Consider the master flight
Interpretation: The similarities between the master flight schedule of an airlines to the master production schedule for a manufacturer.
Concept Introduction: Master flight schedule of any airlines shows the timings of each of the flight. Similarly the master production schedule of a manufacturing organization shows the time when the manufacture of each product starts. Both have some similarities.
Answer to Problem 2DQ
There are many similarities between the master flight schedule and the master production schedule of an airlines and a manufacturer respectively.
Explanation of Solution
Given information: Activities consisting lead times to aircraft’s readiness and related to the time of departure.
- The master flight schedule shows the time for the flight to a certain destination. This is similar to a master production schedule showing the taking up the production of a certain part/job.
- The flight schedule shows the time to the destination i.e. the length of this flight (run) and the time allowed. Similarly the master production schedule shows the no. of parts to be manufactured and the time to be taken (for this run).
- Before the flight, many tasks are to be completed viz. loading fuel, meals and other consumables; boarding passengers etc. Similarly before the manufacturing equipment starts the production run, there are tasks like setting the machine and loading the components etc.
- There can be delays/interruptions in these tasks for both-the flight and the production run.
- The flight will end after completing the run. Similarly the production run will stop after completing the scheduled quantity.
- The plane moves on for the next scheduled flight. The manufacturing equipment also moves on the run of the next scheduled product.
Want to see more full solutions like this?
Chapter 11 Solutions
Operations Management: Processes and Supply Chains (12th Edition) (What's New in Operations Management)
Additional Business Textbook Solutions
Essentials of MIS (13th Edition)
Financial Accounting, Student Value Edition (5th Edition)
Financial Accounting: Tools for Business Decision Making, 8th Edition
Principles of Operations Management: Sustainability and Supply Chain Management (10th Edition)
Gitman: Principl Manageri Finance_15 (15th Edition) (What's New in Finance)
- I need to forecast using a 3-Period-Moving-Average-Monthly forecasting model which I did but then I need to use my forecast numbers to generate a Master Production Schedule (MPS) I have to Start with actual sales (my own test data numbers) for August-2022 Oct-2022 i need to create MPS to supply demand starting November-2022 April 2023 I just added numbers without applying formulas to the mps on the right side of the spreadsheet because I do not know how to do it. The second image is the example of what it should look like. Thank You.arrow_forwardSolve the following Question 1. How do volume and variety affect the process selection and layout types? Discuss 2. How is the human resource aspect important to operation function? Discuss 3. Discuss the supply network design and its impact on the overall performance of the organization.arrow_forwardHelp with question?arrow_forward
- What are some good examples of bullet points on a resume for a Christian Elementary School?arrow_forwardWhat is an example of a cover letter for a Christian School Long-Term Substitute Teaching position?arrow_forwardThe supply chain is a conventional notion, but organizations are only really interested in making products that they can sell to customers. Provided they have reliable supplies of materials and reasonable transport for finished products, logistics is irrelevant. Do you think this is true? If yes, explain, and if no, clearly explain as well.arrow_forward
- working as a program operations managerarrow_forward12 X1, X230 1 x =0x2 write the Following linear Programming model by 1- general Form Canonical Forms Canonical formY 2- Standard Form Max Z=35X+ 4 X 2 +6 X3 ST. X+2X2-5x3 = 40 3X, + 6X2 + 7x 3 = 30 7x, +lox2 x3 = 50 X3 X 2 X 3 <0arrow_forwarda/ a Minimum cost assign each worker for one job at Jobs J1 12 33 WI 2 4 6 W2 5 W3 5 33 6 7arrow_forward
- وبة واضافة هذه القيمة الى القيم Ex: Assign each job for each worker at minimum total Cost عمل لكل عامل وبأقل كلفة ممكنة obs الأعمال Workors العمال J1 J2 J3 J4 W₁ 15 13 14 12 W2 11 12 15 13 W3 13 12 10 11 W4 15 17 14 16arrow_forwardThe average completion time (flow time) for the sequence developed using the FCFS rule = 11.75 days (round your response to two decimal places). The percentage utilization for the sequence developed using the FCFS rule = 42.55 % (enter your response as a percentage rounded to two decimal places). b) Using the SPT (shortest processing time) decision rule for sequencing the jobs, the order is (to resolve a tie, use the order in which the jobs were received): An Alabama lumberyard has four jobs on order, as shown in the following table. Today is day 205 on the yard's schedule. In what sequence would the jobs be ranked according to the decision rules on the left: Job Due Date A 212 B 209 C 208 D 210 Duration (days) 6 3 3 8 Sequence 1 Job B 2 3 4 A D The average tardiness (job lateness) for the sequence developed using the SPT rule = 5.00 days (round your response to two decimal places). The average completion time (flow time) for the sequence developed using the SPT rule = 10.25 days…arrow_forwardWith the aid of examples, fully discuss any five (5) political tactics used in organisations.arrow_forward
- Practical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,