Problem 6 A truck is ruptured and releases a non-reactive liquid into a streamline, which drains into a retention pond with a 20,000 m³ liquid volume. The streamline has a velocity of 0.10 m/s and a flow rate of 0.10 m³/s. It is 5000 m from the spill site to the pond. Assume that the pond operates like a CSTR with balanced flow (Qin=Qout) a) Calculate the time required to reach the pond (in days) b) Estimate the time it will take to flush the following percentages of the liquid from the pond. Fill the table below. Flushing percentage (%) 20 Time (minutes) 40 60 80 90 Note: This is a case of flushing a nonreactive contaminant from a CSTR. Q 0.10 m³/s น 0.10 m/s Stream line 5000 m Retention pond V-20,000 m³

Fundamentals of Geotechnical Engineering (MindTap Course List)
5th Edition
ISBN:9781305635180
Author:Braja M. Das, Nagaratnam Sivakugan
Publisher:Braja M. Das, Nagaratnam Sivakugan
Chapter7: Seepage
Section: Chapter Questions
Problem 7.6P
icon
Related questions
Question
Problem 6
A truck is ruptured and releases a non-reactive liquid into a streamline, which drains into a retention pond
with a 20,000 m³ liquid volume. The streamline has a velocity of 0.10 m/s and a flow rate of 0.10 m³/s. It is
5000 m from the spill site to the pond. Assume that the pond operates like a CSTR with balanced flow
(Qin=Qout)
a) Calculate the time required to reach the pond (in days)
b) Estimate the time it will take to flush the following percentages of the liquid from the pond.
Fill the table below.
Flushing percentage (%)
20
Time (minutes)
40
60
80
90
Note: This is a case of flushing a nonreactive contaminant from a CSTR.
Q 0.10 m³/s
น
0.10 m/s
Stream line
5000 m
Retention pond
V-20,000 m³
Transcribed Image Text:Problem 6 A truck is ruptured and releases a non-reactive liquid into a streamline, which drains into a retention pond with a 20,000 m³ liquid volume. The streamline has a velocity of 0.10 m/s and a flow rate of 0.10 m³/s. It is 5000 m from the spill site to the pond. Assume that the pond operates like a CSTR with balanced flow (Qin=Qout) a) Calculate the time required to reach the pond (in days) b) Estimate the time it will take to flush the following percentages of the liquid from the pond. Fill the table below. Flushing percentage (%) 20 Time (minutes) 40 60 80 90 Note: This is a case of flushing a nonreactive contaminant from a CSTR. Q 0.10 m³/s น 0.10 m/s Stream line 5000 m Retention pond V-20,000 m³
Expert Solution
steps

Step by step

Solved in 2 steps with 3 images

Blurred answer
Recommended textbooks for you
Fundamentals of Geotechnical Engineering (MindTap…
Fundamentals of Geotechnical Engineering (MindTap…
Civil Engineering
ISBN:
9781305635180
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning
Traffic and Highway Engineering
Traffic and Highway Engineering
Civil Engineering
ISBN:
9781305156241
Author:
Garber, Nicholas J.
Publisher:
Cengage Learning
Sustainable Energy
Sustainable Energy
Civil Engineering
ISBN:
9781337551663
Author:
DUNLAP, Richard A.
Publisher:
Cengage,
Solid Waste Engineering
Solid Waste Engineering
Civil Engineering
ISBN:
9781305635203
Author:
Worrell, William A.
Publisher:
Cengage Learning,
Principles of Geotechnical Engineering (MindTap C…
Principles of Geotechnical Engineering (MindTap C…
Civil Engineering
ISBN:
9781305970939
Author:
Braja M. Das, Khaled Sobhan
Publisher:
Cengage Learning
Principles of Foundation Engineering (MindTap Cou…
Principles of Foundation Engineering (MindTap Cou…
Civil Engineering
ISBN:
9781337705028
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning