Q5: a) The first time an engineer collected soil samples and tested the soil it took 39.5 days to complete the work. The second time the engineer did the work, it took 36.8 days. Using an improvement rate based on individual units, answer the following questions: a. How long will it take the engineer to complete the work for the 9th and 12th project? b. How much longer will it take to do the work on the 10th project than the 11th project? Q5: b) The cumulative average time to design 35 foundations is 5.2 days per foundation. The rate of learning for the activity is 0.87. a. How many days will be consumed in designing the first three foundations? (T1-3) b. How many days will be consumed in designing the 8th foundation? (Ts) 15 points 10 points

Principles of Geotechnical Engineering (MindTap Course List)
9th Edition
ISBN:9781305970939
Author:Braja M. Das, Khaled Sobhan
Publisher:Braja M. Das, Khaled Sobhan
Chapter2: Origin Of Soil And Grain Size
Section: Chapter Questions
Problem 2.9P: Repeat Problem 2.8 using the following data. 2.8 The following are the results of a sieve and...
Question

Q5/B with Explantion pls 

Q5: a) The first time an engineer collected soil samples and tested the soil it took 39.5 days
to complete the work. The second time the engineer did the work, it took 36.8 days.
Using an improvement rate based on individual units, answer the following questions:
a. How long will it take the engineer to complete the work for the 9th and 12th project?
b. How much longer will it take to do the work on the 10th project than the 11th project?
Q5: b) The cumulative average time to design 35 foundations is 5.2 days per foundation. The
rate of learning for the activity is 0.87.
a. How many days will be consumed in designing the first three foundations? (T1-3)
b. How many days will be consumed in designing the 8th foundation? (Ts)
15 points
10 points
Transcribed Image Text:Q5: a) The first time an engineer collected soil samples and tested the soil it took 39.5 days to complete the work. The second time the engineer did the work, it took 36.8 days. Using an improvement rate based on individual units, answer the following questions: a. How long will it take the engineer to complete the work for the 9th and 12th project? b. How much longer will it take to do the work on the 10th project than the 11th project? Q5: b) The cumulative average time to design 35 foundations is 5.2 days per foundation. The rate of learning for the activity is 0.87. a. How many days will be consumed in designing the first three foundations? (T1-3) b. How many days will be consumed in designing the 8th foundation? (Ts) 15 points 10 points
Expert Solution
steps

Step by step

Solved in 2 steps with 1 images

Blurred answer
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Principles of Geotechnical Engineering (MindTap C…
Principles of Geotechnical Engineering (MindTap C…
Civil Engineering
ISBN:
9781305970939
Author:
Braja M. Das, Khaled Sobhan
Publisher:
Cengage Learning
Fundamentals Of Construction Estimating
Fundamentals Of Construction Estimating
Civil Engineering
ISBN:
9781337399395
Author:
Pratt, David J.
Publisher:
Cengage,
Principles of Foundation Engineering (MindTap Cou…
Principles of Foundation Engineering (MindTap Cou…
Civil Engineering
ISBN:
9781337705028
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning
Fundamentals of Geotechnical Engineering (MindTap…
Fundamentals of Geotechnical Engineering (MindTap…
Civil Engineering
ISBN:
9781305635180
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning
Solid Waste Engineering
Solid Waste Engineering
Civil Engineering
ISBN:
9781305635203
Author:
Worrell, William A.
Publisher:
Cengage Learning,
Engineering Fundamentals: An Introduction to Engi…
Engineering Fundamentals: An Introduction to Engi…
Civil Engineering
ISBN:
9781305084766
Author:
Saeed Moaveni
Publisher:
Cengage Learning