Problem 1 (20%) Problem 19-1 in Roess, Prassas, McShane, 5th ed. Signals are being installed and timed for three intersections along a major rural arterial. Some relevant data is available for the arterial at the three intersections, as shown in the table below. It may be assumed that sight distances to left-turning vehicles are adequate in all cases. Which movements would likely require protected phasing for LTs, and why? VLT Vo No. of Opposing Avg Speed of Opposing No. of LT Crashes No. of LT Intersection Direction (veh/h) (veh/h) Lanes Traffic in 3 Yrs Lanes Provided 1 EB 100 1,200 3 50 mi/h WB 120 1,400 3 50 mi/h 2 EB 250 1,800 3 40 mi/h WB 220 2,000 3 40 mi/h 10 22 5880 1 1 2 3 EB 85 1,000 3 50 mi/h 3 1 WB 90 1,000 3 50 mi/h 4

Traffic and Highway Engineering
5th Edition
ISBN:9781305156241
Author:Garber, Nicholas J.
Publisher:Garber, Nicholas J.
Chapter8: Intersection Control
Section: Chapter Questions
Problem 8P
icon
Related questions
Question
Problem 1 (20%)
Problem 19-1 in Roess, Prassas, McShane, 5th ed.
Signals are being installed and timed for three intersections along a major rural arterial. Some relevant
data is available for the arterial at the three intersections, as shown in the table below. It may be assumed
that sight distances to left-turning vehicles are adequate in all cases. Which movements would likely
require protected phasing for LTs, and why?
VLT
Vo
No. of
Opposing
Avg Speed
of
Opposing
No. of
LT Crashes
No. of LT
Intersection Direction (veh/h)
(veh/h)
Lanes
Traffic
in 3 Yrs
Lanes
Provided
1
EB
100
1,200
3
50 mi/h
WB
120
1,400
3
50 mi/h
2
EB
250
1,800
3
40 mi/h
WB
220
2,000
3
40 mi/h
10
22
5880
1
1
2
3
EB
85
1,000
3
50 mi/h
3
1
WB
90
1,000
3
50 mi/h
4
Transcribed Image Text:Problem 1 (20%) Problem 19-1 in Roess, Prassas, McShane, 5th ed. Signals are being installed and timed for three intersections along a major rural arterial. Some relevant data is available for the arterial at the three intersections, as shown in the table below. It may be assumed that sight distances to left-turning vehicles are adequate in all cases. Which movements would likely require protected phasing for LTs, and why? VLT Vo No. of Opposing Avg Speed of Opposing No. of LT Crashes No. of LT Intersection Direction (veh/h) (veh/h) Lanes Traffic in 3 Yrs Lanes Provided 1 EB 100 1,200 3 50 mi/h WB 120 1,400 3 50 mi/h 2 EB 250 1,800 3 40 mi/h WB 220 2,000 3 40 mi/h 10 22 5880 1 1 2 3 EB 85 1,000 3 50 mi/h 3 1 WB 90 1,000 3 50 mi/h 4
AI-Generated Solution
AI-generated content may present inaccurate or offensive content that does not represent bartleby’s views.
steps

Unlock instant AI solutions

Tap the button
to generate a solution

Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Traffic and Highway Engineering
Traffic and Highway Engineering
Civil Engineering
ISBN:
9781305156241
Author:
Garber, Nicholas J.
Publisher:
Cengage Learning