In a proposed highway undergoing road earthworks, the given roadway cross-section notes are as follows: STA 20 + 100 2.30 -6.45 1.50 0.00 1.00 4.50 STA 20+ 300 2.00 -6.00 1.20 0.00 2.60 6.90 Width of the roadway is to be determined using side slope of xH:1V where x is the unknown horizontal side of the slope. Show and draw plotted points of the cross-section of roadway each station. Calculate the following: 1. Total number of man-days to finish the earthwork job 2. Total cost of machine rentals to finish the earthwork job. In the inventory of available heavy equipment on site are two (2) hydraulic excavators with bucket payload capacity each of 0.76m³ and one (2) hydraulic excavator with bucket payload capacity of 1.15m3 The hourly production of each excavator with 100% efficiency are 149m³ and 196m respectively. Daily machine rental fees for smaller capacity is 1,200 pesos while bigger capacity costs 2,200 pesos. Daily machine operation is limited to 8 hours.
In a proposed highway undergoing road earthworks, the given roadway cross-section notes are as follows: STA 20 + 100 2.30 -6.45 1.50 0.00 1.00 4.50 STA 20+ 300 2.00 -6.00 1.20 0.00 2.60 6.90 Width of the roadway is to be determined using side slope of xH:1V where x is the unknown horizontal side of the slope. Show and draw plotted points of the cross-section of roadway each station. Calculate the following: 1. Total number of man-days to finish the earthwork job 2. Total cost of machine rentals to finish the earthwork job. In the inventory of available heavy equipment on site are two (2) hydraulic excavators with bucket payload capacity each of 0.76m³ and one (2) hydraulic excavator with bucket payload capacity of 1.15m3 The hourly production of each excavator with 100% efficiency are 149m³ and 196m respectively. Daily machine rental fees for smaller capacity is 1,200 pesos while bigger capacity costs 2,200 pesos. Daily machine operation is limited to 8 hours.
Chapter2: Loads On Structures
Section: Chapter Questions
Problem 1P
Related questions
Question

Transcribed Image Text:In a proposed highway undergoing road earthworks, the given roadway cross-section notes are as follows:
STA 20 + 100
2.30
-6.45
1.50
0.00
1.00
4.50
2.00
-6.00
2.60
6.90
STA 20+ 300
1.20
0.00
Width of the roadway is to be determined using side slope of xH:1V where x is the unknown horizontal side
of the slope. Show and draw plotted points of the cross-section of roadway each station. Calculate the
following:
1. Total number of man-days to finish the earthwork job
2. Total cost of machine rentals to finish the earthwork job.
In the inventory of available heavy equipment on site are two (2) hydraulic excavators with bucket payload
capacity each of 0.76m³ and one (2) hydraulic excavator with bucket payload capacity of 1.15m³. The hourly
production of each excavator with 100% efficiency are 149m³ and 196m³ respectively. Daily machine rental
fees for smaller capacity is 1,200 pesos while bigger capacity costs 2,200 pesos. Daily machine operation
is limited to 8 hours.
Expert Solution

This question has been solved!
Explore an expertly crafted, step-by-step solution for a thorough understanding of key concepts.
Step by step
Solved in 6 steps with 6 images

Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.Recommended textbooks for you


Structural Analysis (10th Edition)
Civil Engineering
ISBN:
9780134610672
Author:
Russell C. Hibbeler
Publisher:
PEARSON

Principles of Foundation Engineering (MindTap Cou…
Civil Engineering
ISBN:
9781337705028
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning


Structural Analysis (10th Edition)
Civil Engineering
ISBN:
9780134610672
Author:
Russell C. Hibbeler
Publisher:
PEARSON

Principles of Foundation Engineering (MindTap Cou…
Civil Engineering
ISBN:
9781337705028
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning

Fundamentals of Structural Analysis
Civil Engineering
ISBN:
9780073398006
Author:
Kenneth M. Leet Emeritus, Chia-Ming Uang, Joel Lanning
Publisher:
McGraw-Hill Education


Traffic and Highway Engineering
Civil Engineering
ISBN:
9781305156241
Author:
Garber, Nicholas J.
Publisher:
Cengage Learning