Problem 6 A truck is ruptured and releases a non-reactive liquid into a streamline, which drains into a retention pond with a 20,000 m³ liquid volume. The streamline has a velocity of 0.10 m/s and a flow rate of 0.10 m³/s. It is 5000 m from the spill site to the pond. Assume that the pond operates like a CSTR with balanced flow (Qin=Qout) a) Calculate the time required to reach the pond (in days) b) Estimate the time it will take to flush the following percentages of the liquid from the pond. Fill the table below. Flushing percentage (%) 20 Time (minutes) 40 60 80 90 Note: This is a case of flushing a nonreactive contaminant from a CSTR. Q 0.10 m³/s น 0.10 m/s Stream line L 5000 m Retention pond V-20,000 m³

Structural Analysis
6th Edition
ISBN:9781337630931
Author:KASSIMALI, Aslam.
Publisher:KASSIMALI, Aslam.
Chapter2: Loads On Structures
Section: Chapter Questions
Problem 1P
icon
Related questions
Question

Problem 6 

A truck is ruptured and releases a non-reactive liquid into a streamline, which drains into a retention pond with a 20,000 m3 liquid volume. The streamline has a velocity of 0.10 m/s and a flow rate of 0.10 m3/s. It is 5000 m from the spill site to the pond. Assume that the pond operates like a CSTR with balanced flow (Qin=Qout

  1. Calculate the time required to reach the pond (in days) 
  1. Estimate the time it will take to flush the following percentages of the liquid from the pond.
Problem 6
A truck is ruptured and releases a non-reactive liquid into a streamline, which drains into a retention pond
with a 20,000 m³ liquid volume. The streamline has a velocity of 0.10 m/s and a flow rate of 0.10 m³/s. It is
5000 m from the spill site to the pond. Assume that the pond operates like a CSTR with balanced flow
(Qin=Qout)
a) Calculate the time required to reach the pond (in days)
b) Estimate the time it will take to flush the following percentages of the liquid from the pond.
Fill the table below.
Flushing percentage (%)
20
Time (minutes)
40
60
80
90
Note: This is a case of flushing a nonreactive contaminant from a CSTR.
Q
0.10 m³/s
น
0.10 m/s
Stream line
L
5000 m
Retention pond
V-20,000 m³
Transcribed Image Text:Problem 6 A truck is ruptured and releases a non-reactive liquid into a streamline, which drains into a retention pond with a 20,000 m³ liquid volume. The streamline has a velocity of 0.10 m/s and a flow rate of 0.10 m³/s. It is 5000 m from the spill site to the pond. Assume that the pond operates like a CSTR with balanced flow (Qin=Qout) a) Calculate the time required to reach the pond (in days) b) Estimate the time it will take to flush the following percentages of the liquid from the pond. Fill the table below. Flushing percentage (%) 20 Time (minutes) 40 60 80 90 Note: This is a case of flushing a nonreactive contaminant from a CSTR. Q 0.10 m³/s น 0.10 m/s Stream line L 5000 m Retention pond V-20,000 m³
Expert Solution
steps

Step by step

Solved in 2 steps with 3 images

Blurred answer
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Structural Analysis
Structural Analysis
Civil Engineering
ISBN:
9781337630931
Author:
KASSIMALI, Aslam.
Publisher:
Cengage,
Structural Analysis (10th Edition)
Structural Analysis (10th Edition)
Civil Engineering
ISBN:
9780134610672
Author:
Russell C. Hibbeler
Publisher:
PEARSON
Principles of Foundation Engineering (MindTap Cou…
Principles of Foundation Engineering (MindTap Cou…
Civil Engineering
ISBN:
9781337705028
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning
Fundamentals of Structural Analysis
Fundamentals of Structural Analysis
Civil Engineering
ISBN:
9780073398006
Author:
Kenneth M. Leet Emeritus, Chia-Ming Uang, Joel Lanning
Publisher:
McGraw-Hill Education
Sustainable Energy
Sustainable Energy
Civil Engineering
ISBN:
9781337551663
Author:
DUNLAP, Richard A.
Publisher:
Cengage,
Traffic and Highway Engineering
Traffic and Highway Engineering
Civil Engineering
ISBN:
9781305156241
Author:
Garber, Nicholas J.
Publisher:
Cengage Learning