2. Determine the total cost of earthworks and draw the mass haul diagram of a highway section having the cumulative volume shown in the table below: Station No. 0 9 13 15 Cumulative 250 350 220 Volume Given that cost of overhaul = Php 750.00/m'.station, cost of borrow = Php 2500.00/m', cost of freehaul = Php 1250.00/m', and the free haul distance = 9 stations. %3D %3D %3D
2. Determine the total cost of earthworks and draw the mass haul diagram of a highway section having the cumulative volume shown in the table below: Station No. 0 9 13 15 Cumulative 250 350 220 Volume Given that cost of overhaul = Php 750.00/m'.station, cost of borrow = Php 2500.00/m', cost of freehaul = Php 1250.00/m', and the free haul distance = 9 stations. %3D %3D %3D
Fundamentals Of Construction Estimating
4th Edition
ISBN:9781337399395
Author:Pratt, David J.
Publisher:Pratt, David J.
Chapter10: Pricing Excavation And Backfill
Section: Chapter Questions
Problem 6RQ
Related questions
Question
Expert Solution
This question has been solved!
Explore an expertly crafted, step-by-step solution for a thorough understanding of key concepts.
This is a popular solution!
Trending now
This is a popular solution!
Step by step
Solved in 2 steps with 1 images
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.Recommended textbooks for you
Fundamentals Of Construction Estimating
Civil Engineering
ISBN:
9781337399395
Author:
Pratt, David J.
Publisher:
Cengage,
Traffic and Highway Engineering
Civil Engineering
ISBN:
9781305156241
Author:
Garber, Nicholas J.
Publisher:
Cengage Learning
Fundamentals Of Construction Estimating
Civil Engineering
ISBN:
9781337399395
Author:
Pratt, David J.
Publisher:
Cengage,
Traffic and Highway Engineering
Civil Engineering
ISBN:
9781305156241
Author:
Garber, Nicholas J.
Publisher:
Cengage Learning