Engineering Economy, Student Value Edition (17th Edition)
17th Edition
ISBN: 9780134838137
Author: William G. Sullivan, Elin M. Wicks, C. Patrick Koelling
Publisher: PEARSON
expand_more
expand_more
format_list_bulleted
Question
Chapter 11, Problem 8P
To determine
Select the alternative.
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
The ford motor company is considering three mutually exclusive electronic stability control systems for protection against rollover of its automobiles. The investment (study) period is four years, and MARR is 12% per year. Data for the fixture costs of the systems are as follows:
plot the AW of each alternative against MARR as the MARR varies across this range:4%, 8%, 12%, 16%, and 20%. What can you generalize about the range of the MARR for which each alternative is preferred?
Bennington Health purchased three dialysis systems each at an installed cost of $100,000 for different locations in the city. The AOC
over 2 years varied as shown. (All values are costs.) The load factor in terms of percentage of clients at each location is shown in
decimal form. Find the expected AW of costs for each location at /= 15% per year.
Location
Load
Year
0
1
2
North (N)
0.50
100,000
20,000
11,000
South (S)
0.35
AOC, $ per year
100,000
15,000
12,000
The expected AW of costs for each location is $
West (W)
0.15
100,000
12,000
8,000
Evaluate a combined cycle power plant on the basis of the Present Worth Method (PW) when MARR is 12 % per year.Pertinent cost data are as follows:
(Power Plant (thousands of $)
Investment Cost: $12693
Useful life: 15 ears
Market Value (EOY 15) $3,000
Annual Operating expenses: $1,000
Overhaul cost-end of 5th year: $1897
Overhaul cost-end of 10th year. $1819
Chapter 11 Solutions
Engineering Economy, Student Value Edition (17th Edition)
Ch. 11 - Prob. 1PCh. 11 - Refer to Example 11-2. Assuming gasoline costs...Ch. 11 - Prob. 3PCh. 11 - Prob. 4PCh. 11 - Prob. 5PCh. 11 - Prob. 6PCh. 11 - Prob. 7PCh. 11 - Prob. 8PCh. 11 - Prob. 9PCh. 11 - Prob. 10P
Ch. 11 - Prob. 11PCh. 11 - Prob. 12PCh. 11 - Prob. 13PCh. 11 - Prob. 14PCh. 11 - Prob. 15PCh. 11 - Prob. 16PCh. 11 - Prob. 17PCh. 11 - Prob. 18PCh. 11 - Prob. 19PCh. 11 - A bridge is to be constructed now as part of a new...Ch. 11 - An aerodynamic three-wheeled automobile (the Dart)...Ch. 11 - Prob. 23PCh. 11 - Prob. 24SECh. 11 - Prob. 25SECh. 11 - Prob. 26SECh. 11 - Prob. 27SECh. 11 - Prob. 28SECh. 11 - Prob. 29SECh. 11 - Prob. 30FECh. 11 - Prob. 31FECh. 11 - A supermarket chain buys loaves of bread from its...Ch. 11 - A supermarket chain buys loaves of bread from its...Ch. 11 - Prob. 34FECh. 11 - Prob. 35FECh. 11 - Prob. 36FECh. 11 - Prob. 37FECh. 11 - Prob. 38FECh. 11 - Prob. 39FECh. 11 - Prob. 40FECh. 11 - Prob. 41FECh. 11 - Prob. 42FE
Knowledge Booster
Similar questions
- Decision D6, which has three possible choices (X, Y, or Z), must be made in year 3 of a 6-year study period in order to maximize EPW). Using an MARR of 16% per year, the investment required in year 3, and the estimated cash flows for years 4 through 6, determine which decision should be made in year 3. High Low High Y D6 Low High Low Investment, Cash Flow, (Year Cash Flow, $1000 3) Cash Flow, $1000 (Year 6) Cash Flow, Outcome Year 3 (Year 4) $1000 (Year 5) Probability 3 High (X) $-190,000 $50 $50 $50 0.58 $40 Low (X) High (Y) Low (Y) High (Z) Low (Z) $30 $40 $30 $170 $-30 $20 $50 $30 $150 $-30 0.42 $-54,000 $30 $30 $190 $-30 0.45 0.55 $-240,000 0.7 0.3 The present worth of X is $ [ The present worth of Y is $ The present worth of Z is $ Select decision branch Yarrow_forwardProvide answer in whole numbers, no comma, no units. (Example: Php 123,456.78 --> 123457) Estimates for one of two process upgrades are as follows: First Cost = Php 40,000 Annual Cost = Php 5,000 Market Value = (-)Php 2,000/ year Salvage Value = Php 20,000 after 10 years. If a 4-year study period is used for AW analysis at 15% per year, what is the AW value? Your answerarrow_forwardEvaluate a combined cycle power plant on the basis of the FW method when the MARR is 18% per year. Pertinent cost data are as follows:arrow_forward
- J. Doe must choose between two different models. The analysis period considered is 6 years. Model 1 has a life of four years with a first cost of $13,500 and maintenance costs of $1,250 per year in years 2, 3, and 4 (no maintenance costs in year 1). The salvage value for this model at the end of its life is $4,271 (For year 2 the salvage value is $7,594). Model 2 has a life of three years with a first cost of $15,000 and maintenance costs of $700 per year. Its salvage value at the end of its life is $9,300 (year 3). Which of the two models should be chosen by J. Doe if considering a MARR of 12%.arrow_forwardEvaluate a combined cycle power plant on the basis of the PW method when the MARR is 18% per year. Pertinent cost data are as follows: Investment cost Useful life Market value (EOY 15) Annual operating expenses Annual expenses Overhaul cost-end of 5th year Overhaul cost-end of 10th year Power Plant (thousands of Php) Php 1,100,000 15 years Php 500,000 Php 50,000 Php 290,000 Php 12,500 Php 25,000arrow_forwardAs a project engineer, you received the AW analysis below from the finance department. It is for a new piece of equipment you ordered some months ago. You were told the interest rate used was 10% per year, but no first cost or projected salvage value was provided and you want to know them. Determine the values of P and S using the AW values for the year 3. Note: The AW values are equivalent values through the given year, not costs for the single year. Years Retained AW of First Cost, $ AW of Operating Cost, $ per Year AW of Salvage Value, $ 1 -51,700 -15,000 35,000 234 -27,091 -17,000 13,810 -18,899 -19,000 6,648 -14,827 -21,000 4,309 5 -12,398 -23,000 2,457 The value of P is $ 25,149.07 and the value of S is $ 8,853.89 Хarrow_forward
- Decision D6, which has three possible choices (X, Y, or Z), must be made in year 3 of a 6-year study period in order to maximize EPW). Using an MARR of 18% per year, the investment required in year 3, and the estimated cash flows for years 4 through 6, determine which decision should be made in year 3. High Low High 06 Low 2 High Low Investment, Cash Flow, (Year Cash Flow, $1000 Cash Flow, Year 31 3) (Year 4) $1000 (Year 5) Cash Flow, $1000 (Year 6) Outcome Probability 3 4 5 6 High (X) $-150,000 $50 $50 $50 0.5 Low (X) $40 $30 $20 0.5 High (Y) $-73,000 $30 $40 $50 0.45 Low (Y) $30 $30 $30 0.55 High (Z) $-240,000 $190 $170 $150 0.7 Low (Z) $-30 $-30 $-30 0.3 The present worth of X is $arrow_forwardNikul Don't upload image pleasearrow_forwardAn engineer must decide between two ways to pump concrete to the top of a seven-story building. Plan 1 requires the leasing of equipment for $60,000 initially and will cost between $0.40 and $0.95 per metric ton to operate, with a most likely cost of $0.50 per metric ton. The pumper can pump 100 metric tons per 8-hour day. If leased, the asset will have a contract period of 5 years. Plan 2 is a rental option that will cost $18,000 per year. In addition, an extra $13.5 per hour labor cost will be incurred for operating the rented equipment per 8-hour day. Which plan should the engineer recommend if the equipment will be needed for 50 days per year? The MARR is 14% per year. The annual worth of plan 1 lease optimistic is $ -19,144.5 The annual worth of plan 1 most likely is $ The annual worth of plan 1 pessimistic is $ The annual worth of plan 2 rental is $ -21,000 Plan 1 lease optimistic is higher Plan 1 most likely is better Plan 1 lease pessimistic is higher ✓than rental of plan 2.…arrow_forward
- An engineer must decide between two ways to pump concrete to the top of a seven-story building. Plan 1 requires the leasing of equipment for $60,000 initially and will cost between $0.40 and $0.95 per metric ton to operate, with a most likely cost of $0.50 per metric ton. The pumper can pump 100 metric tons per 8-hour day. If leased, the asset will have a contract period of 5 years. Plan 2 is a rental option that will cost $12,000 per year. In addition, an extra $17.5 per hour labor cost will be incurred for operating the rented equipment per 8-hour day. Which plan should the engineer recommend if the equipment will be needed for 55 days per year? The MARR is 11% per year. The annual worth of plan 1 lease optimistic is $ . The annual worth of plan 1 most likely is $_____ . The annual worth of plan 1 pessimistic is $___________ . The annual worth of plan 2 rental is $_________ .arrow_forwardAn engineer must decide between two ways to pump concrete to the top of a seven-story building. Plan 1 requires the leasing of equipment for $60,000 initially and will cost between $0.40 and $0.95 per metric ton to operate, with a most likely cost of $0.50 per metric ton. The pumper can pump 100 metric tons per 8-hour day. If leased, the asset will have a contract period of 5 years. Plan 2 is a rental option that will cost $19,000 per year. In addition, an extra $15.5 per hour labor cost will be incurred for operating the rented equipment per 8-hour day. Which plan should the engineer recommend if the equipment will be needed for 45 days per year? The MARR is 14% per year. The annual worth of plan 1 lease optimistic is $ . The annual worth of plan 1 most likely is $ . The annual worth of plan 1 pessimistic is $ . The annual worth of plan 2 rental is.arrow_forwardAn engineer must decide between two ways to pump concrete to the top of a seven-story building. Plan 1 requires the leasing of equipment for $60,000 initially and will cost between $0.40 and $0.95 per metric ton to operate, with a most likely cost of $0.50 per metric ton. The pumper can pump 100 metric tons per 8-hour day. If leased, the asset will have a contract period of 5 years. Plan 2 is a rental option that will cost $18,000 per year. In addition, an extra $16.5 per hour labor cost will be incurred for operating the rented equipment per 8-hour day. Which plan should the engineer recommend if the equipment will be needed for 75 days per year? The MARR is 11% per year. The annual worth of plan 1 lease optimistic is $ The annual worth of plan 1 most likely is $ The annual worth of plan 1 pessimistic is $ The annual worth of plan 2 rental is $ Plan 1 lease optimistic is better Plan 1 most likely is better Plan 1 lease pessimistic is better ✓than rental of plan 2. than rental of plan…arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Principles of Economics (12th Edition)EconomicsISBN:9780134078779Author:Karl E. Case, Ray C. Fair, Sharon E. OsterPublisher:PEARSONEngineering Economy (17th Edition)EconomicsISBN:9780134870069Author:William G. Sullivan, Elin M. Wicks, C. Patrick KoellingPublisher:PEARSON
- Principles of Economics (MindTap Course List)EconomicsISBN:9781305585126Author:N. Gregory MankiwPublisher:Cengage LearningManagerial Economics: A Problem Solving ApproachEconomicsISBN:9781337106665Author:Luke M. Froeb, Brian T. McCann, Michael R. Ward, Mike ShorPublisher:Cengage LearningManagerial Economics & Business Strategy (Mcgraw-...EconomicsISBN:9781259290619Author:Michael Baye, Jeff PrincePublisher:McGraw-Hill Education
Principles of Economics (12th Edition)
Economics
ISBN:9780134078779
Author:Karl E. Case, Ray C. Fair, Sharon E. Oster
Publisher:PEARSON
Engineering Economy (17th Edition)
Economics
ISBN:9780134870069
Author:William G. Sullivan, Elin M. Wicks, C. Patrick Koelling
Publisher:PEARSON
Principles of Economics (MindTap Course List)
Economics
ISBN:9781305585126
Author:N. Gregory Mankiw
Publisher:Cengage Learning
Managerial Economics: A Problem Solving Approach
Economics
ISBN:9781337106665
Author:Luke M. Froeb, Brian T. McCann, Michael R. Ward, Mike Shor
Publisher:Cengage Learning
Managerial Economics & Business Strategy (Mcgraw-...
Economics
ISBN:9781259290619
Author:Michael Baye, Jeff Prince
Publisher:McGraw-Hill Education