(a)
Interpretation: A machine shop located on the outskirts of Los Angeles accepts custom orders from a number of high-tech firms in southern California. The machine shop consists of four departments: A (lathes), B (drills), C (grinders), and D (sanders). The from-to chart showing distances in feet between department centers is given.
To Department | |||||||
A | B | C | D | ||||
A | 45 | 63 | 32 | ||||
From Department | B | 29 | 27 | 46 | |||
C | 63 | 75 | 68 | ||||
D | 40 | 30 | 68 |
The shop has accepted orders for production of four products: P1, P2, P3 and P4. The routing for production of these products and the weekly production rates are
Product | Routing | Weekly Production |
P1 | A-B-C-D | 200 |
P2 | A-C-D | 600 |
P3 | B-D | 400 |
P4 | B-C-D | 500 |
Assuming that products are produced in batches of size 25; from the given data, a from-to chart giving numbers of materials handling trips per week between departments needs to be given.
Concept Introduction: A routing planning chart consisting of a matrix is called a from-to chart. Various operations are written across the top and along the left side of the form.
(b)
Interpretation: A machine shop located on the outskirts of Los Angeles accepts custom orders from a number of high-tech forms in southern California. The machine shop consists of four departments: A(lathes), B(drills), C(grinders), and D(sanders). The from-to chart showing distances in feet between department centers is given.
To Department | ||||||
A | B | C | D | |||
A | 45 | 63 | 32 | |||
From Department | B | 29 | 27 | 46 | ||
C | 63 | 75 | 68 | |||
D | 40 | 30 | 68 |
The shop has accepted orders for production of four products: P1, P2, P3 and P4. The routing for production of these products and the weekly production rates are
Product | Routing | Weekly Production |
P1 | A-B-C-D | 200 |
P2 | A-C-D | 600 |
P3 | B-D | 400 |
P4 | B-C-D | 500 |
Assuming that products are produced in batches of size 25, and assuming that the cost of transportation of one batch 1 foot is estimated to be $1.50; from the from-to chart derived from part (a), a from-to chart giving the materials handling cost per week between departments, needs to given.
Concept Introduction: A routing planning chart consisting of a matrix is called a from-to chart. Various operations are written across the top and along the left side of the form.
(c)
Interpretation: A machine shop located on the outskirts of Los Angeles accepts custom orders from a number of high-tech forms in southern California. The machine shop consists of four departments: A(lathes), B(drills), C(grinders), and D(sanders). The from-to chart showing distances in feet between department centers is given.
To Department | ||||||
A | B | C | D | |||
A | 45 | 63 | 32 | |||
From Department | B | 29 | 27 | 46 | ||
C | 63 | 75 | 68 | |||
D | 40 | 30 | 68 |
The shop has accepted orders for production of four products: P1, P2, P3 and P4. The routing for production of these products and the weekly production rates are
Product | Routing | Weekly Production |
P1 | A-B-C-D | 200 |
P2 | A-C-D | 600 |
P3 | B-D | 400 |
P4 | B-C-D | 500 |
Assuming that products are produced in batches of size 25, based on the results of part (b) and assuming that
Concept Introduction: A routing planning chart consisting of a matrix is called a from-to chart. Various operations are written across the top and along the left side of the form.
(d)
Interpretation: A machine shop located on the outskirts of Los Angeles accepts custom orders from a number of high-tech forms in southern California. The machine shop consists of four departments: A(lathes), B(drills), C(grinders), and D(sanders). The from-to chart showing distances in feet between department centers is given.
To Department | ||||||
A | B | C | D | |||
A | 45 | 63 | 32 | |||
From Department | B | 29 | 27 | 46 | ||
C | 63 | 75 | 68 | |||
D | 40 | 30 | 68 |
The shop has accepted orders for production of four products: P1, P2, P3 and P4. The routing for production of these products and the weekly production rates are
Product | Routing | Weekly Production |
P1 | A-B-C-D | 200 |
P2 | A-C-D | 600 |
P3 | B-D | 400 |
P4 | B-C-D | 500 |
Assuming that products are produced in batches of size 25, supposing that the machine shop is located in a building that is 60 feet by 80 feet and that departments are rectangularly shaped, with the shape of facility as in Figure 10-32, a layout consistent with the relationship chart obtained from part (c) needs to be sketched.
Concept Introduction: A routing planning chart consisting of a matrix is called a from-to chart. Various operations are written across the top and along the left side of the form.
Want to see the full answer?
Check out a sample textbook solutionChapter 11 Solutions
Production and Operations Analysis, Seventh Edition
- working as a program operations managerarrow_forward12 X1, X230 1 x =0x2 write the Following linear Programming model by 1- general Form Canonical Forms Canonical formY 2- Standard Form Max Z=35X+ 4 X 2 +6 X3 ST. X+2X2-5x3 = 40 3X, + 6X2 + 7x 3 = 30 7x, +lox2 x3 = 50 X3 X 2 X 3 <0arrow_forwarda/ a Minimum cost assign each worker for one job at Jobs J1 12 33 WI 2 4 6 W2 5 W3 5 33 6 7arrow_forward
- وبة واضافة هذه القيمة الى القيم Ex: Assign each job for each worker at minimum total Cost عمل لكل عامل وبأقل كلفة ممكنة obs الأعمال Workors العمال J1 J2 J3 J4 W₁ 15 13 14 12 W2 11 12 15 13 W3 13 12 10 11 W4 15 17 14 16arrow_forwardThe average completion time (flow time) for the sequence developed using the FCFS rule = 11.75 days (round your response to two decimal places). The percentage utilization for the sequence developed using the FCFS rule = 42.55 % (enter your response as a percentage rounded to two decimal places). b) Using the SPT (shortest processing time) decision rule for sequencing the jobs, the order is (to resolve a tie, use the order in which the jobs were received): An Alabama lumberyard has four jobs on order, as shown in the following table. Today is day 205 on the yard's schedule. In what sequence would the jobs be ranked according to the decision rules on the left: Job Due Date A 212 B 209 C 208 D 210 Duration (days) 6 3 3 8 Sequence 1 Job B 2 3 4 A D The average tardiness (job lateness) for the sequence developed using the SPT rule = 5.00 days (round your response to two decimal places). The average completion time (flow time) for the sequence developed using the SPT rule = 10.25 days…arrow_forwardWith the aid of examples, fully discuss any five (5) political tactics used in organisations.arrow_forward
- a. With the aid of examples, define discrimination. b. Fully discuss any four (4) types of discrimination in the workplacearrow_forwardRead the Following Extract and Answer the Questions that Follows:The word politics has a somewhat negative connotation. It suggests that someone is attempting touse means or to gain ends that are not sanctioned by the organisation. Political behaviour, as we’vedefined it is quite neutral. Similarly, power is not inherently negative. Whether a person viewspower and politics as unsavoury topics depends on several considerations, most important perhapsbeing where the individual stands on a specific issue in each situation. Nonetheless, most managersare reluctant to admit to political character of their own work settings.Discuss any Five (5) Political tactics you know.arrow_forwardDescribe current features of Cigna Accredo pharmacy own appraisal forms and compare the system used against the textbook’s description of desirable features of appraisal forms. What improvements would you recommend and why?arrow_forward
- Provide a recommendation of a combination of different methods of performance data that could be used to arrive at an overall score for each person being rated in cigna Accredo pharmacy. Explain the comprehensive system you have recommended and why you have chosen this combination of tools. Support your answer with research.arrow_forwardAlready got wrong answer Plz Don't use chatgptarrow_forwardThe RTY calculation for the following process steps would be: A ➡ ○ A.YA+YB+YC+YD OB. (YA)(YB)(YCYD) OC. ((YA+YB+YC+YD)/4)*4 ○ D. (1/YA)+(1/YB)+(1/YC)+YD B C Darrow_forward
- Practical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,Operations ManagementOperations ManagementISBN:9781259667473Author:William J StevensonPublisher:McGraw-Hill EducationOperations and Supply Chain Management (Mcgraw-hi...Operations ManagementISBN:9781259666100Author:F. Robert Jacobs, Richard B ChasePublisher:McGraw-Hill Education
- Purchasing and Supply Chain ManagementOperations ManagementISBN:9781285869681Author:Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. PattersonPublisher:Cengage LearningProduction and Operations Analysis, Seventh Editi...Operations ManagementISBN:9781478623069Author:Steven Nahmias, Tava Lennon OlsenPublisher:Waveland Press, Inc.