Show that the thermal efficiency of a combined gas–steam power plant ηcc can be expressed as

η = η g + η s η g η s

where ηg = Wg /Qin and ηs = Ws/Qg,out are the thermal efficiencies of the gas and steam cycles, respectively. Using this relation, determine the thermal efficiency of a combined power cycle that consists of a topping gas-turbine cycle with an efficiency of 40 percent and a bottoming steam-turbine cycle with an efficiency of 30 percent.

Blurred answer
Students have asked these similar questions
1- Determine the following: 1- RSHF? 2- C.C.C in tons-ref. 3- Mass of supply air? Fresh Spray chilled water S air 100% RH To 34 C db & 26 wbt S Operation fan room I Exhaust air Ti 22 C db & 50% RH
How do I solve this task A weight for a lift is suspended using an adapter. The counterweight is held up with 4 screws. The weight F is 3200kg. The screws have a strength class of 8.8. Safety factor 3 Which is the smallest bunch size that can be used?+_Sr/Fm =0,16Gr=0,71ơ=800·0.8=640 MPaAs=?Fmax= As·ơ·GrFs=ơs·AsFFm= Fs· GFSF =SF / FFm · FFm Fpreload =Fload / SF → Fload /3Fpreload per screw =Fload / SF → Fload /4As=Fpreload per screw /ơ·Gr → As= Fpreload per screw / 640· 0.71 The correct answer should be M12 with As=84.3mm²
... TELEGRAM ديسمبر ۲۰۲ عند الساعة سوأل الوجه البينة ۲۷ - Find the equivalent resistance between A and B bellows For the circuit shown. • All resistances in Ohms. 2 C 2 A 4 B www 4 E 5 www ww 8 bar K. Dr. Abduljabbo Hammade 27/12/2024

Chapter 10 Solutions

EBK THERMODYNAMICS: AN ENGINEERING APPR

Ch. 10.9 - Is it possible to maintain a pressure of 10 kPa in...Ch. 10.9 - 10–12 A steam power plant operates on a simple...Ch. 10.9 - 10–13 Refrigerant-134a is used as the working...Ch. 10.9 - 10–14 A simple ideal Rankine cycle which uses...Ch. 10.9 - 10–15E A simple ideal Rankine cycle with water as...Ch. 10.9 - Consider a 210-MW steam power plant that operates...Ch. 10.9 - Consider a 210-MW steam power plant that operates...Ch. 10.9 - A steam Rankine cycle operates between the...Ch. 10.9 - A steam Rankine cycle operates between the...Ch. 10.9 - Prob. 20PCh. 10.9 - Prob. 21PCh. 10.9 - A simple Rankine cycle uses water as the working...Ch. 10.9 - The net work output and the thermal efficiency for...Ch. 10.9 - A binary geothermal power plant uses geothermal...Ch. 10.9 - Consider a coal-fired steam power plant that...Ch. 10.9 - Show the ideal Rankine cycle with three stages of...Ch. 10.9 - How do the following quantities change when a...Ch. 10.9 - Consider a simple ideal Rankine cycle and an ideal...Ch. 10.9 - An ideal reheat Rankine cycle with water as the...Ch. 10.9 - 10–31 A steam power plant operates on the ideal...Ch. 10.9 - Steam enters the high-pressure turbine of a steam...Ch. 10.9 - 10–34 Consider a steam power plant that operates...Ch. 10.9 - A steam power plant operates on an ideal reheat...Ch. 10.9 - Consider a steam power plant that operates on a...Ch. 10.9 - Repeat Prob. 1041 assuming both the pump and the...Ch. 10.9 - Prob. 39PCh. 10.9 - How do open feedwater heaters differ from closed...Ch. 10.9 - How do the following quantities change when the...Ch. 10.9 - Prob. 43PCh. 10.9 - 10–44 The closed feedwater heater of a...Ch. 10.9 - A steam power plant operates on an ideal...Ch. 10.9 - A steam power plant operates on an ideal...Ch. 10.9 - 10–47 A steam power plant operates on an ideal...Ch. 10.9 - Consider a steam power plant that operates on the...Ch. 10.9 - Consider a steam power plant that operates on the...Ch. 10.9 - Consider a steam power plant that operates on the...Ch. 10.9 - Consider an ideal steam regenerative Rankine cycle...Ch. 10.9 - A steam power plant operates on an ideal...Ch. 10.9 - Repeat Prob. 1060, but replace the open feedwater...Ch. 10.9 - 10–57 An ideal Rankine steam cycle modified with...Ch. 10.9 - Prob. 58PCh. 10.9 - Prob. 59PCh. 10.9 - Prob. 60PCh. 10.9 - Consider a steam power plant that operates on a...Ch. 10.9 - Prob. 63PCh. 10.9 - Prob. 64PCh. 10.9 - The schematic of a single-flash geothermal power...Ch. 10.9 - Prob. 66PCh. 10.9 - Prob. 67PCh. 10.9 - Consider a cogeneration plant for which the...Ch. 10.9 - Prob. 69PCh. 10.9 - A large food-processing plant requires 1.5 lbm/s...Ch. 10.9 - Steam is generated in the boiler of a cogeneration...Ch. 10.9 - Consider a cogeneration power plant modified with...Ch. 10.9 - Steam is generated in the boiler of a cogeneration...Ch. 10.9 - Prob. 75PCh. 10.9 - Why is the combined gassteam cycle more efficient...Ch. 10.9 - The gas-turbine portion of a combined gassteam...Ch. 10.9 - Prob. 78PCh. 10.9 - Prob. 80PCh. 10.9 - Consider a combined gassteam power plant that has...Ch. 10.9 - Why is steam not an ideal working fluid for vapor...Ch. 10.9 - Prob. 86PCh. 10.9 - What is the difference between the binary vapor...Ch. 10.9 - Why is mercury a suitable working fluid for the...Ch. 10.9 - By writing an energy balance on the heat exchanger...Ch. 10.9 - Steam enters the turbine of a steam power plant...Ch. 10.9 - Prob. 91RPCh. 10.9 - A steam power plant operates on an ideal Rankine...Ch. 10.9 - Consider a steam power plant operating on the...Ch. 10.9 - Consider a steam power plant that operates on a...Ch. 10.9 - Repeat Prob. 1098 assuming both the pump and the...Ch. 10.9 - Consider an ideal reheatregenerative Rankine cycle...Ch. 10.9 - Prob. 97RPCh. 10.9 - Prob. 98RPCh. 10.9 - A textile plant requires 4 kg/s of saturated steam...Ch. 10.9 - Consider a cogeneration power plant that is...Ch. 10.9 - Prob. 101RPCh. 10.9 - Reconsider Prob. 10105E. It has been suggested...Ch. 10.9 - Reconsider Prob. 10106E. During winter, the system...Ch. 10.9 - Prob. 104RPCh. 10.9 - Prob. 105RPCh. 10.9 - Prob. 106RPCh. 10.9 - A steam power plant operates on an ideal...Ch. 10.9 - Show that the thermal efficiency of a combined...Ch. 10.9 - Prob. 113RPCh. 10.9 - Starting with Eq. 1020, show that the exergy...Ch. 10.9 - A solar collector system delivers heat to a power...Ch. 10.9 - Consider a simple ideal Rankine cycle. If the...Ch. 10.9 - Consider a simple ideal Rankine cycle with fixed...Ch. 10.9 - Consider a simple ideal Rankine cycle with fixed...Ch. 10.9 - Consider a simple ideal Rankine cycle with fixed...Ch. 10.9 - Prob. 120FEPCh. 10.9 - A simple ideal Rankine cycle operates between the...Ch. 10.9 - Prob. 122FEPCh. 10.9 - Prob. 123FEPCh. 10.9 - Consider a combined gas-steam power plant. Water...Ch. 10.9 - Pressurized feedwater in a steam power plant is to...Ch. 10.9 - Consider a steam power plant that operates on the...
Knowledge Booster
Background pattern image
Mechanical Engineering
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, mechanical-engineering and related others by exploring similar questions and additional content below.
Similar questions
SEE MORE QUESTIONS
Recommended textbooks for you
Text book image
Elements Of Electromagnetics
Mechanical Engineering
ISBN:9780190698614
Author:Sadiku, Matthew N. O.
Publisher:Oxford University Press
Text book image
Mechanics of Materials (10th Edition)
Mechanical Engineering
ISBN:9780134319650
Author:Russell C. Hibbeler
Publisher:PEARSON
Text book image
Thermodynamics: An Engineering Approach
Mechanical Engineering
ISBN:9781259822674
Author:Yunus A. Cengel Dr., Michael A. Boles
Publisher:McGraw-Hill Education
Text book image
Control Systems Engineering
Mechanical Engineering
ISBN:9781118170519
Author:Norman S. Nise
Publisher:WILEY
Text book image
Mechanics of Materials (MindTap Course List)
Mechanical Engineering
ISBN:9781337093347
Author:Barry J. Goodno, James M. Gere
Publisher:Cengage Learning
Text book image
Engineering Mechanics: Statics
Mechanical Engineering
ISBN:9781118807330
Author:James L. Meriam, L. G. Kraige, J. N. Bolton
Publisher:WILEY
Power Plant Explained | Working Principles; Author: RealPars;https://www.youtube.com/watch?v=HGVDu1z5YQ8;License: Standard YouTube License, CC-BY