Engineering Economy, Student Value Edition (17th Edition)
17th Edition
ISBN: 9780134838137
Author: William G. Sullivan, Elin M. Wicks, C. Patrick Koelling
Publisher: PEARSON
expand_more
expand_more
format_list_bulleted
Question
Chapter 11, Problem 39FE
To determine
Profitability of the project.
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
Calculate the expected flow rate (barrels per day) for each oil well using the estimated probabilities. Estimated Flow, bbl/Day 100 200 300 400 Probability of Flow North well 0.15 0.75 0.10 0.0 East well 0.35 0.15 0.45 0.05
From the decision tree branch shown, determine the expected values of the two outcomes if decision D3 is already selected and the
maximum outcome value is sought. (This decision branch is part of a larger tree.)
Probability
0.4
03
0.3
0.3
0.6
When the probability is 0.4, the value is $60.
When the probability is 0.3, the value is $-27.
When the probability is 0.3, the value is $20.
When the probability is 0.6, the value is $-11.
When the probability is 0.4, the value is $6.2.
0.4
The expected value of the the top node is $
The expected value of the bottom node is $[
only a,b,c,or d option
no explanation
Three applicants are to be selected at random out of 4 boys and 6 girls. What is the probability of selecting, at least one girl?
Answer
Answer Option
a) 0.5
b) 0.15
d) 0.366
c) 0.636
Chapter 11 Solutions
Engineering Economy, Student Value Edition (17th Edition)
Ch. 11 - Prob. 1PCh. 11 - Refer to Example 11-2. Assuming gasoline costs...Ch. 11 - Prob. 3PCh. 11 - Prob. 4PCh. 11 - Prob. 5PCh. 11 - Prob. 6PCh. 11 - Prob. 7PCh. 11 - Prob. 8PCh. 11 - Prob. 9PCh. 11 - Prob. 10P
Ch. 11 - Prob. 11PCh. 11 - Prob. 12PCh. 11 - Prob. 13PCh. 11 - Prob. 14PCh. 11 - Prob. 15PCh. 11 - Prob. 16PCh. 11 - Prob. 17PCh. 11 - Prob. 18PCh. 11 - Prob. 19PCh. 11 - A bridge is to be constructed now as part of a new...Ch. 11 - An aerodynamic three-wheeled automobile (the Dart)...Ch. 11 - Prob. 23PCh. 11 - Prob. 24SECh. 11 - Prob. 25SECh. 11 - Prob. 26SECh. 11 - Prob. 27SECh. 11 - Prob. 28SECh. 11 - Prob. 29SECh. 11 - Prob. 30FECh. 11 - Prob. 31FECh. 11 - A supermarket chain buys loaves of bread from its...Ch. 11 - A supermarket chain buys loaves of bread from its...Ch. 11 - Prob. 34FECh. 11 - Prob. 35FECh. 11 - Prob. 36FECh. 11 - Prob. 37FECh. 11 - Prob. 38FECh. 11 - Prob. 39FECh. 11 - Prob. 40FECh. 11 - Prob. 41FECh. 11 - Prob. 42FE
Knowledge Booster
Similar questions
- Which decision rule is most concerned with downside risk? A) Expected monetary value B) Maximax C) Maximin D) None of the abovearrow_forwardAnswer the problems on the basis of the above graph and the most likely estimates given as follows: If the profit (R−E) is decreased by 5%, this projectis not profitable. (a) True (b) False.arrow_forwardA project with uncertainty is under consideration for implementation. The values are shown in the table below. Calculate the Expected Value of the Net Present Worth of this project. n Proba FC Annual Benefit ProbaB 7% ($100,500) ($100,500) ($100,500) ($100,500) ($100,500) ($100,500) $50,000 $22,000 $37,000 $20,000 $5,000 $95,000 8 23% 43% 55% 35% 7% 8. 35% 7% 8 21% 7% 7% 7% 27% 65% 10 75% 10 85% 10 10% 5%arrow_forward
- (a) Q1: Examine the data in the Table below and determine the lifetimecosts of this hybrid vehicle. b) As logistics manager, you’re considering the following alternativevehicle for your fleet. What are its lifetime costs in comparison withthe hybrid vehicle? c) Calculate the indifference point between the two vehicle designsand the expected age of the vehicles at this point. d) Which car should you choose if you intend to own it for longer thanthis time?arrow_forwardWhat is the fair value of the option? Enter number in USDarrow_forwardTwo projects are independent if the expected costs and the expected benefits of each project do not depend on whether the other one is chosen. Select one: True False 35arrow_forward
- 10arrow_forwardAnswer All parts show stepsarrow_forwardI want you to provide me the Cash Flow diagram of the problem. Only cash flow diagram, the solution is already there. Thanks in advance! The annual estimated cash flow is $140,000. The salvage value will be 12% of the initial price after 5 years. The discount rate (r) is 18% Let us assume the initial price of the doughnut machine be X. PV of cash inflows=PV of cash outflows$140,000×PVAF4,18%+.12X×PVF5,18%=X$140,000×2.69006180465+.12X×0.43710921621=X$376,608.652651=X-0.05245310594$376,608.652651=0.94754689406XX=$397,456.479475 The maximum purchase price of the doughnut machine is $397,456.48.arrow_forward
- D.I. Aelitau, a line manufacturer, wants to select one of three feasible prototype designs for a new tire; A, B, C. Revenues Low Medium High (0.30) (0.50) (0.20) A 120,000 255,000 390,000 B 130,000 295,000 460,000 C 100,000 300,000 480,000 What is the minimum expected opportunity loss? (Hint: EV of PI) $43,500 $6,500 $9,000 $7,000arrow_forwardA European consortium has spent a considerable amount of time andmoney developing a new supersonic aircraft. The aircraft gets high markson all performance measures except noise. In fact, because of the noise,the consortium’s management is concerned that the U.S. government mayimpose restrictions on some of the American airports where the aircraftcan land. Management judges a 50–50 chance that there will be somerestrictions. Without restrictions, management estimates its (presentdiscounted) profit at $125 million; with restrictions, its profit would beonly $25 million. Management must decide now, before knowing thegovernment’s decision, whether to redesign parts of the aircraft to solvethe noise problem. The cost of the redesign program is $25 million. Thereis a .6 chance that the redesign program will solve the noise problem (inwhich case, full landing rights are a certainty) and a .4 chance it will fail. Using a decision tree, determine the consortium’s best course ofaction, assuming…arrow_forwardMr. Decision is torn between two independent projects A and B. The data below each project are given and the MEAs under each project are also given. Take MARR = 12% for all projects. A. Perform the proper evaluation of all the projects available.B. Recommend the project(s) that can be selected from the list so you can help Mr. Decision to decide.C. Explain the method(s) of evaluation you used including the assumption(s) made.arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Managerial Economics: A Problem Solving ApproachEconomicsISBN:9781337106665Author:Luke M. Froeb, Brian T. McCann, Michael R. Ward, Mike ShorPublisher:Cengage Learning
Managerial Economics: A Problem Solving Approach
Economics
ISBN:9781337106665
Author:Luke M. Froeb, Brian T. McCann, Michael R. Ward, Mike Shor
Publisher:Cengage Learning