The given data of a proposed Manila-Cavite Coastal Road is tabulated below. The free haul distance is 50 m and the cost of borrow is P420 per cu. m., cost pf excavation is P350 per cu. m. and the cost of haul is P21 per meter station. The ground surface is assume to be uniformly sloping. Area Station Cut Fill 10+160 41.13 m? Balancing Point 47.85 m2 10+401.97 10+610 a) Compute the limit of economic haul. b) Compute the free haul volume. c) Compute the overhaul volume.
The given data of a proposed Manila-Cavite Coastal Road is tabulated below. The free haul distance is 50 m and the cost of borrow is P420 per cu. m., cost pf excavation is P350 per cu. m. and the cost of haul is P21 per meter station. The ground surface is assume to be uniformly sloping. Area Station Cut Fill 10+160 41.13 m? Balancing Point 47.85 m2 10+401.97 10+610 a) Compute the limit of economic haul. b) Compute the free haul volume. c) Compute the overhaul volume.
Traffic and Highway Engineering
5th Edition
ISBN:9781305156241
Author:Garber, Nicholas J.
Publisher:Garber, Nicholas J.
Chapter14: Highway Surveys And Location
Section: Chapter Questions
Problem 15P
Related questions
Question
Expert Solution
This question has been solved!
Explore an expertly crafted, step-by-step solution for a thorough understanding of key concepts.
Step by step
Solved in 3 steps
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.Recommended textbooks for you
Traffic and Highway Engineering
Civil Engineering
ISBN:
9781305156241
Author:
Garber, Nicholas J.
Publisher:
Cengage Learning
Traffic and Highway Engineering
Civil Engineering
ISBN:
9781305156241
Author:
Garber, Nicholas J.
Publisher:
Cengage Learning