COST ACCOUNTING
16th Edition
ISBN: 9781323169261
Author: Horngren
Publisher: PEARSON C
expand_more
expand_more
format_list_bulleted
Textbook Question
Chapter 10, Problem 10.41P
Cost estimation, incremental unit-time learning model. Assume the same information for the Pacific Boat Company as in Problem 10-40 with one exception. This exception is that Pacific Boat uses a 90% incremental unit-time learning model as a basis for predicting direct manufacturing labor-hours in its assembling operations. (A 90% learning curve means b = −0.152004.)
- 1. Prepare a prediction of the total costs for producing the six PT109s for the Navy.
Required
- 2. If you solved requirement 1 of Problem 10-40, compare your cost prediction there with the one you made here. Why are the predictions different? How should Pacific Boat decide which model it should use?
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
Assume the same information for the Pacific Boat Company as in Problem 10-40 with one exception. This exception is that Pacific Boat uses a 90% incremental unit-time learning model as a basis for predicting direct manufacturing labor-hours in its assembling operations. (A 90% learning curve means b = -0.152004.)
Q. Prepare a prediction of the total costs for producing the six PT109s for the Navy.
Use the following information for the next 2 questions (8 & 9).
Division X produces and sells a product to external and internal customers. Per-unit information about its operations include:
Selling price per unit to external customers $250 Variable manufacturing costs per unit 115 Fixed manufacturing overhead costs per unit 70
8. If X is operating at capacity and has unlimited external customer demand, what should be the minimum transfer price?
9. If X has sufficient excess capacity to meet internal demand, what should be the minimum transfer price?
Use the following data to solve problem #2:
- Fixed costs $2,500
- Variable cost per unit $1.00
- Selling price per unit $6.00
- Run a simulation for production runs in increments of 100 (run 15)
- At what production level in the company profitable
- What is the amount of profit?
- What is the maximum profit under these conditions
- Show all work on a spreadsheet
Chapter 10 Solutions
COST ACCOUNTING
Ch. 10 - What two assumptions are frequently made when...Ch. 10 - Describe three alternative linear cost functions.Ch. 10 - What is the difference between a linear and a...Ch. 10 - High correlation between two variables means that...Ch. 10 - Name four approaches to estimating a cost...Ch. 10 - Describe the conference method for estimating a...Ch. 10 - Describe the account analysis method for...Ch. 10 - List the six steps in estimating a cost function...Ch. 10 - When using the high-low method, should you base...Ch. 10 - Describe three criteria for evaluating cost...
Ch. 10 - Define learning curve. Outline two models that can...Ch. 10 - Discuss four frequently encountered problems when...Ch. 10 - Prob. 10.13QCh. 10 - All the independent variables in a cost function...Ch. 10 - Multicollinearity exists when the dependent...Ch. 10 - HL Co. uses the high-low method to derive a total...Ch. 10 - A firm uses simple linear regression to forecast...Ch. 10 - In regression analysis, the coefficient of...Ch. 10 - A regression equation is set up, where the...Ch. 10 - What would be the approximate value of the...Ch. 10 - Estimating a cost function. The controller of the...Ch. 10 - Identifying variable-, fixed-, and mixed-cost...Ch. 10 - Various cost-behavior patterns. (CPA, adapted)....Ch. 10 - Matching graphs with descriptions of cost and...Ch. 10 - Account analysis, high-low. Stein Corporation...Ch. 10 - Account analysis method. Gower, Inc., a...Ch. 10 - Prob. 10.27ECh. 10 - Estimating a cost function, high-low method. Lacy...Ch. 10 - Linear cost approximation. Dr. Young, of Young and...Ch. 10 - Cost-volume-profit and regression analysis....Ch. 10 - Regression analysis, service company. (CMA,...Ch. 10 - High-low, regression. May Blackwell is the new...Ch. 10 - Learning curve, cumulative average-time learning...Ch. 10 - Learning curve, incremental unit-time learning...Ch. 10 - High-low method. Wayne Mueller financial analyst...Ch. 10 - High-low method and regression analysis. Market...Ch. 10 - High-low method; regression analysis. (CIMA,...Ch. 10 - Regression, activity-based costing, choosing cost...Ch. 10 - Interpreting regression results. Spirit...Ch. 10 - Cost estimation, cumulative average-time learning...Ch. 10 - Cost estimation, incremental unit-time learning...Ch. 10 - Regression; choosing among models. Apollo Hospital...Ch. 10 - Multiple regression (continuation of 10-42). After...Ch. 10 - Cost estimation. Hankuk Electronics started...Ch. 10 - Prob. 10.45PCh. 10 - Interpreting regression results, matching time...Ch. 10 - Purchasing department cost drivers, activity-based...Ch. 10 - Purchasing department cost drivers, multiple...
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, accounting and related others by exploring similar questions and additional content below.Similar questions
- Can you provide step by step solution for every requirement?arrow_forward1. Top-down versus bottom-up estimates. pts. a. Describe the methods and uses of each of the approaches. 2. Compare the advantages and disadvantages of each of the approaches. 3. What are the three types of costs discussed in the text? Define them. 4. For a small project requiring 120 hours at $50/hr and having a direct overhead rate of 40%, calculate the direct cost (Exercise 1 in Chapter 5). To that add indirect costs (G&A) at 20% and then profit at 20% for a total project price. What are the estimated costs for: Design Programming In-house testing Which “approach to estimating” is this? What weaknesses are inherent in this approach? 5. Take another look at Exercise #5. Use Exercise Figure 5.1 on page 160. But now you are asked to do a bottom-up estimate based on the following data and compare it with the top-down estimate of $800,000. If confronted with these two estimates, what, if any, actions would you take? Deliverables Estimated Hours Rate:…arrow_forwardAnswer all parts of the question 1. The unit costs ($) for manufacturing a component for a washing machine are as follows: Direct labor: 20; direct materials: $5; indirect labor and materials: 20% of direct labor; fixed and administrative costs: 30; selling costs: 10. a) Assuming a 90% first-pass yield, what should the unit selling price be if the manufacturer desires a 20% profit margin for conforming product? b) The manufacturer has identified a secondary market for the nonconforming products, that they can sell at $75/unit. Conforming product they wish to sell at 30% above costs. What is the expected profit per unit sold if the company has the same first-pass yield as in part a)? c) If the company improves its first-pass yield to 98%, what is the expected profit per unit sold, assuming other conditions are as stated in part b)?arrow_forward
- 10-36 Cost estimation, incremental unit-time learning model. Assume the same information for the Blue Seas Company as in Problem 10-35 with one exception. This exception is that Blue Seas uses a 90% incremental unit-time learning model as a basis for predicting direct manufacturing labor-hours in its assembling operations. (A 90% learning curve means b = −0.152004.) Prepare a prediction of the total costs for producing the six PT109s for the Navy. If you solved requirement 1 of Problem 10-35, compare your cost prediction there with the one you made here. Why are the predictions different? How should Blue Seas decide which model it should use?arrow_forwardYour boss would like you to estimate the fixed and variable components of a particular cost Actual data for this cost over four recent periods appear below. Activity Cost Period 1 22 235 Period 2 23 243 Period 3 25 255 Period 4 20 227 Using the least-squares regression method, what is the cost formula for this cost? Y = P107.45 + P5.89X O Y = P0.00 + P10.67X O Y = P111.92 + P5.69X O Y = P120.81 + P3.56Xarrow_forwardThe management of Hartman Company is trying to determine the amount of each of two products to produce over the coming planning period. The following information concerns labor availability, labor utilization, and product profitability: a. Develop a linear programming model of the Hartman Company problem. Solve the model to determine the optimal production quantities of products 1 and 2. b. In computing the profit contribution per unit, management does not deduct labor costs because they are considered fixed for the upcoming planning period. However, suppose that overtime can be scheduled in some of the departments. Which departments would you recommend scheduling for overtime? How much would you be willing to pay per hour of overtime in each department? c. Suppose that 10, 6, and 8 hours of overtime may be scheduled in departments A, B, and C, respectively. The cost per hour of overtime is 18 in department A, 22.50 in department B, and 12 in department C. Formulate a linear programming model that can be used to determine the optimal production quantities if overtime is made available. What are the optimal production quantities, and what is the revised total contribution to profit? How much overtime do you recommend using in each department? What is the increase in the total contribution to profit if overtime is used?arrow_forward
- 3. Calculate the cycle time for each product by dividing the total hours used for each product by the units produced for each product. Now calculate the DBC cost for each product. Comment on the significance of DBC for this settingarrow_forwardRequired: A. For each model, compute the contribution margin per unit. B. For each model, compute the contribution margin per Direct Labor hour. C. If there is excess capacity, which model is the most profitable to produce? Why? D. If there is labor crisis, which model is the most profitable to produce? Why?arrow_forwardFloryn Instruments Co. developed the following regression equations to indicate costs at various activity levels: Direct labor = P4 per unitMaterials = P3 per unitSupervision = P5,000Power = 300 + P0.25 per unit + P0.50 per machine hourFactory supplies = P250 + P0.75 per unitDepreciation—equipment = P1 per machine hourDepreciation—building = P10,000During the next period, the company anticipates production of 20,000 units and usage of 3,000 machine hours.Required: Prepare a schedule of the production costs to be incurred during the next period.arrow_forward
- The University of Ghana would want to increase the number of students by 10%. However, management would have to increase the number of lecturers which will result into 15% rise in compensation expense. This thus makes the additional expense a/an OA. incremental cost and relevant cost as well O B. fixed cost and relevant cost as well OC. variable cost and opportunity cost as well D. relevant cost and sunk cost as wellarrow_forwardAssume that the situation can be expressed as a linear cost function. Find the cost function in this case. Marginal cost: $60; 120 items cost $8000 to produce. The linear cost function is C(x)= FEEarrow_forwardData table Month Total Cost Machine Hours January.. 3,420 1,090 February..... S 3,760 1,120 March .... $ 3,532 1,080 April ..... 3,720 1,220 May S 4,800 1,330 June 4,192 1,480 .. %24 %24arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Cornerstones of Cost Management (Cornerstones Ser...AccountingISBN:9781305970663Author:Don R. Hansen, Maryanne M. MowenPublisher:Cengage LearningEssentials of Business Analytics (MindTap Course ...StatisticsISBN:9781305627734Author:Jeffrey D. Camm, James J. Cochran, Michael J. Fry, Jeffrey W. Ohlmann, David R. AndersonPublisher:Cengage Learning
Cornerstones of Cost Management (Cornerstones Ser...
Accounting
ISBN:9781305970663
Author:Don R. Hansen, Maryanne M. Mowen
Publisher:Cengage Learning
Essentials of Business Analytics (MindTap Course ...
Statistics
ISBN:9781305627734
Author:Jeffrey D. Camm, James J. Cochran, Michael J. Fry, Jeffrey W. Ohlmann, David R. Anderson
Publisher:Cengage Learning
How to Estimate Project Costs: A Method for Cost Estimation; Author: Online PM Courses - Mike Clayton;https://www.youtube.com/watch?v=YQ2Wi3Jh3X0;License: Standard Youtube License