Concept explainers
The central angles and the corresponding chord lengthsfor a compound curve which connects two tangents.

Answer to Problem 17P
For the first curve central angle and chord length is shown in table below,
Station | Deflection angle | Chord length |
| | |
| | |
| | |
| | |
| | |
| | |
| | |
For the second curve central angle and chord length is shown in table below,
Station | Deflection angle | Chord length |
| | |
| | |
| | |
| | |
Explanation of Solution
Given information:
Intersection angle
Angle of first deflection curve
Radius of first curve
Radius of second curve
PCC station
Calculation:
Deflection for second curve is given by,
Tangent length of first curve is given by,
Similarly tangent length for second curve is given by,
Length of first curve is given by,
Length of second curve is given by,
Station of first curve at PC is given by,
The station of PCis the point of curve according to the standards of AASHTOit is calculated by dividing the station when it reaches above
Station at point of tangency is given by,
For the first curve calculate degree of first curve is given by,
Deflection angle for first full station is given by,
Deflection angle is given by,
For the first curve chord length is given by,
Deflection angle for last full station is given by,
For the first curve central angle and chord length is shown in table below,
Station | Deflection angle | Chord length |
| | |
| | |
| | |
| | |
| | |
| | |
| | |
For the second curve calculate degree of second curve is given by,
Deflection angle for first full station is given by,
Deflection angle is given by,
For the second curve chord length is given by,
Deflection angle for last full station is given by,
For the second curve central angle and chord length is shown in table below,
Station | Deflection angle | Chord length |
| | |
| | |
| | |
| | |
Want to see more full solutions like this?
Chapter 15 Solutions
MindTap Engineering for Garber/Hoel's Traffic and Highway Engineering, 5th Edition, [Instant Access], 1 term (6 months)
- Determine forces in members BC, GF and CG and nature of forces 9 m D 4 m C 4m 500 F 4 kN 6 kN 4 m 3 m B3 G E Assignment-2 Aarrow_forwardFind forces in all members of the truss shown in Fig. Also find reactions at supports. 12 kN 20 kN ΙΟΧΟΙΟΙ 2 m 2 m 2 m 3 m C G E 4 m B Determine forces in members BC, GF and CG and nature of forces 9 m D 4 m C 4 m F 4 kN 6 kN 4 m 3 m B3 C E Assignment-2arrow_forwardPart 3: Problem-Solving. Solve the following problems. Show all calculations. 1. A retaining wall 5.80m high supports soil that has the following properties: Unit weight = 17.3 kN/m³ Angle of internal friction = 26 deg. Cohesion = 14.5 kPa a) Calculate the normal pressure acting at the back of the wall assuming no tensile crack occurs in the soil. b) Find the location of the tensile crack measured from the surface of horizontal backfill. c) Determine the active pressure acting on the wall in tensile crack occurs in the soil. 2. The soil material is supported by a retaining wall to a height of 6m. The unit weight of the soil is 16 kN/m³ and the angle of internal friction is 29 deg. Assume the soil is cohesionless. a) Determine the earth pressure on the wall. b) Find the total active pressure if surcharge of 14 kPa is applied on the surface of horizontal backfill. c) Locate the position of the total pressure from the bottom.arrow_forward
- Question 3 (20 points): The traffic volume on a 2-lane highway is 1600 veh/hr in each direction Page 3 of 6 with a density of 20 veh/mi. A large dump truck enters the traffic stream from an adjacent construction site at 20 mph and carries on this way for 2 miles before turning off to the dump site. Because flow is so high in the opposite direction, no one can pass the truck. As a result, traffic back up behind the truck at four times the density (i.e., 4x20 = 80 veh/mi) at a volume of 1000 veh/hr. How many vehicles get caught in the traffic congestion before the truck exits the highway?arrow_forwardHow can construction project managers find a balance between speeding up schedules and the risks of making more mistakes and needing rework, especially when using methods like fast tracking?arrow_forwardHelp i keep getting the wrong answer. So I must be doing something wrong.arrow_forward
- 6000 units have been installed to date with 9,000 units to install. Labor costs are $23,300.00 to date. What is the unit cost for labor to date?arrow_forwardThe base rate for labor is $15/hr. The labor burden is 35% and 3% for small tools for the labor. There are 1000 units to install. Records indicate that trade workers can install 10 units per hour, per trade worker. The owners need 15% overhead and profit to pay bills, pay interest on loan and provide some profit to the partners. What is the minimum bid assuming no risk avoidance factor?arrow_forwardCan you show me how to obtain these answers thanks, will rate!arrow_forward
- Traffic and Highway EngineeringCivil EngineeringISBN:9781305156241Author:Garber, Nicholas J.Publisher:Cengage Learning
