Station 0 +00 1+00 2+00 Complete the earthwork calculation sheet and plot the resulting mass diagram. Knowing that the shrinkage factor is 0.90. > Calculate the maximum and the average haul distances for the balances sections in this project. > Is this a waste or borrow project, and how it much? End- End- Vol. Vol. Strip- Strip- of of area cut cut fill (sf) (st) (bcy) (ccy) ... 0 0 90 0 154 area fill 3+00 147 4+00 192 0 0 4+50 205 0 5+00 179 0 6+00 121 0 6+50 100 0 7+00 52 10 0 180 0 231 8+00 9+00 10+00 0285 Alge ping ping Total Total Ad), braio Mass fill cut fill fill sum ordi- (ccy) (bey) (ccy) (bey) (bcy) nate cut (bcy) 0.90 OOOO5248500 15 57 0 40 19 000000 20 3 18 24 21 0 19 43 0 10 0 8 0 69

Structural Analysis
6th Edition
ISBN:9781337630931
Author:KASSIMALI, Aslam.
Publisher:KASSIMALI, Aslam.
Chapter2: Loads On Structures
Section: Chapter Questions
Problem 1P
icon
Related questions
Question
Note:hand written solution should be avoided.
Station
> Complete the earthwork calculation sheet and plot the resulting mass diagram. Knowing
that the shrinkage factor is 0.90.
> Calculate the maximum and the average haul distances for the balances sections in this
project.
> Is this a waste or borrow project, and how it much?
End-
Alge
area:
area
of
of ping ping Total Total Adj. braio Mass
fill cut fill
cut
fill
cut
cut
fill
sum
ordi-
(sf) (st) (bcy) (ccy) (bcy) (ccy) (bcy) (ccy) (bcy) (bcy) nate
0.90
End- Vol. Vol. Strip Strip-
0 +00
0
1+00 0
2+00
3+00 147
4+00 192
4+50 205
179
5+00
6+00 121
6 +50
100
7+00
8+00
52
0
0 231
0 285
9 +00
10+00
0-
90
154
0
0
ន្តថ្មីទី៩០០០
0
0
CORRENGOBROL
៥ធ្នូ១០០០០០០១
0
0
15
50
43
19
57 0
24
21 0
10-
40
0
19
0
0
8 0
20
69
18
Transcribed Image Text:Station > Complete the earthwork calculation sheet and plot the resulting mass diagram. Knowing that the shrinkage factor is 0.90. > Calculate the maximum and the average haul distances for the balances sections in this project. > Is this a waste or borrow project, and how it much? End- Alge area: area of of ping ping Total Total Adj. braio Mass fill cut fill cut fill cut cut fill sum ordi- (sf) (st) (bcy) (ccy) (bcy) (ccy) (bcy) (ccy) (bcy) (bcy) nate 0.90 End- Vol. Vol. Strip Strip- 0 +00 0 1+00 0 2+00 3+00 147 4+00 192 4+50 205 179 5+00 6+00 121 6 +50 100 7+00 8+00 52 0 0 231 0 285 9 +00 10+00 0- 90 154 0 0 ន្តថ្មីទី៩០០០ 0 0 CORRENGOBROL ៥ធ្នូ១០០០០០០១ 0 0 15 50 43 19 57 0 24 21 0 10- 40 0 19 0 0 8 0 20 69 18
Expert Solution
trending now

Trending now

This is a popular solution!

steps

Step by step

Solved in 7 steps with 15 images

Blurred answer
Knowledge Booster
Methods to determine productivity
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.
Recommended textbooks for you
Structural Analysis
Structural Analysis
Civil Engineering
ISBN:
9781337630931
Author:
KASSIMALI, Aslam.
Publisher:
Cengage,
Structural Analysis (10th Edition)
Structural Analysis (10th Edition)
Civil Engineering
ISBN:
9780134610672
Author:
Russell C. Hibbeler
Publisher:
PEARSON
Principles of Foundation Engineering (MindTap Cou…
Principles of Foundation Engineering (MindTap Cou…
Civil Engineering
ISBN:
9781337705028
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning
Fundamentals of Structural Analysis
Fundamentals of Structural Analysis
Civil Engineering
ISBN:
9780073398006
Author:
Kenneth M. Leet Emeritus, Chia-Ming Uang, Joel Lanning
Publisher:
McGraw-Hill Education
Sustainable Energy
Sustainable Energy
Civil Engineering
ISBN:
9781337551663
Author:
DUNLAP, Richard A.
Publisher:
Cengage,
Traffic and Highway Engineering
Traffic and Highway Engineering
Civil Engineering
ISBN:
9781305156241
Author:
Garber, Nicholas J.
Publisher:
Cengage Learning