EBK PRINCIPLES OF OPERATIONS MANAGEMENT
11th Edition
ISBN: 9780135175859
Author: Munson
Publisher: VST
expand_more
expand_more
format_list_bulleted
Concept explainers
Question
Chapter 13, Problem 16P
Summary Introduction
To determine: The minimum cost using transportation method.
Introduction: Aggregate planning using transportation method helps to attain the minimum cost with the optimal plan. The major advantage of transportation method is to achieve the optimal solution using optimal plans.
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
A large St. Louis feed mill, Robert Orwig Processing,prepares its 6-month aggregate plan by forecasting demand for50-pound bags of cattle feed as follows: Ja nuary, 1,000 bags;February, I ,200; March, I ,250; April, 1,450; May, I ,400; and June,I ,400. The feed mill plans to begin the new year with no inventoryleft over from the previous year, and backorders a re not permitted.It projects that capacity (during regular hours) for p roducingbags of feed will remain constant at 800 until the end of April, andthen increase to 1,100 bags per month when a planned expansionis completed on May I. Overtime capacity is set at 300 bags permonth until the expansion, at which time it will increase to 400bags per month. A friendly competitor in Sioux City, Iowa, is a lsoavailable as a backup source to meet demand but can provideonly 500 bags total during the 6-month period. Develop a 6-monthproduction plan for the feed mill using the transportation method.
Wine Accessories Inc. (WAI) produces two models of corkscrews, the standard model and a deluxe model. WAI follows a level aggregate plan, producing 20,000 corkscrews per month, or 5000 corkscrews per week. Th e MPS is developed in weekly time periods. Th e forecasts for each model and the projected available are shown in the next two tables. Th e replenishment order quantity is 2000 units for the standard model and 1000 units for the deluxe model. Note that you can place multipleorders if a single order is insuffi cient to cover the forecast (you can produce 4000 units of the standard model if necessary, or 2000 or 3000 units of the deluxe model). Remember that total weekly production is limited to 5000 corkscrews. Develop an MPS for each of the products.
Electro Fans has j ust received an order for one thousand 20-inch fans d ue week 7. Each fan consists of a housing assembly, two grill s, a fan assembly, and an electrical unit.The housing assembly consists of a frame, two supports, and a handle. The fan assembly consists of a hub and five blades. The electrical unit consists of a motor, a switch, and a knob.The following ta ble gives lead times, on-hand inventory, and scheduled receipts.a) Construct a product structure.b) Construct a time-phased product structure.c) Prepare a net material requirements plan.
Chapter 13 Solutions
EBK PRINCIPLES OF OPERATIONS MANAGEMENT
Ch. 13 - Make the case for, and then against, this pricing...Ch. 13 - Prob. 1DQCh. 13 - Why are SOP teams typically cross-functional?Ch. 13 - Prob. 3DQCh. 13 - Prob. 4DQCh. 13 - Prob. 5DQCh. 13 - Prob. 6DQCh. 13 - Prob. 7DQCh. 13 - Prob. 8DQCh. 13 - Prob. 9DQ
Ch. 13 - Prob. 10DQCh. 13 - Prob. 11DQCh. 13 - Prob. 12DQCh. 13 - Prob. 13DQCh. 13 - Prob. 14DQCh. 13 - Prob. 1PCh. 13 - Prob. 2PCh. 13 - The president of Hill Enterprises, Terri Hill,...Ch. 13 - Prob. 4PCh. 13 - Prob. 5PCh. 13 - Prob. 6PCh. 13 - Consuelo Chua, Inc., is a disk drive manufacturer...Ch. 13 - Prob. 8PCh. 13 - Prob. 9PCh. 13 - Prob. 10PCh. 13 - Prob. 11PCh. 13 - Southeast Soda Pop, Inc., has a new fruit drink...Ch. 13 - Ram Roys firm has developed the following supply,...Ch. 13 - Jerusalem Medical Ltd., an Israeli producer of...Ch. 13 - Prob. 15PCh. 13 - Prob. 16PCh. 13 - Prob. 17PCh. 13 - Prob. 18PCh. 13 - Dwayne Cole, owner of a Florida firm that...Ch. 13 - Prob. 20PCh. 13 - Prob. 21PCh. 13 - Prob. 22PCh. 13 - Prob. 23PCh. 13 - Prob. 24PCh. 13 - Prob. 25PCh. 13 - Prob. 26PCh. 13 - Evaluate the various configurations of operating...Ch. 13 - Prob. 2CSCh. 13 - After researching revenue (yield) management in...Ch. 13 - The Magic used its original pricing systems of...Ch. 13 - Prob. 1.3VC
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, operations-management and related others by exploring similar questions and additional content below.Similar questions
- The Silver Star Bicycle Company will be manufacturing both men's and women's models of its Easy-Pedal 10-speed bicycles during the next two months. Management wants to develop a production schedule indicating how many bicycles of each model should be produced in each month. Current demand forecasts call for 150 men's and 125 women's models to be shipped during the first month and 200 men's and 150 women's models to be shipped during the second month. Additional data are shown: Production Labor Requirements (hours) Current Model Costs Manufacturing Assembly Inventory Men's $120 2.0 1.5 20 Women's $90 1.6 1.0 30 Last month the company used a total of 1000 hours of labor. The company's labor relations policy will not allow the combined total hours of labor (manufacturing plus assembly) to increase or decrease by more than 100 hours from month to month. In addition, the company charges monthly inventory at the rate of 2% of the production cost based on the inventory levels at the end of…arrow_forwardPrepare a master schedule based on the following information: Week 1 2 3 4 5 6 7 8 Forecast 500 500 600 600 750 750 900 800 Orders 540 470 325 200 105 45 10 0 Currently there are 700 units in inventory. Policy calls for a fixed order quantity of 1250 units. Can you receive another order for 250 items in week 1? Why? How many orders can be received in each period without altering the plan. If there are 1250 items in stock, what would be the answer of questions 2 and 3?arrow_forwardA phone production company must prepare the production planning for the next 9 weeks. Complete the below table considering this information: Lead Time = 3 Weeks On-hand inventory of 52 phones from week 1. Receipt from an outside supplier of 15 phones at start of week 7 We need to supply 75 phones on week 4. We need to supply 120 phones on week 9. Product A Week 1 2 3 4 5 6 7 8 9 Gross Requirement On-hand inventory Planned orderarrow_forward
- The president of Hill Enterprises, Terri Hill, projects the firm's aggregate demand requirements over the next 8 months as follows: January February March April Month 0 December 1 January 2 February 3 March 4 April 5 May 6 June 7 July 8 August Demand 1,400 1,500 1,600 1,800 2,100 2,300 1,400 1,500 1,600 1,800 Her operations manager is considering a new plan, which begins in January with 200 units of inventory on hand. Stockout cost of lost sales is $65 per unit. Inventory holding cost is $25 per unit per month. Ignore any idle-time costs. Evaluate the following plans D and E. Plan D: Keep the current workforce stable at producing 1,600 units per month. In addition to the regular production, another 20% of the normal production units can be produced in overtime at an additional cost of $50 per unit. A warehouse now constrains the maximum allowable inventory on hand to 600 units or less. Note: Do not produce in overtime if production or inventory are adequate to cover demand. 1,800 1,400…arrow_forwardAn end item’s demand forecasts for the next 10 weeks are30, 30, 30, 30, 20, 20, 30, 30, 30, and 30 units. The current on-hand inventory is 100 units. The order policy is to produce inlots of 75. The booked customer orders for the item, startingwith week 1, are 15, 38, 7, 5, 0, 3, 10, 0, 0, and 0 units. The leadtime is 2 weeks.a. Develop an MPS for this end item.b. The marketing department has received five orders forthis item in the following sequence:Order 1 is for 20 units to be delivered in period 1Order 2 is for 75 units to be delivered in period 4Order 3 is for 90 units to be delivered in period 6 Order 4 is for 75 units to be delivered in period 7Order 5 is for 90 units to be delivered in period 10 Assuming that the prospective MPS you developed in part (a)does not change, which orders would you be able to acceptbased on the available to promise (ATP)?arrow_forwardWormwood, Ltd., produces a variety of furniture products. The planning committee wants to prepare an aggregate plan for the next six months using the following information.Month1 2 3 4 5 6Demand 160 150 160 180 170 140CapacityRegular 150 150 150 150 160 160Overtime 10 10 0 10 10 10Cost Per UnitRegular time $50Overtime 75Subcontract 80Inventory holding, per month 4Subcontracting can handle a maximum of 10 units per month. Beginning inventory is zero.Develop a plan that minimizes total cost. No back orders are allowed. Regular capacity = Regularproduction.arrow_forward
- 3. The MPS planner at Murphy Motors uses MPS time-phased records for planning end-item pro- duction. The planner is currently working on a schedule for the P24, one of Murphy's top-selling motors. The planner uses a production lot size of 70 and a safety stock of 5 for the P24 motor. Item: P24 Forecast Orders On hand Week 12345678 30 30 30 40 40 40 45 45 13 8 4 Projected available balance Available-to-promise MPS 20 a. Complete the MPS time-phased record for product P24. b. Can Murphy accept the following orders? Update the MPS time-phased record for accepted orders. Order 1234 4 Amount 40 30 30 25 Desired Week 4 6 2 3arrow_forwardAggregate Planning and Master Scheduling Planners of the company are about to prepare the aggregate plan that will cover 6 months. Assuming that the company identified the following forecast for the next 6 months: Period Jan Feb March April May June Forecast 270000 275000 245000 255000 335000 270000 They now want to evaluate a plan that calls for a steady rate of regular output (250000 boxes/month). Mainly using inventory, regular time and overtime, and backorders. They intend to start with zero inventory on hand in the first period. The maximum amount of overtime output per period is 30,000 box per month. The regular production cost per box is 30 LE while the overtime cost per box is 35 LE. The holding cost is 5 LE per box per month and the backorder cost is 10 LE per box per month. Then, prepare a master schedule to identify the available to promise amounts, knowing that the policy calls for a fixed order quantity of 350000 units, and currently there are 276000 units in inventory. 5…arrow_forwardVT Company produces lawn movers and leaf blowers. The company must develop an aggregate plan given the forecast for engine demand shown in the table. The department has a regular output capacity of 150 engines per month. Regular output has a cost of RM55 per engine. The beginning inventory is zero engines. Overtime has a cost of RM80 per engine. Month 2 3 4 7 8 Total Forecast 125 135 140 120 125 125 135 135 1,040 Develop an aggregate plan that matches the forecast and compute the total cost of your plan. Regular production can be less than regular capacity. Explain your plan.arrow_forward
- 16. Complete the following schedule and then answer Problems 16 and 17. Forecast requirements In transit On Hand 1 35 50 Projected available balance 30 Planned Shipments Shipping quantity = 50, Lead time = 1, Safety stock = 25 2 30 Period 3 45 What will the planned shipments be for periods 2, 3, and 4? a) 25 units for each period b) 50 units for periods 2 and 4; zero units for period 3 4 65 c) 50 units for each period d) 100 units in period 2, zero units in period 3, and 50 units in period 4 e) 75 units in period 2, 35 units in period 3, 20 units in period 4 17. What is the projected available balance for period 4? a) 50 units b) 55 units c) 60 units d) 65 units e) 75 units 5 30arrow_forwardPennington Cabinets is a manufacturer of several different lines of kitchen and bathroom cabinets that are sold through major home improvement retailers. Pennington built material requirement planning as follows: Current Jan Feb Mar Gross requirements 1100 1150 Scheduled receipts 810 Projected available balance 750 Net requirements Planned order receipts Planned order release Compute planned order receipts in Mar, assuming that minimum lot size is 1.arrow_forwardSilver Star Bicycle Company will be manufacturing both men’s and women’s models of its Easy-Pedal bicycles during the next two months. Management wants to develop a production schedule indicating how many bicycles of each model should be produced in each month. Current demand forecasts call for 150 men’s and 125 women’s models to be shipped during the first month and 200 men’s and 150 women’s models to be shipped during the second month. Additional data are shown: Model Production Costs Current Inventory Men’s $120 20 Women’s 90 30 The company charges monthly inventory at the rate of 2% of the production cost based on the inventory levels at the end of the month. The company would like to have at least 25 units of each model in inventory at the end of the two months. Formulate this problem as a linear programming model so that a production schedule can be established in order to minimize production and inventory costs and satisfies the labor-smoothing,…arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Practical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,
Practical Management Science
Operations Management
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:Cengage,
Inventory Management | Concepts, Examples and Solved Problems; Author: Dr. Bharatendra Rai;https://www.youtube.com/watch?v=2n9NLZTIlz8;License: Standard YouTube License, CC-BY