PROBLEM: From the following data, prepare the following: a) Network Diagram b) The Early Start and The Early Finish c) The Last Start and The Last Finish d) The Float ACTIVITIES TIME DURATION IN WEEKS 1-2 Demolition and Clearing 8 2-3 Excavation 14 2-5 Underground Installation 3-4 Foundation and Columns 4-6 Construction of Second Floor 4-7 Roof Framing and Flooring 5-7 Ground Floor Slab 4 5-8 Mechanical and Electrical Services 12 6-7 Construction of Exterior Walls 12 7-9 Construction of Interior Partitions 10 8-9 Mechanical and Electrical Equipment and 12 Fixtures 9-10 Painting and Finishing Work 8. 6,

Structural Analysis
6th Edition
ISBN:9781337630931
Author:KASSIMALI, Aslam.
Publisher:KASSIMALI, Aslam.
Chapter2: Loads On Structures
Section: Chapter Questions
Problem 1P
icon
Related questions
icon
Concept explainers
Question
100%
PROBLEM:
From the following data, prepare the following:
a) Network Diagram
b) The Early Start and The Early Finish
c) The Last Start and The Last Finish
d) The Float
ACTIVITIES
TIME
DURATION IN
WEEKS
1-2 Demolition and Clearing
8
2-3 Excavation
14
2-5 Underground Installation
3-4 Foundation and Columns
4-6 Construction of Second Floor
4-7 Roof Framing and Flooring
5-7 Ground Floor Slab
4
5-8 Mechanical and Electrical Services
12
6-7 Construction of Exterior Walls
12
7-9 Construction of Interior Partitions
10
8-9 Mechanical and Electrical Equipment and
12
Fixtures
9-10 Painting and Finishing Work
8.
6,
Transcribed Image Text:PROBLEM: From the following data, prepare the following: a) Network Diagram b) The Early Start and The Early Finish c) The Last Start and The Last Finish d) The Float ACTIVITIES TIME DURATION IN WEEKS 1-2 Demolition and Clearing 8 2-3 Excavation 14 2-5 Underground Installation 3-4 Foundation and Columns 4-6 Construction of Second Floor 4-7 Roof Framing and Flooring 5-7 Ground Floor Slab 4 5-8 Mechanical and Electrical Services 12 6-7 Construction of Exterior Walls 12 7-9 Construction of Interior Partitions 10 8-9 Mechanical and Electrical Equipment and 12 Fixtures 9-10 Painting and Finishing Work 8. 6,
Expert Solution
steps

Step by step

Solved in 2 steps with 2 images

Blurred answer
Knowledge Booster
Pricing concrete work
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.
Similar questions
Recommended textbooks for you
Structural Analysis
Structural Analysis
Civil Engineering
ISBN:
9781337630931
Author:
KASSIMALI, Aslam.
Publisher:
Cengage,
Structural Analysis (10th Edition)
Structural Analysis (10th Edition)
Civil Engineering
ISBN:
9780134610672
Author:
Russell C. Hibbeler
Publisher:
PEARSON
Principles of Foundation Engineering (MindTap Cou…
Principles of Foundation Engineering (MindTap Cou…
Civil Engineering
ISBN:
9781337705028
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning
Fundamentals of Structural Analysis
Fundamentals of Structural Analysis
Civil Engineering
ISBN:
9780073398006
Author:
Kenneth M. Leet Emeritus, Chia-Ming Uang, Joel Lanning
Publisher:
McGraw-Hill Education
Sustainable Energy
Sustainable Energy
Civil Engineering
ISBN:
9781337551663
Author:
DUNLAP, Richard A.
Publisher:
Cengage,
Traffic and Highway Engineering
Traffic and Highway Engineering
Civil Engineering
ISBN:
9781305156241
Author:
Garber, Nicholas J.
Publisher:
Cengage Learning