9781337516549Author:SimmonsPublisher:CENGAGE LEARNING - CONSIGNMENTElectricity for Refrigeration, Heating, and Air C...Mechanical EngineeringISBN:9781337399128Author:Russell E. SmithPublisher:Cengage Learning
EBK ELECTRICAL WIRING RESIDENTIAL
Electrical Engineering
ISBN:9781337516549
Author:Simmons
Publisher:CENGAGE LEARNING - CONSIGNMENT
Electricity for Refrigeration, Heating, and Air C...
Mechanical Engineering
ISBN:9781337399128
Author:Russell E. Smith
Publisher:Cengage Learning
What is an electric furnace and how does it work?; Author: Fire & Ice Heating and Air Conditioning Inc;https://www.youtube.com/watch?v=wjAWecPGi0M;License: Standard Youtube License