Question
Chapter 13, Problem 16P
a)
Summary Introduction
To determine: The machine and labor capacity requirement and total load.
Introduction: Capacity utilization refers to the effective use of the resource or the supply. It is the action of practically using the available materials.
b)
Summary Introduction
To determine: The feasibility of the schedule and evaluate the projected loading for first three days of the week.
Introduction: Capacity utilization refers to the effective use of the resource or the supply. It is the action of practically using the available materials.
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
The assembly department started the month with 468,000 units in
its beginning work in process inventory. An additional 1,524,000 units were transferred in from the prior department during the month to begin processing in the Assembly Department. There were 126,000 units in the ending work in process inventory of the Assembly Department. How many units were transferred to the next processing
department during the month?
a. 1,992,000 b. 1,992,000 c. 2,118,000 d. 1,866,000 e. 1,398,000 f. 1,182,000
Following are products required for 22days period for 8 hours a day working hour. Product A = 12000 Product B = 8000 Product C = 6000 Produce levelled scheduling with small batch size.
Show the calculation
Product PI is made of one unit of sub assembly A and four
units of sub assembly B. Sub assembly A is made of 4 units
of component X while sub assembly B is made of 2 units of
X. one unit of Y and 3 units of Z. The manufacturing lead
times PI, A, B, X, Y and Z are 1, 1, 1, 4, 6 and 1 (week)
respectively. The lead time for delivery of PI in weeks
is
Chapter 13 Solutions
OPERATIONS MANAGEMENT >C<
Ch. 13.11 - What is ERP?Ch. 13.11 - What are the three main reasons firms adopt ERP?Ch. 13.11 - What are some hidden costs of ERP?Ch. 13.11 - How does ERP fit with e-commerce and supply chain...Ch. 13 - Contrast independent and dependent demand.Ch. 13 - When is MRP appropriate?Ch. 13 - Briefly define or explain each of these terms: a....Ch. 13 - Prob. 4DRQCh. 13 - Prob. 5DRQCh. 13 - What is meant by the term safety time?
Ch. 13 - Prob. 7DRQCh. 13 - Briefly discuss the requirements for effective...Ch. 13 - Prob. 9DRQCh. 13 - How can the use of MRP contribute to productivity?Ch. 13 - Prob. 11DRQCh. 13 - What is lot sizing. what is its goal, and why is...Ch. 13 - Contrast planned-order receipts and scheduled...Ch. 13 - If seasonal variations are present, is their...Ch. 13 - Prob. 15DRQCh. 13 - What are some unforeseen costs of ERP?Ch. 13 - What trade-offs are involved in the decision to...Ch. 13 - Who in the organization needs to be involved in...Ch. 13 - Prob. 3TSCh. 13 - Prob. 1CTECh. 13 - Give one example of unethical behavior involving...Ch. 13 - a. Given the following diagram for a product,...Ch. 13 - Prob. 2PCh. 13 - Prob. 3PCh. 13 - Eighty units of end item E are needed at the...Ch. 13 - a. One hundred twenty units of end item Z are...Ch. 13 - A table is assembled using three components, as...Ch. 13 - Eighty units of end item X are needed at the...Ch. 13 - Oh No!, Inc., sells three models of radar detector...Ch. 13 - Assume that you are the manager of a shop that...Ch. 13 - Assume that you are the manager of Assembly, Inc....Ch. 13 - Determine material requirements plans for pans N...Ch. 13 - A firm that produces electric golf carts has just...Ch. 13 - Refer to Problem 12. Assume that unusually mild...Ch. 13 - Using the accompanying diagram, do the following:...Ch. 13 - A company that manufactures paving material for...Ch. 13 - Prob. 16PCh. 13 - The MRP Department has a problem. Its computer...Ch. 13 - Develop a material requirements plan for component...Ch. 13 - How many wheels sets should the manager order?Ch. 13 - When should the wheel sets be ordered?Ch. 13 - Prob. 2.1CQCh. 13 - Prob. 1OTQCh. 13 - Prob. 2OTQCh. 13 - Suppose the company has just received an order for...Ch. 13 - Prob. 4OTQCh. 13 - Prob. 5OTQ
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, operations-management and related others by exploring similar questions and additional content below.Similar questions
- EU Company manufactures two different types of life vests (A and B) that are manufactured and assembled on three different workstations (W, X, and Y) using a small-batch process (see Figure 1). Batch setup times are negligible. The flowchart denotes the path each product follows through the manufacturing process, and each product’s price, demand per week, and processing times per unit are indicated as well. Purchased parts and raw materials consumed during production are represented by inverted triangles. EU can make and sell up to the limit of its demand per week; no penalties are incurred for not being able to meet all the demand. Each workstation is staffed by a worker who is dedicated to work on that workstation alone and is paid $6 per hour for an entire week, regardless of how much the worker is used. Total labor costs per week are fixed. Variable overhead costs are $1,500/week. The plant operates one 8-hour shift per day, or 40 hours/week. Which of the three workstations, W,…arrow_forwardYost-Perry Industries (YPI) manufactures a mix of affordable guitars (A, B, C) that are fabricated and assembled at four different processing stations (W, X, Y, Z). The operation is a batch process with small setup times that can be considered negligible. The product information (price, weekly demand, and processing times) and process sequences are shown below. Purchased parts and raw materials (shown as a per-unit consumption rate) are represented by inverted triangles. YPI is able to make and sell up to the limit of its demand per week with no penalties incurred for not meeting the full demand. Each workstation is staffed by one highly skilled worker who is dedicated to work on that workstation alone and is paid $15 per hour. The plant operates one 8-hour shift per day and operates on a 5-day work week (i.e., 40 hours of production per person per week). Overhead costs are $9,000/week. Product A 7 $11 Step 1 Station W (11 min) Raw materials Product B $8 Raw materials Product C $14,…arrow_forwardYost-Perry Industries (YPI) manufactures a mix of affordable guitars (A, B, C) that are fabricated and assembled at four different processing stations (W, X, Y, Z). The operation is a batch process with small setup times that can be considered negligible. The product information (price, weekly demand, and processing times) and process sequences are shown below. Purchased parts and raw materials (shown as a per-unit consumption rate) are represented by inverted triangles. YPI is able to make and sell up to the limit of its demand per week with no penalties incurred for not meeting the full demand. Each workstation is staffed by one highly skilled worker who is dedicated to working on that workstation alone and is paid $15 per hour. The plant operates one 8-hour shift per day and operates on a 5-day work week (i.e., 40 hours of production per person per week). Overhead costs are $9,000/week. Workstation W, with a total load time of ____ minutes. (Enter your response as an integer.)arrow_forward
- Yost-Perry Industries (YPI) manufactures a mix of affordable guitars (A, B, C) that are fabricated and assembled at four different processing stations (W, X, Y, Z). The operation is a batch process with small setup times that can be considered negligible. The product information (price, weekly demand, and processing times) and process sequences are shown below. Purchased parts and raw materials (shown as a per-unit consumption rate) are represented by inverted triangles. YPI is able to make and sell up to the limit of its demand per week with no penalties incurred for not meeting the full demand. Each workstation is staffed by one highly skilled worker who is dedicated to work on that workstation alone and is paid $15 per hour. The plant operates one 8-hour shift per day and operates on a 5-day work week (i.e., 40 hours of production per person per week). Overhead costs are $9,000/week.…arrow_forwardYost-Perry Industries (YPI) manufactures a mix of affordable guitars (A, B, C) that are fabricated and assembled at four different processing stations (W, X, Y, Z). The operation is a batch process with small setup times that can be considered negligible. The product information (price, weekly demand, and processing times) and process sequences are shown below. Purchased parts and raw materials (shown as a per-unit consumption rate) are represented by inverted triangles. YPI is able to make and sell up to the limit of its demand per week with no penalties incurred for not meeting the full demand. Each workstation is staffed by one highly skilled worker who is dedicated to working on that workstation alone and is paid $15 per hour. The plant operates one 8-hour shift per day and operates on a 5-day work week (i.e., 40 hours of production per person per week). Overhead costs are $9,000/week. Which of the four workstations, W, X, Y, or Z has the highest aggregate workload, and thus…arrow_forwardFurniture Face Lift refinishes old wood furniture. Their process for refinishing chairs has 9 workers and 4 stations. Each chair starts at the Stripping station, then goes to Priming, then to Painting and finally to Inspection. Where there are multiple workers within a station, each worker works independently on his/her own chair. Assume inventory buffers are allowed between each station. Station Staffing Processing time (hours per chair per worker) Stripping 3 2.5 Priming 2 1.5 Painting 3 1.75 Inspection 1 0.8 A truck loaded with 10 chairs arrives. How many hours will it take them to complete these 10 chairs?(The accuracy should be of two digits after the decimal places.)arrow_forward
- 1. Aljon, a softdrink dealer, delivers 14 cases on Monday, 10 cases on Tuesday, 12 cases on Wednesday, 15 cases on Thursday, 19 cases on Friday, and 20 cases on Saturday. How many cases are delivered on the average each day?arrow_forward2)The castings need to be started in week ? (enter your response as a whole number).arrow_forwardboxes) that are manufactured and assembled on three different workstations (W, X, and Y) using a small-batch process (see the figure below). Batch setup times are negligible. The flowchart denotes the path each product follows through the manufacturing process, and each product's price, demand per week, and processing times per unit are indicated as well. Purchased parts and raw materials consumed during production are represented by inverted triangles. CKC can make and sell up to the limit of its demand per week; no penalties are incurred for not being able to meet all the demand. Each workstation is staffed by a worker who is dedicated to work on that workstation alone and is paid $6 per hour. Total labor costs per week are fixed. Variable overhead costs are $3,500/week. The plant operates one 8-hour shift per day, or 40 hours/week. Q Product A $2 Step 1 Station W Step 2 Station X (11 min) (11 min) Step 3 Station Y (17 min) Product: A Price: $55/unit Demand: 95 units/wk Raw materials…arrow_forward
- If the firm adopts a make to order approaches the customer’s lead time is?arrow_forwardThe Assembly Department started the month with 37,000 units in its beginning work in process inventory. An additional units 482,000 were transferred in from the prior department during the month to begin processing in the Assembly Department. There were 34,000 units in the ending work in process inventory of the Assembly Department. How many units were transferred to the next processing department during the month? A. none of the options B. 485,000 C. 473,000 D. 479,000arrow_forwardThe master production schedule (MPS) specifies: Select one: None of the mentioned When the finished products are needed All of the mentioned. When the subcomponents are needed Which subcomponents a firm is to produce How many subcomponents are needed. Mit Carrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Practical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,
Practical Management Science
Operations Management
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:Cengage,