Question
Chapter 12, Problem 16P
To determine
The estimation of tonnage of lumber that will travel between the three states.
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
Example:
The total number of vehicles in each month are given in the table below.
Find:-
い
همر المرسر لت
1- ADT for each month
2- AADT
365
Month
1
3
4
8
10
12
28
ADT
Total
No. of
no. of vehicles (×1000)
(00 x pda)
425
days
13.7
31
14.6
410
12.4
385
30
13.2
31
14.5
450
16.6
31
18.7
31
18.3
570
16.3
31
13.5
420
31
13.8
415
30
12.9
31
Sum
An excursion bus has 12 married couples passenger. Eight couples brought no children while 4 of them brought 3 children a piece. Including the driver, the bus has 27 passengers. How many married children ( couple ) are there?
Select one:
a. 4
b. 5
c. 3
d. 0
Estimate the daily demand (DD) in (L/day) for a city of 5.2 x 106 persons, if average daily flow = Qave = 225 Lpcd,
Maximum Daily Demand = Qmax =1.8 Qave:
%3D
Select one:
O a. 117000000 L/day
O b. 2270000000 L/day
O c. 11700000 L/day
O d. 1170000000 L/day
Next page
er (3) = Water Supply and
Jump to...
Water Treatment
2)
Chapter 12 Solutions
Traffic And Highway Engineering
Ch. 12 - Prob. 1PCh. 12 - Prob. 2PCh. 12 - Prob. 3PCh. 12 - Prob. 4PCh. 12 - Prob. 5PCh. 12 - Prob. 6PCh. 12 - Prob. 7PCh. 12 - Prob. 8PCh. 12 - Prob. 9PCh. 12 - Given a table with production and attraction data,...
Ch. 12 - Given a table with production and attraction data,...Ch. 12 - Prob. 12PCh. 12 - Prob. 13PCh. 12 - Prob. 14PCh. 12 - Prob. 15PCh. 12 - Prob. 16PCh. 12 - Prob. 17PCh. 12 - Prob. 18PCh. 12 - Prob. 19PCh. 12 - Prob. 20PCh. 12 - Prob. 21PCh. 12 - Prob. 22PCh. 12 - Prob. 23PCh. 12 - Prob. 24PCh. 12 - Prob. 25PCh. 12 - Prob. 26PCh. 12 - Prob. 27PCh. 12 - Prob. 28P
Knowledge Booster
Similar questions
- The daily counts of the current traffic volume for a rural highway for one week of May 2000 are as shown in the following table: Sat. Sun. Mon. Tues. Wed. Thur. Fri. Day Daily volume 12000 12500 10500 11500 9500 9000 8500 The traffic is composed of 70% passenger car, 20% bus, 10% truck. The percent of future traffic to current traffic is predicted to be 180% up to May 2020. Determine the required number of lanes for this highway if the lane capacity is 1300 pc/hr.arrow_forwardto no congestion on the road further downstream of the railway grade crossing. QUESTION 5: Consider trip distribution within 5 zones in an area. The total trip production from zone 1 is 1000. The travel times from zone 1 to zones 2, 3, 4 and 5 are 5, 10, 20, and 30 minutes, respectively. The trip attraction to zones 2, 3, 4 and 5 are 50, 200, 75, and 450, respectively. Assume that the number of trips produced from zone 1 to zones 2, 3, 4 and 5 is inversely proportional to the inter-zonal travel time. (a) Estimate the number of trips from zone 1 to zones 2, 3, 4 and 5 using the gravity model. (b) Assume that the future trip production from zone I will increase to 1,250 and the future trip attraction to zones 2, 3, 4 and 5 will increase to 100, 225, 100, and 600, respectively. Predict the number of trips from zone 1 to zones 2, 3, 4 and 5. The inter-zonal travel times remain the same. (c) Compare the number of trips from zone 1 to each destination zone between (a) and (b). Identify the…arrow_forwardVehicles arrive to a bridge at a rate of 24 vehicles per minute. The capacity of the bridge is typically 3000 veh/hour, but is reduced to 941 veh/hour for 12 minutes. What is the duration of the queue that forms on the bridge in minutes? Answer 15.8 minsarrow_forward
- 16arrow_forwardQ3) A manufacturing plant is to be constructed A manufacturing plant is to be constructed in the city of Ankara, in order to provide a faster service to its major customers in the surrounding area. There are three possible locations the company is considering. The distances (in km) from these three locations to the four major customers are listed in the table below. The transportation cost is approximately 1.00 TL/km. The annualized fixed cost of constructing the plant and the customers' demand (number of trips required per year) are also given in the table. Find the best location for this plant.arrow_forwardI need the carrect answer as soon as possible pleasearrow_forward
- Compute the annual ESAL for the traffic summarized in the table below, using the fourth power formula and assuming 350 days per year to compensate for reduced traffic on weekends. Weekday Traffic Data Truck Gross Weight Average (lbs) 20,000-40,000 40,100-66,000 66,100-80,000 80,100-110,000 Load on Steering Axle Load Distribution (Front/Rear) Number of Trucks 32,000 58,000 76,000 108,000 Weight (lbs) 3-Axle, All Single equal load singles front, -S2 for one tandem for the rear, -2 for two equal load singles for the trailer) 200 0 0 Trailer 5-Axle, 3-S2 Semi 5-Axle, 3-S2-2 Semi + (3 for one steering (3 for one steering single single and two and two equal load for the 8,000 lbs. Equal for the front, -S2 for one tandem for the rear) 330 800 800 300 12,000 lbs. 60/40 380 320 350 360 14,000 lbs. 30/30/20/20arrow_forwardDefine the following terms and cite examples of how they are used: 1. Peak hour volume (PHV)arrow_forwardA neighborhood has 180 households with the characteristics shown in the table below. A count model for peak-hour work trips is described in the second table. How many trips do you expect from this neighborhood?arrow_forward
- A bridge has been constructed between the mainland and an island. The total cost (excluding tolls) to travel across the bridge is expressed as C- 50 + 0.5V, where V is the number of veh/hr and Cis the cost/vehicle in cents. The demand for travel across the bridge is V- 2500 - 10C. (a) Determine the volume of traffic across the bridge. (b) If a toll of 25 cents is added, what is the volume across the bridge? What volume would be expected with a 50 cent increase? 155 (c) A tollbooth is to be added, thus reducing the travel time to cross the bridge. The new cost function is C- 50 + 0.2V. Determine the volume of traffic that would cross the bridge. (d) Determine the toll to yield the highest revenue for demand and supply function in part (a), and the associated demand and revenuearrow_forwardAnswer b.arrow_forwardAn airport runway accommodates 18 arrival flights in an hour and departure flights occur every 2.1429 minutes during normal weather season. During holidays, arrival flights are increase to 24 but on bad weather conditions, departure flights is changed to 2.727 minutes due to a decline in flight departures. Determine the queueing characteristics of the airport during these conditions.arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Traffic and Highway EngineeringCivil EngineeringISBN:9781305156241Author:Garber, Nicholas J.Publisher:Cengage LearningSolid Waste EngineeringCivil EngineeringISBN:9781305635203Author:Worrell, William A.Publisher:Cengage Learning,
Traffic and Highway Engineering
Civil Engineering
ISBN:9781305156241
Author:Garber, Nicholas J.
Publisher:Cengage Learning
Solid Waste Engineering
Civil Engineering
ISBN:9781305635203
Author:Worrell, William A.
Publisher:Cengage Learning,