T-F According to the book, updating the schedule is needed every week, even if all duration or cost estimates are accurate and sequencing of the activities is exactly as originally scheduled.
Q: Need help, please show all work, steps, units and round to 3 significant figures. Thank you!
A: First, we need to determine the angle of the ramp. This can be done using the given dimensions and…
Q: I need detailed explanation solving this exercise from Foundation Engineering, step by step please.
A:
Q: "Write MATERIALS FOR MAKING CONCRETE Slump" One concrete grade was used for this laboratory…
A: Step 1: Gather and Prepare MaterialsEach ingredient needs to be carefully measured and…
Q: Please show all work, steps and round final answer to 3 sig figs.
A: Given force vectorF2=(−200i^+600j^−250k^)NF1 = 250 N in the negative z direction. In vector…
Q: I need detailed help solving this exercise from homework of Foundation Engineering. I do not really…
A: Given DataSand Layer: γ=18kN/m3,c=0kN/m2,ϕ=30∘Clay Layer: γ=18kN/m3,cu=35kN/m2,σ′=90kN/m2Water unit…
Q: Need help, please show all work, steps, units and round to 3 significant figures. Thank you!
A: First, we need to calculate the components of each force in the x, y, and z directions. For force…
Q: Q5 A piece of sandstone with a bulk volume of 1.3 cc is contained in a 5-cc cell filled with helium…
A: Here's a detailed step-by-step explanation to calculate the porosity of the sandstone, complete with…
Q: 2. (a) Figure Q2(a) shows a rigid-jointed frame ABCDE with respective flexural rigidity (E/)…
A:
Q: Part A The balloon has a mass of 30 g (empty) and it is filled with air having a temperature of 20…
A:
Q: Suppose you want to use one hydraulic hoe and a fleet of trucks on an excavation project. If you…
A: Step 1: Given data:Hydraulic hoe's loading cycle time = 2.5 minutesTruck cycle time = 32.0 minutesTo…
Q: 4.15 Compute the displacements, reactions, and internal forces for the system shown. E = 200,000…
A:
Q: thge numbers int he bottom corner are the answers
A: Given :Length of the pipe ( L ) = 1 km = 1000 metersDifference in levels between reservoirs ( h ) =…
Q: Make stimulation don't use Ai I،will vote your answer
A: The given state diagram is as follows: Now let us draw the circuit diagram
Q: Please Only answer if you draw Free body diagrams and show your work.
A:
Q: H.W 1: Determine the force in each member of the truss 24 kN 3 m E D A B 3 m 6 m F 3 m
A: please see below attached images for the solution:If you have concern please use the comment…
Q: (read image)
A: I hope this is helpful.
Q: Consider the beam shown in (Figure 1). Take w = 2.8 kip/ftkip/ft. Follow the sign convention. A…
A: According to the given situation, the diagram of the provided system is given below:The free-body…
Q: Consider two strata of the same soil material that lie between two channels. The first stratum is…
A:
Q: Please show all work, steps and round final answer to 3 sig figs.
A: Step 1:Segment AB: Length LAB=7.60 ftUniform varying load from w1=0 lb /ft at A to w1=14 lb /ft…
Q: Draw the stratigraphic correlation between the following three outcrops. (A), (B).(C) and (D).…
A: Approach to solving the question: through illustrating stratigraphic column. Detailed…
Q: 15.16 Calculate the strut loads per meter length for the braced excavation shown in Figure P15.16.…
A: I hope this is helpful.
Q: A project consists of replacing the track on an existing railroad line, involving 3,000 feet…
A: I hope this is helpful.
Q: A deposit of clay lies between two layers of sand as shown in Figure 1. The lower sand layer is…
A:
Q: 3 The top 7 m at a site consists of sandy silt, having bulk unit weight (Ym) of 16.5 kN/m² and…
A:
Q: Thumbs-up will be given. Please write the complete solutions and Write Legibly. A 289mm x 324mm…
A: The given values are as follows:Cross-sectional dimensions of the column: 289mm x 324mmEffective…
Q: H.W: find and ди 8/8 Əz as functions of u and v if: z=4en y, x = ln(ucosv), y=usin v
A: Note: you may also write "ln|u sin v|" in place of "ln(u sin v)".
Q: I need detailed help solving this exercise from homework of Foundation Engineering. I do not really…
A: (1.1) Forces Acting on the Failure WedgeWhen the retaining wall moves toward the backfill (passive…
Q: Thumbs-up will be given. Please write the complete solutions and Write Legibly. A 200mm square…
A: The formula for the maximum deflection of a simply supported beam under a point load at midspan is…
Q: 8-Fire resistive building with total area 1500m2 .Find the fire demand and fire storage for 6hours…
A: To solve this problem, we'll use a standard formula for fire demand and fire storage based on the…
Q: Please help solve, provide all units and steps and highlight answers.
A:
Q: Consider the geometric and traffic characteristics shown below. Approach (Width) Peak hour Approach…
A:
Q: I need detailed explanation solving this exercise from Reinforced Concrete, step by step please.
A:
Q: Need help, please show all work, steps, units and round to 3 significant figures. Thank you!
A:
Q: The 6 slugs uniform rod of length 20 in. is bent into the shape shown. The diameter of the rod is…
A: Step 1: Step 2: Step 3:
Q: Which of the following is not for BIM use in CM?, select all apply. Group of answer choices…
A: Facilities Management is not typically a Construction Management (CM) use of Building Information…
Q: USING THE SLOPE DEFLECTION METHOD, DRAW THE SHEAR AND MOMENT DIAGRAM. PLS SHOW YOUR FULL SOLUTION.
A:
Q: provides scholarly research for what are the impacts of digitalization and automation on the…
A: 1. Fernández-Macías (2018)Key Themes: Impact of Automation and Digitalization in Workforce…
Q: A company has been hired to carry out an assessment on a reinforced concrete railway tunnel which…
A: Step 1:Step 2:Step 3:Step 4:
Q: First draw a free body diagram then determine the reactions and forces in pin B for cases 1 and 2.
A: Step 1: Sketching the free body diagram (FBD) for case 1.For the beam AB,For the beam BC,At A there…
Q: A +5.1 percent grade intersects a -2.8 percent grade at station 68+70 at an elevation of 327.50 ft.…
A:
Q: The truss shown in Figure 1 carries a load of 'P' kN Analyze the truss system using the unit load…
A: More explain
Q: The beam has a breadth of 40mm and a depth of 60mm, E=210 GPa. The beam is 6m long, supported at…
A:
Q: I need detailed explanation solving this exercise from Foundation Engineering, step by step please.
A: Step 1: Step 2:Step 3: Step 4:
Q: For a flow of 15,000 m3/d containing 60 mg/L suspended solids, ferric sulfate is used as a…
A: I hope this is helpful.
Q: Note: Please provide a clear, step-by-step handwritten working out (no explanations!), ensuring it…
A:
Q: The block A and attached rod have a combined mass of 65 kg and are confined to move along the guide…
A:
Q: Problem 3 . For the beam and loadings shown in the figure, use the superposition method to determine…
A:
Q: please answer the questions in the picture, show all of your work please
A:
Q: A vertical curve with a design speed of 60 MPH has grades of -4 percent and +3 percent for the back…
A:
Q: Determine the reactions and calculate the force in each member of thetruss and state if the members…
A: I hope this is helpful.
True or false
help
Step by step
Solved in 2 steps
- Prepare a primavera schedule any project of your choice and show A) Lag B) Start To Start Relationship (S.S) C)Finish To Finish Relationship (F.F) Any where In the projectDevelop a CPM schedule using the information provided and making assumptions as needed identifying all major milestones, including general conditions and mobilizations and clean up. you may use ms project if wanted Project duration 67 days building an office building in a crowded area of a college 4 story building with glass and metal curtain wall /R/Conc frame story height (LF) 24.00 Floor area (SF) 72000 no basement building cost $11,439,000 Please assume any information needed.Using the same CPM diagram, what is the total project duration? Immediate Estimated Activity Activity Description Predecessors Duration A Excavate 2 weeks Lay the foundation Put up the rough wall Put up the roof Install the exterior plumbing Install the interior plumbing Put up the exterior siding Do the exterior painting B A 4 weeks C 10 weeks D C 6 weeks 4 weeks 5 weeks 7 weeks 9 weeks 7 weeks 8 weeks 4 weeks E C F E G D E, G Do the electrical work F, I Put up the wallboard Install the flooring Do the interior painting Install the exterior fixtures K 5 weeks M 2 weeks N Install the interior fixtures K, L 6 weeks Total = 79 weeks
- Hello, I have an exam and I need to answer all the optionsEngineering management , i need solutions in 15 minutes please.Q: Draw the allocation of resources chart on the earliest and latest start time for the project that its information shown below, and identify the most reasonable of them and why? D EFG Activities A K Events 1-2 1-3 2-4 2-5 3-4 4-7 4-8 5-6 6-9 7-9 8-9 Duration 5 4 3 2 1 4 resources 3 5 4 2 6 1 Add file 6.
- A particular project is scheduled to complete in Week 50 at a budgeted cost of $150,000. As of Week 30, an earned value chart is prepared to present the project progress as below: Status Date 160- 140 PV 120 100 80 AC 60 40- 20 10 15 20 25 30 35 40 45 50 Weeks 1. Calculate schedule, cost and time variances, as well as schedule and cost performance indices for Week 30. Then use this information to comment on the project progress at Week 30 (status date). 2. Based on the performance at Week 30, estimate the final project cost (EAC). Will the final project cost be higher or lower than the budgeted cost, and by how much? Also estimate the revised project completion date. Will the project complete sooner or later than the planned completion date, and by how many weeks? 000.S3. (1) Define critical path, ES, EF, LS, LF, dummy activity and slack. (2) Cables By Us is bringing a new product on line to be manufactured in their current facility in existing space. The owners have identified 11 activities and their precedence relationships. (a) Draw the network diagram of this project (b) Calculate the project completion time (c) Identify the critical path 日 OF 5 SONYonly do part A