Using the AASHTO design procedure design a new flexible pavement for a major interstate highway using the following conditions: Pavement location: Urban Pavement functional classification: Interstate Number of lanes: 3 lanes in each direction Annual growth rate: Assume 2% Design period: 30 years Construction Materials: Surface course: HMA mix with a nominal maximum aggregate size of 1/2 inch, with E- 500,000 psi Binder course: Dense graded HMA mix with a nominal maximum aggregate size of 1 inch. Use E 500,000 psi Base course: Crushed aggregate with MR -28,000 psi Subbase course: Not used Subgrade: MR 15,000 psi in the dry months of May through October Mx 12,500 psi in the wet months of November through April Reliability: R 90% Overall standard deviation (S.): 0.45 (typical for flexible pavements) Traffic count: Single unit trucks (assume 0.40 ESALS per truck) - 1872/day Double unit trucks (assume 1.00 ESALS per truck) - 1762/day Truck trains - trucks with more than 2 units (assume 1.75 ESALS per truck)-247/day Drainage condition: Time to drain is 1 week, the pavement is expected to be saturated about 15% of the time
Using the AASHTO design procedure design a new flexible pavement for a major interstate highway using the following conditions: Pavement location: Urban Pavement functional classification: Interstate Number of lanes: 3 lanes in each direction Annual growth rate: Assume 2% Design period: 30 years Construction Materials: Surface course: HMA mix with a nominal maximum aggregate size of 1/2 inch, with E- 500,000 psi Binder course: Dense graded HMA mix with a nominal maximum aggregate size of 1 inch. Use E 500,000 psi Base course: Crushed aggregate with MR -28,000 psi Subbase course: Not used Subgrade: MR 15,000 psi in the dry months of May through October Mx 12,500 psi in the wet months of November through April Reliability: R 90% Overall standard deviation (S.): 0.45 (typical for flexible pavements) Traffic count: Single unit trucks (assume 0.40 ESALS per truck) - 1872/day Double unit trucks (assume 1.00 ESALS per truck) - 1762/day Truck trains - trucks with more than 2 units (assume 1.75 ESALS per truck)-247/day Drainage condition: Time to drain is 1 week, the pavement is expected to be saturated about 15% of the time
Chapter2: Loads On Structures
Section: Chapter Questions
Problem 1P
Related questions
Question
100%
please help with transportation problem. please make sure it is correct. Will thumbs up if correct.
Expert Solution
This question has been solved!
Explore an expertly crafted, step-by-step solution for a thorough understanding of key concepts.
This is a popular solution!
Trending now
This is a popular solution!
Step by step
Solved in 2 steps with 6 images
Recommended textbooks for you
Structural Analysis (10th Edition)
Civil Engineering
ISBN:
9780134610672
Author:
Russell C. Hibbeler
Publisher:
PEARSON
Principles of Foundation Engineering (MindTap Cou…
Civil Engineering
ISBN:
9781337705028
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning
Structural Analysis (10th Edition)
Civil Engineering
ISBN:
9780134610672
Author:
Russell C. Hibbeler
Publisher:
PEARSON
Principles of Foundation Engineering (MindTap Cou…
Civil Engineering
ISBN:
9781337705028
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning
Fundamentals of Structural Analysis
Civil Engineering
ISBN:
9780073398006
Author:
Kenneth M. Leet Emeritus, Chia-Ming Uang, Joel Lanning
Publisher:
McGraw-Hill Education
Traffic and Highway Engineering
Civil Engineering
ISBN:
9781305156241
Author:
Garber, Nicholas J.
Publisher:
Cengage Learning