Concept explainers
(a)
Interpretation: A machine shop located on the outskirts of Los Angeles accepts custom orders from a number of high-tech firms in southern California. The machine shop consists of four departments: A (lathes), B (drills), C (grinders), and D (sanders). The from-to chart showing distances in feet between department centers is given.
To Department | |||||||
A | B | C | D | ||||
A | 45 | 63 | 32 | ||||
From Department | B | 29 | 27 | 46 | |||
C | 63 | 75 | 68 | ||||
D | 40 | 30 | 68 |
The shop has accepted orders for production of four products: P1, P2, P3 and P4. The routing for production of these products and the weekly production rates are
Product | Routing | Weekly Production |
P1 | A-B-C-D | 200 |
P2 | A-C-D | 600 |
P3 | B-D | 400 |
P4 | B-C-D | 500 |
Assuming that products are produced in batches of size 25; from the given data, a from-to chart giving numbers of materials handling trips per week between departments needs to be given.
Concept Introduction: A routing planning chart consisting of a matrix is called a from-to chart. Various operations are written across the top and along the left side of the form.
(b)
Interpretation: A machine shop located on the outskirts of Los Angeles accepts custom orders from a number of high-tech forms in southern California. The machine shop consists of four departments: A(lathes), B(drills), C(grinders), and D(sanders). The from-to chart showing distances in feet between department centers is given.
To Department | ||||||
A | B | C | D | |||
A | 45 | 63 | 32 | |||
From Department | B | 29 | 27 | 46 | ||
C | 63 | 75 | 68 | |||
D | 40 | 30 | 68 |
The shop has accepted orders for production of four products: P1, P2, P3 and P4. The routing for production of these products and the weekly production rates are
Product | Routing | Weekly Production |
P1 | A-B-C-D | 200 |
P2 | A-C-D | 600 |
P3 | B-D | 400 |
P4 | B-C-D | 500 |
Assuming that products are produced in batches of size 25, and assuming that the cost of transportation of one batch 1 foot is estimated to be $1.50; from the from-to chart derived from part (a), a from-to chart giving the materials handling cost per week between departments, needs to given.
Concept Introduction: A routing planning chart consisting of a matrix is called a from-to chart. Various operations are written across the top and along the left side of the form.
(c)
Interpretation: A machine shop located on the outskirts of Los Angeles accepts custom orders from a number of high-tech forms in southern California. The machine shop consists of four departments: A(lathes), B(drills), C(grinders), and D(sanders). The from-to chart showing distances in feet between department centers is given.
To Department | ||||||
A | B | C | D | |||
A | 45 | 63 | 32 | |||
From Department | B | 29 | 27 | 46 | ||
C | 63 | 75 | 68 | |||
D | 40 | 30 | 68 |
The shop has accepted orders for production of four products: P1, P2, P3 and P4. The routing for production of these products and the weekly production rates are
Product | Routing | Weekly Production |
P1 | A-B-C-D | 200 |
P2 | A-C-D | 600 |
P3 | B-D | 400 |
P4 | B-C-D | 500 |
Assuming that products are produced in batches of size 25, based on the results of part (b) and assuming that
Concept Introduction: A routing planning chart consisting of a matrix is called a from-to chart. Various operations are written across the top and along the left side of the form.
(d)
Interpretation: A machine shop located on the outskirts of Los Angeles accepts custom orders from a number of high-tech forms in southern California. The machine shop consists of four departments: A(lathes), B(drills), C(grinders), and D(sanders). The from-to chart showing distances in feet between department centers is given.
To Department | ||||||
A | B | C | D | |||
A | 45 | 63 | 32 | |||
From Department | B | 29 | 27 | 46 | ||
C | 63 | 75 | 68 | |||
D | 40 | 30 | 68 |
The shop has accepted orders for production of four products: P1, P2, P3 and P4. The routing for production of these products and the weekly production rates are
Product | Routing | Weekly Production |
P1 | A-B-C-D | 200 |
P2 | A-C-D | 600 |
P3 | B-D | 400 |
P4 | B-C-D | 500 |
Assuming that products are produced in batches of size 25, supposing that the machine shop is located in a building that is 60 feet by 80 feet and that departments are rectangularly shaped, with the shape of facility as in Figure 10-32, a layout consistent with the relationship chart obtained from part (c) needs to be sketched.
Concept Introduction: A routing planning chart consisting of a matrix is called a from-to chart. Various operations are written across the top and along the left side of the form.

Want to see the full answer?
Check out a sample textbook solution
Chapter 11 Solutions
Production and Operations Analysis, Seventh Edition
- Women who ask for what they want in negotiation are less well-liked than women who do not self-advocate. However, nonassertive, other-advocating women suffer a leadership backlash and are regarded as less competent because their behavior is regarded to be _____ and _____. A. high-negative feminine; low-positive masculine B. high-positive feminine; high-positive masculine C. high-negative masculine; low-negative feminine D. low-positive masculine; low-positive femininearrow_forwardThere are five most recognized personality traits that can reliably be measured and predict negotiator behavior in a number of different situations. All of the following are one of those "Big 5" personality traits except _____. A. conscientiousness B. introversion C. agreeableness D. openness to experiencearrow_forwardWith regard to reputation in negotiation, negotiators who use adversarial, stubborn, and ethically questionable behavior often have the effect of _____. A. improving their business relationships B. decreasing their effectiveness as a negotiator C. improving their business relationships D. decreasing their group statusarrow_forward
- When it comes to assertiveness, there is only a modest link between negotiators' self-views and how the counterparty sees them. Many negotiators come away from a negotiation thinking they came on too strong with the counterparty. The _____ refers to the fact that negotiators believe they are coming on too strong with the counterparty, but they actually are not. A. Collective trap illusion B. Attribution error C. Aggressive anchoring bias D. Line-crossing illusionarrow_forwardAs you think about the issue of using chatbots in contract negotiations, consider whether other facets and concepts of negotiations that we have discussed and whether they would be adequately addressed.arrow_forwardWhile I am not a fan of AI as of yet, I do understand the endless possibilities. Based on the research, it is clear that AI has great potential for negotiation (Yang, 2025). Herold et al. (2025) suggested that AI can flag potential risks and liabilities, allowing negotiators to address them and mitigate potential problems proactively. AI can draft new contract templates by examining industry standards and past contracts, and AI technology can help lawyers spot errors and inconsistencies in contract drafts. In relation to risk management, AI can flag possible risks and liabilities, allowing negotiators to proactively address them and lessen potential problems, which can speed up the negotiation process, making the negotiation efficient because AI can industrialize tasks like document review, redlining, and finding potential issues, significantly reducing negotiation time. Lastly, AI can analyze vast amounts of data and identify errors, inconsistencies, and irregularities in…arrow_forward
- What is a main thought on using AI in contract negotiations?arrow_forwardWhat are some people thoughts on using AI in contract negotiations?arrow_forward3. Develop a high-level or summary: a. Risk Management Plan Focus on specific, actionable steps for each risk and mitigation strategy.Provide detailed timelines for procurement, stakeholder engagement, and risk monitoring.Avoid over-simplifying and add more technical details in areas like quality assurance and financial control measures. Add a risk prioritization method and mention how risks will be monitored and reviewed throughout the project lifecycle. Overall, it is well organized andc overs key risks.arrow_forward
- 3. Develop a high-level or summary: Human Resource Management Plan Provide more concrete timelines and actionable steps for human resource management.Include more detailed risk management strategies and link them more explicitly to the overall project plan.Expand on how training and development will be evaluated and tracked.Also, the overall length is good, but some sections could be condensed by eliminating repetition (e.g., you discuss stakeholder communication and engagement in two sections without adding new information).Try not to repeat the same risk management ideas (e.g., resource sharing and stakeholder concerns) in multiple sections without adding value.arrow_forwardBased on the U.S. Department of Transporation's publication on the number of inrternatioal passengers that come through New York airport (JFK) in 2012, how would I estimate the passenger volume for the coming year?arrow_forwardWhat are the role of trends and seasonality based on the Department of Transportation publication of the number of international passengers that come through New York (JFK) in 2012?arrow_forward
- Practical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,Purchasing and Supply Chain ManagementOperations ManagementISBN:9781285869681Author:Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. PattersonPublisher:Cengage LearningMarketingMarketingISBN:9780357033791Author:Pride, William MPublisher:South Western Educational Publishing