Two tangents converge at an angle 27.4 degrees, which were connected by a reverse curve having common radius. The direction of the second tangent is due to East which is having a shortest distance to the first vertex of 163.04 meters. Station PC is at 10+615.2 and the bearing of the common tangent is S 44.3 E. Compute for the total cost of the curve from PC to PT in pesos. The following are the cost index and specification: Type of Pavement - Item 311 (Portland Cement Concrete Pavement) Number of Lanes-3 Lanes Width of Pavement - 4.0 m per lane Thickness of Pavement 15.1 cm Unit Cost - Php 1,585.93 per cubic meters

Structural Analysis
6th Edition
ISBN:9781337630931
Author:KASSIMALI, Aslam.
Publisher:KASSIMALI, Aslam.
Chapter2: Loads On Structures
Section: Chapter Questions
Problem 1P
icon
Related questions
Question
Two tangents converge at an angle 27.4 degrees, which were connected by a reverse
curve having common radius. The direction of the second tangent is due to East which is
having a shortest distance to the first vertex of 163.04 meters. Station PC is at 10+615.2
and the bearing of the common tangent is S 44.3 E. Compute for the total cost of the
curve from PC to PT in pesos.
The following are the cost index and specification:
Type of Pavement - Item 311 (Portland Cement Concrete Pavement)
Number of Lanes- 3 Lanes
Width of Pavement - 4.0 m per lane
Thickness of Pavement 15.1 cm
Unit Cost - Php 1,585.93 per cubic meters
Transcribed Image Text:Two tangents converge at an angle 27.4 degrees, which were connected by a reverse curve having common radius. The direction of the second tangent is due to East which is having a shortest distance to the first vertex of 163.04 meters. Station PC is at 10+615.2 and the bearing of the common tangent is S 44.3 E. Compute for the total cost of the curve from PC to PT in pesos. The following are the cost index and specification: Type of Pavement - Item 311 (Portland Cement Concrete Pavement) Number of Lanes- 3 Lanes Width of Pavement - 4.0 m per lane Thickness of Pavement 15.1 cm Unit Cost - Php 1,585.93 per cubic meters
Expert Solution
trending now

Trending now

This is a popular solution!

steps

Step by step

Solved in 2 steps with 2 images

Blurred answer
Knowledge Booster
Control survey and geodetic reductions
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Structural Analysis
Structural Analysis
Civil Engineering
ISBN:
9781337630931
Author:
KASSIMALI, Aslam.
Publisher:
Cengage,
Structural Analysis (10th Edition)
Structural Analysis (10th Edition)
Civil Engineering
ISBN:
9780134610672
Author:
Russell C. Hibbeler
Publisher:
PEARSON
Principles of Foundation Engineering (MindTap Cou…
Principles of Foundation Engineering (MindTap Cou…
Civil Engineering
ISBN:
9781337705028
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning
Fundamentals of Structural Analysis
Fundamentals of Structural Analysis
Civil Engineering
ISBN:
9780073398006
Author:
Kenneth M. Leet Emeritus, Chia-Ming Uang, Joel Lanning
Publisher:
McGraw-Hill Education
Sustainable Energy
Sustainable Energy
Civil Engineering
ISBN:
9781337551663
Author:
DUNLAP, Richard A.
Publisher:
Cengage,
Traffic and Highway Engineering
Traffic and Highway Engineering
Civil Engineering
ISBN:
9781305156241
Author:
Garber, Nicholas J.
Publisher:
Cengage Learning